大学英语四级考试流程及详细分数分布_第1页
大学英语四级考试流程及详细分数分布_第2页
大学英语四级考试流程及详细分数分布_第3页
大学英语四级考试流程及详细分数分布_第4页
大学英语四级考试流程及详细分数分布_第5页
已阅读5页,还剩7页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、大学英语四级考试流程:8:509:00 试音时间9:009:10 播放考场指令,发放作文考卷9:10 取下耳机,开始作文考试9:35 发放含有快速阅读的试题册(但9:40才允许开始做)9:409:55 做快速阅读 (15分钟)9:5510:00 收答题卡一(即作文和快速阅读)9:5510:00 重新戴上耳机,试音寻台,准备听力考试10:00 开始听力考试,电台开始放音听力结束后完成剩余考项。11:20全部考试结束。新题型英语四级各题详细分值1.作文:15,,合106.5分;2.快速阅读:10,合71分,每个7.1分; 10个3.听力客观题(单选):25,合177.5分每个7.1分; 4.听力主

2、观题(复合式听写):10,合71分,前八个每个3.55分共28.4分,后三个每个14.2分,共42.6分; (共11个) 5.阅读短句问答:10%合71分,每个14.2分; 5个6.仔细阅读理解:15,合106.5分,共10个每个10.65分。 7.完形填空:10,合71分,共20个每个3.55分。 8.句子翻译:5,合35.5分,共5个,每个7.1分。 the oil level to the normal oil level. (2)for the secondary prevention of the leakage of cooling water pipefittings, valv

3、e parts before installation to check . 4.2 measures toeliminate quality defects of cables cable laying in front of the cableconstruction, design, supervision and construction units to deliver thedesign, and drawing the third. Combined the engineering field to findfault, adding omitted items. Because

4、 the unit used computer DCS controland adds a great deal of control and signal cables. So you shouldcarefully review, checks for missing physical cable, ready forconstruction and to verify cable length, specifications, familiar withthe cable channel and the device location and bracket cable bracket

5、onthe section number. At the time of preparation of the inventory of cable,first of all, the professional carefully study electrical schematics, inaccordance with the principle of accounting the cable path cable volume,the number of cores used, total volume and design inventory check cableto cable w

6、ith and without omission, laying of the cable in order toensure the process does not put a cable one cable. Finally, at the timeof inventory, prepared to take the same path the cables together.Inventory preparation is completed, later in each enclosure affixed onboth sides of each side of the cable

7、you want to lay accurately verifycable lengths and set aside. Bridge should be combined, correctingerrors, avoid straight, no cable bridge scaffolding used in theconstruction, not allowed to use electricity (fire) cutting, fix cabletray, cable tray is not allowed as a welding ground connection or ca

8、bletray cannot be used for other processes9.加起来总计:100,合710分。1.作文分数占总分的15%,也就是106.5分,在这部分你要达到63.9分为及格。答题时间为30分钟。2.快速阅读占总分的10%,即71分,在这部分你要达到42.6分为及格分。题号为1-10题,答题时间为15分钟。3.听力部分占总分的35%,即248.5分,在这部分的及格分为149.1分。题号为11-35题,答题时间为35分钟。4.是一篇篇章词汇理解和两篇传统的阅读理解,总分数为177.5分。在这部分你要达到106.5分为及格分。题好为36-66。答题时间为25分钟。5.是完

9、形填空(或改错),占总分的10%,即71分,在这部分你要达到42.6分及格。题号67-86,答题时间为15分钟。 6.翻译,汉译英并且需译部分只是一般的短句翻译。占总分的5%,即35.5分,在这部分你要达到21.3分为及格,题号为87-91,答题时间是15分钟四级听力题目构成与比例小对话: 8% 选择题 共8段小对话,8道题 ,放音一遍长对话: 7% 选择题 共2段长对话,7道题,放音一遍(短文听力: 10% 选择题 共3篇文章,10道题,放音一遍)复合式听写:10% 听写填空 填8个单词和3句话,放音三遍听力位于考试的卷二部分,共占全卷35%the oil level to the norm

10、al oil level. (2) for the secondaryprevention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliver the design,

11、anddrawing the third. Combined the engineering field to find fault, addingomitted items. Because the unit used computer DCS control and adds agreat deal of control and signal cables. So you should carefully review,checks for missing physical cable, ready for construction and to verifycable length, s

12、pecifications, familiar with the cable channel and thedevice location and bracket cable bracket on the section number. At thetime of preparation of the inventory of cable, first of all, theprofessional carefully study electrical schematics, in accordance withthe principle of accounting the cable pat

13、h cable volume, the number ofcores used, total volume and design inventory check cable to cable withand without omission, laying of the cable in order to ensure the processdoes not put a cable one cable. Finally, at the time of inventory,prepared to take the same path the cables together. Inventoryp

14、reparation is completed, later in each enclosure affixed on both sidesof each side of the cable you want to lay accurately verify cablelengths and set aside. Bridge should be combined, correcting errors,avoid straight, no cable bridge scaffolding used in the construction,not allowed to use electrici

15、ty (fire) cutting, fix cable tray, cabletray is not allowed as a welding ground connection or cable tray cannotbe used for other processesCET4考试流程时间 项目 说明开始入凭准考证、身份证,检查准考证上的考场号8:45 场 是否与本考场相符,不携带违规物品入场。迟到考生禁止入场。发答题卡1和答题卡2。只能用黑色字迹签入场结9:00 字笔在答题卡上填写姓名、准考证号,用束 2B铅笔涂黑相应的信息点。暂不填写答题卡2上试卷代号一栏。不能提前答题。考试正式开始

16、。考生做试题的第一部分,即考试开9:10 写作部分(用黑色字迹签字笔答题)。考试始 全程,考生不得提前退场。监考员发试题册。将试题册背面向上放到考发试题生桌子左上角,并要求考生不得提前翻阅或9:35 册 改变试卷位置,否则按违规违纪处理。考生不能提前翻阅试题册。写作部分考试结束。考生打开试题册,开始写作结做试题的第二部分,即快速阅读理解部分, 9:40 束 15分钟后(即9:55)结束快速阅读理解部分的答题。收答题收答题卡1。收卷期间考生不得答题,否则9:55 卡1作违规违纪处理。听力考试正式开始。监考员播放听力磁带。注:考试听力磁带AB双面都有内容。A面内容播放完后将有提示语,提示监考教师将

17、磁带手动转换到B面,请不要使用录音机的听力考10:00 自动翻面功能。提示语为:“A面内容已结试开始 束,请监考教师听到嘀的一声后,手动将磁带转换到B面继续播放”。听力考试结束后,考生开始做试题的第四部分。离考试结束还有十分钟,将试题册封面上的填写试11:10 试卷代号填涂在答题卡2上试卷代号一卷代号 栏。考试结束,立即停止答题。监考员验收各考生试题册和答题卡2,清点考试结11:20 无误后,组织考生退场(严禁考生带走试题束 册和答题卡)。违规违纪考生在登记表上签字确认。the oil level to the normal oil level. (2) for the secondarypr

18、evention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliver the design, anddrawing the third. Combined the en

19、gineering field to find fault, addingomitted items. Because the unit used computer DCS control and adds agreat deal of control and signal cables. So you should carefully review,checks for missing physical cable, ready for construction and to verifycable length, specifications, familiar with the cabl

20、e channel and thedevice location and bracket cable bracket on the section number. At thetime of preparation of the inventory of cable, first of all, theprofessional carefully study electrical schematics, in accordance withthe principle of accounting the cable path cable volume, the number ofcores us

21、ed, total volume and design inventory check cable to cable withand without omission, laying of the cable in order to ensure the processdoes not put a cable one cable. Finally, at the time of inventory,prepared to take the same path the cables together. Inventorypreparation is completed, later in eac

22、h enclosure affixed on both sidesof each side of the cable you want to lay accurately verify cablelengths and set aside. Bridge should be combined, correcting errors,avoid straight, no cable bridge scaffolding used in the construction,not allowed to use electricity (fire) cutting, fix cable tray, ca

23、bletray is not allowed as a welding ground connection or cable tray cannotbe used for other processes题型 分值 所占比例 题数每小题分数写作 106.5分 15% 1题106.5分/题快速阅读 71分10% 10题7.1分/题 听 客观题 177.5分 25% 25题(单选) 7.1分/题 力 主观题 前8题28.4分 8题(复合10% 3.55分式听写) /题后3题42.6分 3题14.2/题选词填空 71分10% 10题7.1分/题阅读理解 106.5分 15% 10题the oil le

24、vel to the normal oil level. (2) for the secondaryprevention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliv

25、er the design, anddrawing the third. Combined the engineering field to find fault, addingomitted items. Because the unit used computer DCS control and adds agreat deal of control and signal cables. So you should carefully review,checks for missing physical cable, ready for construction and to verify

26、cable length, specifications, familiar with the cable channel and thedevice location and bracket cable bracket on the section number. At thetime of preparation of the inventory of cable, first of all, theprofessional carefully study electrical schematics, in accordance withthe principle of accountin

27、g the cable path cable volume, the number ofcores used, total volume and design inventory check cable to cable withand without omission, laying of the cable in order to ensure the processdoes not put a cable one cable. Finally, at the time of inventory,prepared to take the same path the cables toget

28、her. Inventorypreparation is completed, later in each enclosure affixed on both sidesof each side of the cable you want to lay accurately verify cablelengths and set aside. Bridge should be combined, correcting errors,avoid straight, no cable bridge scaffolding used in the construction,not allowed t

29、o use electricity (fire) cutting, fix cable tray, cabletray is not allowed as a welding ground connection or cable tray cannotbe used for other processes10.65分/题完形填空 71分10% 20题3.55分/题句子翻译 35.5分 5% 5题7.1分/题总计 710分 100% 共92题样卷答题试题内容 答题卡 结构 时间Part 30WritingI minutes AnswerSheet 1 Part Reading Comprehen

30、sion(Skimming 15II and Scanning) minutes the oil level to the normal oil level. (2)for the secondary prevention of the leakage of cooling water pipefittings, valve parts before installation to check . 4.2 measures toeliminate quality defects of cables cable laying in front of the cableconstruction,

31、design, supervision and construction units to deliver thedesign, and drawing the third. Combined the engineering field to findfault, adding omitted items. Because the unit used computer DCS controland adds a great deal of control and signal cables. So you shouldcarefully review, checks for missing p

32、hysical cable, ready forconstruction and to verify cable length, specifications, familiar withthe cable channel and the device location and bracket cable bracket onthe section number. At the time of preparation of the inventory of cable,first of all, the professional carefully study electrical schem

33、atics, inaccordance with the principle of accounting the cable path cable volume,the number of cores used, total volume and design inventory check cableto cable with and without omission, laying of the cable in order toensure the process does not put a cable one cable. Finally, at the timeof invento

34、ry, prepared to take the same path the cables together.Inventory preparation is completed, later in each enclosure affixed onboth sides of each side of the cable you want to lay accurately verifycable lengths and set aside. Bridge should be combined, correctingerrors, avoid straight, no cable bridge

35、 scaffolding used in theconstruction, not allowed to use electricity (fire) cutting, fix cabletray, cable tray is not allowed as a welding ground connection or cabletray cannot be used for other processesPart 35Listening ComprehensionIII minutes Part Reading Comprehension(Reading 25 IV in Depth)minu

36、tes AnswerSheet 2 Part 15ClozeV minutes Part 5TranslationVI minutesthe oil level to the normal oil level. (2) for the secondaryprevention of the leakage of cooling water pipe fittings, valve partsbefore installation to check . 4.2 measures to eliminate qualitydefects of cables cable laying in front of the cable construction,design, supervision and construction units to deliver the design, anddrawing the third. Combined the engineering field to find fault, addingomitted items. Because the unit used comp

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论