



下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、职称英语考试综合A级补全短文专题训练职称英语考试综合A级补全短文专题训练Other peoples interruptions of your work are relatively insignificant compared with the countless times you interrupt yourself.以下是我为大家搜索整理的职称英语考试综合A级补全短文专题训练,希望能给大家带来帮助!更多精彩内容请及时关注我们应届毕业生考试网!The World.s Longest BridgeRumor has it that a legendary (传说的) six-headed
2、monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily._ (46) When completed in 2010,the worlds longest bridge will weigh nearly 300,000 tons-equivalent to the iceberg that sank the Titanic- and stretch 5 kilometers long. Thats nearly 50 percent longer than any
3、 other bridge ever built, says structural engineer Shane Rixon._ (47) Theyre suspension bridges, massive structures built to span vast water channels or gorges (峡谷). A suspension bridge needs just two towers to shoulder the structures mammoth ( 巨大的 )weight, thanks to hefty (高强度的.)supporting cables s
4、lung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54, 100-ton towers, which will support most of the bridge s load. The beefy (结实的 )cables of the bridge, each 1.2 meter in diameter, will hold up the longest and wide
5、st bridge deck ever built.When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. _ (48) Getting these cables up will be something. Its not just their length - totally 5.3 kilometers - but their weight. _ (49)After lowering verti
6、cal suspender cables from the main cables, builders will erect a 60 meter-wide 54,630-ton steel roadway, or deck-wide enough to accommodate 12 lanes of traffic.The decks weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank (拽) up against their firmly rooted anc
7、hors with a force of 139,000 tons-equivalent to the weight of about 100,000 cars. Those anchors are essential. _ (50)A. Some environmentalists are against the project on biological grounds.B. What do the worlds longest bridges have in common?C. If true, one day you might spy the beast while zipping
8、(呼啸而过) across the Messina Strait Bridge.D. Theyre what will keep the bridge from going anywhere.E. The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.F. They will tip up the scales at 166,500 tons-more than half the bridges total mass.试题答案及解析46.C。选项C中有一个关键词beast,与第一句中的monster相呼应。所以C是答案。47.B。第二段第二句的主语是they。由于表语是suspension bridges,they替代的一定是前面句子出现过的bridges。六个选项中,只有B含有bridges。填在第二段段首,意思连贯。48.E。空白处前面的句子中有the first job这几个词。有first,必有second/then。六个选项中,只有E含有the second job,所
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025至2030中国休闲旅游帐篷行业发展分析及前景趋势与投资报告
- 2025至2030中国以太网媒体转换器行业市场占有率及投资前景评估规划报告
- 高中生物选修易考知识点总结
- 2025至2030中国万圣节服饰行业市场深度研究及发展前景投资可行性分析报告
- 核心素养统编版六下第一单元语文园地课件
- 浙大环境工程学教案第10讲 第三章 污泥处理技术
- 2025至2030韩国胎牛血清行业产业运行态势及投资规划深度研究报告
- 浙大环境工程学教案第6讲 第三章 活性污泥法-1活性污泥法的基本原理
- 招聘课件开发工程师
- 香猪产业园项目环境影响评估报告
- 工业催化原理及应用
- 国开2023春《语言学概论》形考任务1-3+大作业参考答案
- 公安院校及专业招生政审表
- 青少年体能训练计划方案
- 2023年公需课 大数据概述及基本概念考题
- 广东深圳红岭中学物理自主招生试卷
- 世界卫生组织生存质量测定简表(WHOQOL-BREF)
- GB/T 28733-2012固体生物质燃料全水分测定方法
- GB/T 14294-1993组合式空调机组
- GB/T 13912-2002金属覆盖层钢铁制件热浸镀锌层技术要求及试验方法
- GB/T 11062-2014天然气发热量、密度、相对密度和沃泊指数的计算方法
评论
0/150
提交评论