




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Removing financing obstacles through project structuring Antonio VivesManager, a.i.Sustainable Development DepartmentInter-American Development BankAccess to Finance for Local GovernmentsIV World Water ForumMarch 17, 2006Outline of the presentationProject preparationProject structuringNEEDSPreparati
2、onStructuringFinancingProject finance cycleProject preparationOne of the major obstacles to water and sanitation finance is project preparationLow institutional capacityA local affair, sometimes removed from decision making centersDifficult political and economic conditionsScarcity of financial reso
3、urces: users, taxpayers, marketsProject preparation not given the key roleProject preparationDonors and multilaterals financial institutions must emphasize support for the early stage.We at the IDB hope to approve on Monday a Project Preparation Fund with grants for capacity building and project pre
4、parationDonors should consider “debt for water swaps” as part of their official assistance.Both would leverage other funds: “teach them how to fish instead of giving them fish”Project structuringFinancial structures adapted to local realitiesExploit all possibilities to maximize synergies between sc
5、arce resources: own labor, tariffs, donors, multilaterals, public and private resourcesAt one extreme, cooperatives, water microenterprises, municipal utilitiesIn the middle, management contracts, for operation, maintenance, collections, etc.At the other extreme, full-fledged concessionsProject stru
6、cturing: local conditionsWillingness to pay/local viewsTariff sustainabilitySite and locationInstitutional capacityFiscal spaceLegal frameworkPolitical riskMacroeconomic conditionsLocal conditionsWater financing modelSesin FT3.40, Domingo 19 marzo, 11:00 am Diezmo 4In summaryProject preparation and structuring may not be a source of funds, but can help bring funds and enhance the long term sustainability of water projectsAll actors, all sources, all structures must be exploredRemoving financing obstacles through project structuring Antonio VivesManager, a.i.Sustainable Development Depa
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 37228-2025安全与韧性应急管理突发事件管理指南
- 等差数列说课课件
- 2025年防组织粘连用壳聚糖凝胶项目合作计划书
- 出借农村房子协议书范本
- 拆迁重建合同协议书范本
- 塔吊安全协议书范本
- 合作框架居间协议书范本
- 简易退货协议书范本
- 2025年饲用精细化工合成添加剂项目发展计划
- 2025年负极材料项目发展计划
- 夏季电气安全培训课件
- 《胸部外伤的诊治》课件
- 卫生院乡村医保培训课件
- 智能家居产业调研报告
- 课题3 物质组成的表示(第1课时)九年级化学上册教学设计(人教版2024)
- 非法入侵应急预案
- 工业自动化设备调试流程
- 车辆救援服务方案
- DBJ15-22-2021-T 锤击式预应力混凝土管桩工程技术规程(广东省)
- 《跨境电子商务基础》课件-项目一 跨境电子商务认知一二三
- 园林工程技术专业建设规划
评论
0/150
提交评论