电缆线路施工检验完整_第1页
电缆线路施工检验完整_第2页
电缆线路施工检验完整_第3页
电缆线路施工检验完整_第4页
电缆线路施工检验完整_第5页
已阅读5页,还剩46页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、工序Process检验项目Checkitems性质Property质量标准Qualitystandard检验方法和器具Inspectionmethodandinstrument电缆管制作Cablepipefabrication外观检查appearanceinspection金属管metalpipe内表面Innersurface光滑,无毛刺smooth,noburrs观察检查visualcheck外表面Outsidesurface无穿孔、裂缝、显著的凹凸/、平及锈蚀nohole,crack,obviousunevennessorrust塑料管plasticpipe敷设温度layingtemper

2、ature按设计规定asperthedesignstipulation按图纸检查并检查出厂合格证checkasperthedrawingandcheckthefactorycertificate管材强度pipestrength切断口(管口)nozzle光滑smooth观察检查visualcheck弯曲部分bendingsection无裂缝及显著的凹瘪nocrackorobviousconcavity每根电缆管的弯头数No.ofeachpipebendingelbows一般弯头commonelboww3个notmorethan3观察检查visualcheck直角弯头rightangleelbow

3、w2个notmorethan2弯曲半径bendingradius主要primary与所穿电缆弯曲半径匹配suitableforthecablebendingradius用样板检查checkwiththesample电缆管弯扁度cablepipebendingflatnessdegree不大于1/10电缆管外径notbiggerthan1/10ofthecablepipeOD用尺检查checkwiththetape电缆管检查Cablepipeinspection电缆管内径IDofthecablepipe按设计规定,且不小于1.5倍电缆外径asperdesignstipulation,andnot

4、lessthan1.5timesofthecableoutsidediameter用尺检查checkwiththetape管内畅通检查non-obstructioncheck主要primary光滑,无积水,杂物smooth,noseeperorsundries用0.85倍管内径拉线球检查checkwiththebracingwireball(0.85timespipeinsidediameter)敷管Pipelaying路彳mmethod按设计规定asperdesignstipulation对照图纸检查checkcomparingwiththedrawings明敷exposedlaying单管

5、敷设singlepipelaying竖直horizontalandvertical观察检查visualcheck排管敷设pipebundlelaying管口高度nozzleelevation致identical观察检查visualcheck弯曲弧度bendingradianmeasure观察检查visualcheck引至设备的管口位置leadtothenozzleoftheequipment便于电缆与设备连接,并不妨碍设备拆装和进出convenienttoconnectthecableandthedevice,notobstructtheequipmentdismountingandpassi

6、ng观察检查visualcheck与热力管道,热力设备之间的净距thenetdistancebetweenpipeandtheheatingpipe,heatingequipment平行敷设parallellaying主要primary1m,/、宜敷设于热力管道上部1m,notgoodtolayabovethethermalpipes用尺检查checkwiththetape交叉敷设crosslaying0.5m与保温层之间净距thenetdistancebetweenthepipeandthethermalinsulator平行敷设parallellaying主要primary0.5m交叉敷设

7、crosslaying0.2m直埋burydirectly直埋管距地面深度(混凝土内除外)thedepthbelowtheground(exceptconcrete)700mm用尺检查checkwiththetape伸出建筑物散水坡的长度250mmthelengthbeyondthebuildingbulkwaterslop伸出道路路基长度lengthbeyondtheroadbed2m伸出地面的排管外观检查appearancecheckofthepipebundlebeyondtheground排列整齐,高度一致arrangeingoodorderandatthesamelevel观察检查v

8、isualcheck引入建筑物和建筑物内的埋置深度(混凝土内除外)theembeddeddepthinsidethebuildingandthedepthinsidethebuilding(excepttheconcrete)300mm-500mm用尺检查checkwiththetape电缆管道与其他管道、道路、建筑物之间平行和交叉时的净距theparallelandacrossnetdistancebetweenthecabletrenchandothertrenches,roadsandbuildings主要primary按GB501681992表5.4.3规定AsperGB5016819

9、92S电缆管连接CablePipeconnection金属管metalpipe套管连接bushingpipeconnection套管长度bushingpipelength1.5D-3D电缆管外径1.5D-3DcablepipeOD用尺检查checkwiththetape外观检查appearancecheck焊接牢固Weldedfirmly观察检查和用镀锌铁丝绑棉纱通入管内检查visualcheckandcheckthroughinsertingthecottonyarntiedgalvanizedironwire丝扣连接管端套丝长度mmpipeendmantlefiberlength1/2管接

10、头长度1/2pipejointlength用尺检查checkwiththetape外观检查appearancecheck连接牢固,密封良好Connectedfirmly,goodseal观察检查visualcheck防腐漆检查anti-corrosivepaintcheck涂刷均匀,漆层完好Busheduniformlyandgoodpaintlayer硬质塑料管套接casingconnection套管两侧封焊牢固,密封良好theweldingatboth观察检查visualcheckhardplasticpipeendsisfirm,sealedwell插接insertconnection插

11、接囿用胶合剂粘和牢固,密封良好theinsertsurfaceisgluedfirmlybytheagglutinantandsealedwell.插入深度insertdepth1.1D-1.8D电缆管内径1.1D-1.8Dcablepipeinsidediameter用尺检查checkwiththetape硬质塑料管补偿装置安装hardplasticpipecompensationdeviceinstallation按GB50168-1990规定AsperGB50168-1990stipulation对照图纸或规范检查checkcomparingwiththedrawingandspecif

12、ication金属软管固定与连接fastenandconnectionofthemetalsoftpipe主要primary牢固、紧固firmandtight用手扳动检查pullingcheckwithhand其他Others镀锌管galvanizedpipe镀锌层完整thegalvanizedlayeriscomplete.观察检查visualcheck电缆管接地cablepipeground主要primary牢固,导通良好firm,goodconduction扳动并导通检查Pullandconductioncheck电缆支架(桥架)制作及安装Cableframe(cabletray)fab

13、ricationanderection工序Process检验项目Checkitems性质Property质量标准Qualitystandard检验方法及器具Inspectionmethodandinstrument电缆架配制Cableframefabrication型钢检查Sectionsteelcheck外观检查Appearancecheck无显著扭曲,切口无卷边、毛刺Noobviouscontortion,no观察检查visualcheck规格Specification按设计规定Asperdesignstipulation对照图纸检查checkcomparingwiththedrawing

14、电缆架Cableframe电缆支架层间允许最小距离Thepermittedsmallestdistancebetweenthecableframelayers按GB50168-1992中表4.0.2规定AsperGB50168-1992:CHART4.0.2stipulation用尺检查Checkwiththetape焊接welding主要Primary牢固firm观察检查visualcheck电缆托架配制cabletrayfabrication按设计规定asperdesignstipulation对照图纸检查asperdrawingtocheck镀锌层galvanizedlayer完好per

15、fect观察检查visualcheck预埋件embeddedmembersarrange按设计规定asperthedesignstipulation对照图纸检查asperthedrawingtocheck固定强度fastenstrength主要Primary牢固firm用手扳动检查checkbypullingwithhands电缆支吊架安装Cablebranchhangingframeerection及同品巨arrangementandspacing主要Primary按设计规定asperdesignstipulation对照图纸检查asperdrawingtocheck最上(下)层横撑至沟顶或

16、楼板距离Thedistancebetweenthetop(bottom)braceandthetrenchtoporthefloorslab按GB50168-1992中表4.0.3规定asperGB50168-1992:chart4.0.3stipulation对照规范检查asperspecificationtocheck水平布置电缆架高低误差thedeviationoftheparallelarrangementofthecableframe5mm用拉线和尺检查checkwiththebracingwire垂直布直电缆架左右误差leftand用铅坠和尺检查rightdeviationsoft

17、heverticalarrangementofcableframecheckwiththeplummet在有坡度的电缆沟内或建筑物上电缆架布道arrangethecableframeinthecabletrenchwithslopeoronthebuilding与电缆沟或建筑物向坡度布置arrangeatthesameslopedegreeofthecabletrenchorbuilding观察检查visualcheck电缆架固定fastenthecableframe主要Primary牢固firm扳动检查checkbypulling电缆托架安装cabletrayinstallation按设计规

18、定asperdesignstipulation对照图纸检查asperdrawingtocheck组装后的钢结构竖井检查checkthesteelstructureverticalshaftafterassembling垂苴误差(m)mverticaldeviation(mm)0.2%竖井高度工0.2%shaftheight用尺检查Checkwithtape支架横撑水平误差(mm)leveldeviationofthesupporthorizontalbrace(mm)0.2%竖井高度工0.2%shaftheight用尺检查Checkwithtape对角线误差mmDiagonallinedevi

19、ation(mm)1m,/、宜敷设于热力管道上部1m,notappropriatetolaycableabovethermaltubes用尺检查Checkwithtape交叉敷设Crosslaying0.5m与保温层之间净距thenetdistancebetweencableandheatpreservationlayer平行敷设parallellaying主要Primary0.5m交叉敷设Crosslaying0.2m电缆排列Cablearrange外观检查appearancecheck排列整齐,弯致,少交叉tidy,thesamebendingdegree,lesscrossing观察检查

20、Visualcheck交流单芯电缆排列方式ACsinglecorecablearrangemode按设计规定Asperdesign电缆标志牌Cablesignboard装设位置Location电缆终端、电缆中间接头处cableends,intermediaryjointofcable按GB50168-1992中,5.1.19条要求A标志Sign主要Primary按GB50168-1992规定asperstipulationinGB50168-1992对照电缆敷设清册检查checkaspercablelayinglist固定fasten挂装牢罪mountfirmandreliably用手扳动检查

21、Checkthroughpulling规格specification-Midentical观察检查visualcheck电缆固定Cablefasten电缆支持点间距离thedistancebetweenthecablesupportpoints按GB50168-1992规定asperGB50168-1992用尺检查Checkwithtape水平敷设Parallellaying电缆首末端及转弯处、接头两端bothendsandturningofthecable,bothendsofthejoint观察检查Visualcheck超过45倾斜敷设slopelayingofmorethan45主要Pr

22、imary电缆每个支持点eachsupportpointofthecable夹具型式clampmodel按设计规定asperdesign对照图纸检查checkasperdrawing交流单芯电缆固定夹具fastenclampoftheACsinglecorecable夹具无铁件构成的闭合磁路noironformedclosed观察检查visualcheckmagneticcircuitfortheclamp裸铅(铝)套电缆固定处保护protectionatthebarelead(aluminum)软衬垫齐全、可靠Softcushionsarecompleteandreliable电缆固定强度c

23、ablefastenstrength牛罪reliable用手扳动检查checkthroughpulling敷设后检查电缆外观检查appearancecheck主要Primary无机械损伤和渗油nomechanicaldamageoroilinfiltrate观察检查visualcheck电缆孔洞处理treatmentofthecablehole电缆沟、隧道、竖井、建筑物及盘(柜)电缆出入口封闭良好thecableinletandoutletinthecabletrench,channel,shaft,buildingandpanel(cabinet)aresealedwell.管道内电缆敷设C

24、ablelayinginthepipe工序检验项目性质质量标准检验方法及器具Process敷设前检查Checkbeforelaying电缆CableInspectionitems型号、电压、规格及长度Model,voltage,specificationandlengthPropertyQualitystandard按设计规定Asperdesigninspectionmethodandinstrument对照图纸检查Checkasperdrawing夕卜观检查appearancecheck无机械损伤和渗油Nomechanicaldamageoroilinfiltrate观察检查visualch

25、eck检查insulationcheck主要primary良好Fine用兆欧表检查Checkwithmegger电缆管Cablepipe畅通检查non-obstructioncheck内部无积水、杂物Nowater,sundries疏通检查checkthroughdredge内径insidediameter按设计规定Asperdesign用尺检查Checkwithtape电缆敷设Cablelaying敷设路径Layingroute按设计规定Asperdesign对照图纸检查Asperdrawingtocheck端头密封End油纸绝缘电力电缆oilpaperinsulationpowercabl

26、e铅封密实,无渗油leadsealingtightly,nooilinfiltrate观察检查visualcheck交联聚乙烯电缆XLPEcable防潮封端可靠,严密reliableanti-humidity,tight充油电缆Oil-filledcable按GB50168-1992规定asperGB50168-1992电缆弯曲半径Cablebendingradius主要Primary按GB50168-1992规定asperGB50168-1992用样板检查Checkwiththesample交流单芯电力电缆ACsinglecorepowercable在支架上敷设layingonthesupp

27、ortstructure布置在向侧支架上Arrangeonthesamesidesupportstructure观察检查visualcheck在钢管内敷设Layinginsidethesteelpipe主要primary三相电缆共穿TTThreephasecablegoingthroughonepipe电缆标志牌cablesignboard装设位置Installationlocation电缆终端两端及接头处bothendsandjointsofthecable观察检查visualcheck标志sign主要primary电缆线路设计编号、型号、规格及起讫地点;字迹清晰,不易对照电缆敷设清册检查C

28、heckasperthe脱落cablecircuitdesignNo.,model,specificationandbeginningandendlocations;clearwords,andthewordsarenoteasytofalloff.cablelayinglist固定fasten牛罪reliable扳动检查checkbypulling规格specification统一unified观察检查visualcheck电缆固定Cablefasten固定fasten牢固fasten观察检查visualcheck夹具clamps型式model按设计规定asperdesign对照图纸检查as

29、perdrawing交流单芯电缆固定fastenedbyACsinglecorecable夹具无铁件构成的闭合磁路non-ironclampsformedclosedmagneticcircuit观察检查visualcheck固定强度fasteningstrength牢靠Firmandreliable用手扳动检查Checkthroughpulling紧固件表面处理Surfacetreatmentofthefastener镀专ggalvanized观察检查visualcheck敷设后检查checkafterlaying电缆管口封闭Sealingofthecablepipeorifice按GB50

30、168-1992规士7EAsperGB50168-1992直埋电缆敷设Directlyburiedcablelaying工序检验项目性质质量标准检验方法及器具ProcessInspectionitemsPropertyQualitystandardInspectionmethodandinstrument敷设前检查Checkbeforelaying电缆Cable型号、电压及规格Model,voltageandspecification符合设计Conformtothedesign对照图纸检查Checkasperthedrawing长度Length按设计,并联运行的电力电缆长度应致asperdes

31、ign,thelengthoftheparalleloperationpowercableshouldbethesame.检查电缆敷设记录Checkthecablelayingrecord外观检查Appearancecheck无机械损伤和渗油Nomechanicaldamageandoilinfiltrate观察检查visualcheck绝缘检查Insulationcheck重要primary良好Fine用10kv兆欧表检查Checkwiththe10kvmegger敷设地点检查Layinglocationcheck无积水,沉陷,在可能使电缆受到机械损伤,化学作用,地下电流、振动、热影响,腐植

32、物质、虫鼠等危害的地段应有保护措施nowater,concave;takeprotectionmeasuresatthelocationswherethemechanicaldamage,chemicaleffect,undergroundcurrent,vibration,thermaleffect,humicsubstancemayexist.观察检查visualcheck电缆沟深度depthofthecabletrench0.7m用尺检查checkwithtape电缆敷设Cablelaying敷设路径layingroute按设计规定Asperdesign对照图纸检查checkasperd

33、rawing端头密封endsealing油纸绝缘电力电缆Oilpaperinsulationpowercable铅封密实,无渗油Leadsealing,nooilinfiltrate观察检查Visualcheck交联聚乙烯电缆XLPEcable防潮端可靠,严密Theanti-humidityendisreliableandtight.充油电缆Oilfilledcable按GB50168-1992规定AsperGB50168-1992电缆弯曲半径主要按GB50168-1992规定用尺检查CablebendingradiusPrimaryAsperGB50168-1992Checkwithtape

34、电缆与铁路、公路、城市道路、厂区道路交叉敷设cablegoacrosstherailway,road,cityroad,plantroad.电缆之间,电缆与管道、道路、建筑物之间平行和交叉的距离Theparallelandcrossingdistancesbetweenthecableadcable,cableandpipes,cableandroad,cableandbuilding主要primary交流单芯电缆排列方式ACsinglecorecablearrangeway按设计规定Asperdesign观察检查visiblecheck电缆回填Cablebackfill电缆外观检查Appea

35、rancecheck无机械损伤和渗油Nomechanicaldamageandoilinfiltrate观察检查visiblecheck电缆上下保护层(软土或沙层)检查thetopandbottomprotectionlayers(softsoilorsandlayer)check按GB50168-1992规定AsperGB50168-1992对照规范检查Checkasperspecification方位标志(桩)检查Coordinationsign(pile)check装设位置Installationlocation主要Primary电缆两端、电缆直线段50m-100m处、电缆接头及电缆改变

36、方向的弯角处Bothendsofcable,50m-100mstraightsectionofthecable,cablejointandbendingofdirectionchangingpoint观察检查Visualcheck标志sign字迹清晰,不易脱落clearwriting,noteasytofalloff标桩规格防腐,anti-corrosion,标桩固定牢固Fasten用手扳动检查Checkthroughpulling电缆终端制作安装Cableterminalfabricationandinstallation工序检验项目性质质量标准检验方法及器具ProcessInspectio

37、nitemsPropertyQualitystandardInspectionmethodandinstrument制作前检查checkbeforefabrication电缆Cable位直location按设计规定Asperdesign对照图纸检查Checkasperdrawing型号、电压及规格Model,voltageandspecification检查insulationcheck主要Primary良好Fine检查试验记录Checkthetestrecord电缆终端盒及配件cableterminalboxandfittings齐全,无损伤Complete,nodamage对照技术文件检查

38、Aspertechnicaldocuments制作工艺fabricationprocess按工艺规程规定Asperprocessspecification接地线Groundingwire接地线规格groundingwirespecification按GB50168-1992规定AsperGB50168-1992对照规范检查Asperspecification电缆穿过零序电流互感器接地线cablegoingthroughzerosequenceCTgroundingwire接地线焊接groundingwirewelding牢固,可靠Fasten,reliable单芯电缆金属层接地Singleco

39、recablemetallayergrounding一端接地oneendgrounding观察检查Visualcheck电缆芯线外观检查cablecorewireappearancecheck无损伤nodamage芯线绝缘包扎长度Corewireinsulationwrappinglength按工艺规程规定Asperprocessspecification用尺检查Checkwithtape油纸电缆铅封Leadsealingoftheoilpapercable位直location电缆终端盒金属外壳与该处的电缆金属护套cableterminalboxmetalshellandcablemetalc

40、asing观察检查Visualcheck外观检查appearancecheck主要Primary粘附密实,牢固,厚薄均匀,表面光滑,无夹渣,砂眼,缝隙affixtightly,fasten,equivalentthickness,smoothsurface,noslag,crack环氧复合物配置和浇注Epoxycompoundconfigurationandpouring主要primary按制造厂或工艺规程规定,搅拌均匀,无气泡aspermanufactureorprocess对照技术资料检查Aspertechnicaldocumentsspecification,stirequivalent

41、ly,nobubble.聚乙烯电缆芯线外观检查Appearancecheckofpolythenecablecorewire无碳痕,划痕Nocarbonscar,noscratch观察检查Visualcheck预制电缆终端制作Prefabricationcableterminalbox按制造厂规定Aspermanufacturespecification对照厂家资料检查Inspectwithmanufacturedocuments热缩电缆终端制作Heatshrinkablecableterminalfabrication冷缩电缆终端制作Coldshrinkablecableterminalfa

42、brication线鼻子Wireterminal线鼻子规格wireterminalspecification与芯线相符conformtothecore观察检查visualcheck铜鼻子镀锡Copperterminaltincoating表向光滑,干净smoothsurfaceandclean芯线连接Corewireconnection压模规格Compressionspecification与导线规格相符conformtotheconductorspecification观察检查Visualcheck压入深度Compressiondepth按工2规程规定asperprocessspecific

43、ation油纸电缆终端密封检查Sealingcheckofoilpapercableterminal主要Primary无渗油nooilinfiltrate相色标志colorsignsymbol正确correct固定强度Fastenstrength牢固fasten用手扳动检查inspectthroughpullingbyhand线鼻子与电气装置连接Connectthewireterminalwiththeelectricdevice按GB50168-1992规定AsperGB50168-1992观察检查Visualcheck控制电缆终端制作安装Fabricationandinstallation

44、ofcontrolcableterminal工序Process检验项目Inspectionitems性质Property质量标准Qualitystandard检验方法及器具Inspectionmethodandinstrument电缆排列Cablearrangement盘下入口处电缆排列Cablearrangementatinletunderpanel(cabinet)整齐,少交叉neat,almostnocrossing观察检查Visualinspection电缆上盘时弯度CablebendingdegreeTIdentical铠装剥切位置Armorcablestrippinglocatio

45、n在盘下侧,一致一般要求Generalrequirement芯线绝缘层外观检查Corewireinsulationlayerappearancecheck主要Primary完好,无损伤Perfect,nodamage观察检查Visualinspection屏敝电缆的屏敝接地shieldgroundingofshieldedcable接地方式按设计规定Asperthedesigntocarryonthegroundingstyle对照图纸检查Asperdrawing钢凯接地Armoredcable电力电缆中间接头制作安装Powercableintermediatejointfabrication

46、andinstallation工序检验项目性质质量标准检验方法及器具ProcessInspectionitemsPropertyQualitystandardInspectionmethodandinstrument制作前检查Checkbeforefabrication电缆Cable型号、电压及规格model,voltageandspecification按设计规定asperdesign对照图纸检查夕卜观检查appearancecheck无机械损伤和渗油Nomechanicaldamageandnooilinfiltrate观察检查Visualcheck检查insulationcheck主要p

47、rimary良好Fine检查试验记录Checktestrecord电缆中间接头盒及其配件cableintermediatejunctionboxandfittings齐全、无损伤Complete,nodamage对照技术文件检查Aspertechnicaldocument电力电缆中间接头Powercableintermediatejoint制作工艺fabricationprocess按工2规程规定asperprocessspecification电缆中间接头、接头盒规格cableintermediatejoint,junctionboxspecification按设计图纸Asperdesign

48、电缆芯线外观检查cablecoreappearancecheck无损伤nodamage观察检查appearancecheck连接管与芯线连接connectthecorewirewiththeconnectionpipe连接管规格connectionpipespecification与芯线相符conformwiththecorewire观察检查Visualcheck铜连接管镀锡tincoatingofthecopperconnectionpipe表向光滑,干净Smoothsurface,clean压接Pressurewelding压模尺寸compressionmoldingdimension与导

49、线规格相符conformtotheconductorspecification外观检查appearancecheck主要Primary完好Fine绝缘纸(带)包扎外观检查Appearancecheckofinsulationpaper(belt)wrapping主要Primary搭盖均匀,层间无空隙褶皱covereduniformly,nogaporcreasebetweenthelayers观察检查Visualcheck油纸电缆铅封OilpapercableleadsealingaLocation电缆接头盒金属外壳与电缆金属护套处cablejunctionboxmetalshellandca

50、blemetalshield观察检查Visualcheck外观检查Appearancecheck主要Primary粘附密实、牢固、厚薄均匀,表面光滑,无夹渣,砂眼,缝隙affixtightly,fasten,equivalentthickness,smoothsurface,noslag,crack配制和浇注环氧复合物produceandpourepoxycompound主要Primary按制造厂或工艺规程规定Asperfactoryorprocessspecification观察检查Visualcheck接地线Groundingwire接地连接线规格Groundingwirespecific

51、ation按GB50168-1992规定AsperGB50168-1992观察检查Visualcheck锡焊外观检查Tinweldingappearancecheck焊接平整,无毛刺Weldingneatly,noburrs接头处屏蔽层、铠装层连接Theconnectionoftheshieldlayerandarmoredlayeratthejoint按GB50168-1992规定AsperGB50168-1992外观检查Appearancecheck完好Fine油纸中间接头密封检查Oilpaperintermediatejointsealingcheck主要Primary无渗油Nooilp

52、enetration观察检查Visualcheck热缩中间接头制作Heatshrinkableintermediatejointfabrication按制造厂规定Aspermanufacturespecification对照技术资料检查Aspertechnicaldocuments冷缩中间接头制作Coldshrinkableintermediatejointfabrication35KV及以上电缆线路35kvcablecircuitandthecablecircuitabove35KV工序Process检验项目Inspectionitems性质Property质里标准Qualitystanda

53、rd检验方法及器具Inspectionmethodandinstrument敷设前检查Checkbeforelaying电缆Cable电缆及附件技术文件Cableandannextechnicaldocuments齐全Complete型号、规格及数量Model,specificationandquantity按设计规定Asperdesign对照图纸检查Checkasperdrawing外观检查Appearancecheck无机械损伤,油压正常,密封良好Nomechanicaldamage,normaloilpressure,goodsealing观察检查Visualcheck电缆油样试验Cab

54、leoilsampletest合格Qualified对照技术资料检查Checkaspertechnicaldocument绝缘检查Insulationcheck主要Primary良好Good检查试验记录Checktestrecord敷设道路Roadlaying畅通,无积水和杂物Unobstructed,nowaterdepositorsundries观察检查Visualinspection电缆敷设Cablelaying敷设路径layingroute按设计标准asperdesignstandard对照图纸检查Asperdrawingtocheck敷设温度layingtemperature按GB5

55、0168-1992规士7EAsperGB50168-1992对照技术资料检查Checkaspertechnicaldocuments110kv以上电缆敷设侧压力theby-passpressureoflayingofthecableabove110kvw3kNm用张力计检查Checkwithtensiometer敷设速度layingspeed按GB50168-1992规士7E观察检查visualcheck机械敷设牵引强度drawingstrengthofmechanicallayingAsperGB50168-1992用张力计检查Checkwithtensiometer端头密封Terminal

56、sealing充油电力电缆oilfilledpowercable铅封严密,可靠Leadsealingwell,reliable观察检查Visualcheck交联聚乙烯电缆XLPEcable防潮封端严密,可靠Anti-humilitytightly,reliable充油电缆敷设位差positiondifferenceoftheoilfilledcablelaying主要Primary按GB50168-1992规士7EAsperGB50168-1992用尺检查Checkwithtape电缆弯曲半径Cablebendingradius主要Primary用样板检查Checkwithsample电缆与热

57、力管道及设备净距Thenetdistancebetweencableandheatpipe,equipment按GB50168-1992规士7EAsperGB50168-1992用尺检查Checkwithtape电缆Cable直埋电缆Directlayingcable电缆覆盖软土softsoilofthecablecovering150mm-200mm用尺检查Checkwithtape直埋电缆标志Directlylaidcablesymbol齐全Complete电缆并列敷设的净距thenetdistanceofthecablelaidsidebyside按设计规定Asperdesign用尺检查

58、Checkwithtape电缆排列Cablearrangement断囿布置cross-sectionarrangement按GB50168-1992规士7EAsperGB50168-1992观察检查Visualcheck外观检查Appearancecheck排列整齐,弯腰一致,少交叉arrangedneatly,thesamebendingdegree,lesscrossing交流单芯电缆排列方式ACsinglecorecablearrangementstyle按设计规定Asperdesign电力电缆接头盒并列敷设布置Layingsidebysidearrangement按GB50168-19

59、92规定Asper观察检查VisualcheckofpowercablejunctionboxGB50168-1992充油电缆截断Cross-sectionofoilfilledcable按GB50168-1992规定AsperGB50168-1992对照规范检查Checkasperspecification电缆标志牌Cablesignboard装设位置Location电缆终端、电缆接头处标志Sign主要Primary电缆线路编号,型号,规格及起讫点;字迹清晰,不易脱落cablecircuitnumber,model,specificationandbothends;clearwritingw

60、hichisnoteasytofalloff对照电缆清册检查Checkaspercablelist固定fasten挂装牛罪hangtightly用手触摸touch规格specification防腐,统一anti-corrosion,uniform观察检查visualcheck电缆固定cablefasten电缆支持点间距离thedistancebetweenthecablesupportingpoints按GB50168-1992规定AsperGB50168-1992对照规范检查checkasperspecification水平敷设Parallellaying主要Primary电缆首末两端及转弯

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论