




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、易考雅思小作文流程图/解释阐明性图(1)(2) You should spend about 20 minutes on this task.The diagram below shows the method of obtaining water outdoors.You should write at least 150 words.(3)You should spend about 20 minutes on this task.The flow chart is about the National Yellow Stone Park in use after the fire dis
2、aster.You should write at least 150 words.(4)You should spend about 20 minutes on this task.The diagrams below show some principles of house design for cool and for warm climates.You should write at least 150 words.(5)You should spend about 20 minutes on this task.The government planned to build a s
3、upermarket in G Town. In the following map there are two alternative places for you to choose: place S1 and place S2. According to the information shown in the diagram, describe the benefits and drawbacks of the two locations.You should write at least 150 words.(6)You should spend about 20 minutes o
4、n this task.The diagram below shows the process of glass recycling.You should write at least 150 words.(7)You should spend about 20 minutes on this task.The diagram shows how organic waste is recycled to produce garden fertilizer.You should write at least 150 words.(8)You should spend about 20 minut
5、es on this task. The diagram below shows the process by which bricks are manufactured for the building industry. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. You should write at least 150 words.Brick manufacturing
6、0;* Clay: type of sticky earth that is used for making bricks, pots, etc. (9)You should spend about 20 minutes on this task. The illustrations below show how chocolate is produced. Write at least 150 words. (10)雅思流程图最全范文 1.蚕丝制作Sample:As is displayed in the first diagram, the life cycle
7、of the silkworm can be categorized into 4 main stages. First, the life of the silkworm starts from eggs propagated by the moth, and it takes 10 days for each egg to become a silkworm larva that feeds on mulberry leaves. Silkworm larva continues to grow in 4 to 6 weeks, then wrapping itself with silk
8、 thread to construct a cocoon in the next 3 to 8 weeks. A moth can be produced from the cocoon in 16 days. The life cycle begins again from then on.Focusing on the second diagram, it illustrates the 5 main steps of the procedure of producing silk cloth. Well generated cocoons will be selected firstl
9、y. Before the silk thread can be unwound, cocoons have to be boiled in hot water. One cocoon can produce approximately 300 to 900 metres of silk thread. The unwound thread will be dyed afterwards to be weaved into silk cloth. Overall, the two diagrams reveal the stage of producing cocoons in the lif
10、e cycle of the silkworm can be used to make silk cloth through 5 simple steps.Cambridge IELTS 6 Version:The first diagram shows that there are four main stages in the life of the silk worm.First of all, eggs are produced by the moth and it takes ten days for each egg to become a silkworm larva that
11、feeds on mulberry leaves. This stage lasts for up to six weeks until the larva produces a cocoon of silk thread around itself. After a period of about three weeks, the adult moths eventually emerge from these cocoons and the life cycle begins again.The cocoons are the raw material used for the produ
12、ction of silk cloth. Once selected, they are boiled in water and the threads can be separated in the unwinding stage. Each thread is between 300 and 900 metres long, which means they can be twisted together, dyed and then used to produce cloth in the weaving stage. Overall, the diagrams show that th
13、e cocoon stage of the silkworm can be used to produce silk cloth through a very simple process. 2. 户外取水The chart describes how water is obtained outdoors.According to the figure, the first step of obtaining water outdoors is to find a hole with green plants on its bottom. Next, remove the gree
14、n plants in the middle and put a container there. Then, cover the hole with a plastic sheet and place two stones on both ends of it to secure its position. A third stone is laid on the middle of the plastic sheet so that the middle part is also the lowest part. When the sun shines on the green plant
15、s in the hole, water evaporates from these plants. The vapor rises up and then cools down to form water drops on the plastic sheet. When there is more and more water, it flows along the sheet to accumulate on the lowest part. Finally, water falls down into the container directly under the middle sto
16、ne.Thus, water is collected successfully through evaporation from green plants.3.房屋不同季节旳构造As is displayed in the flow chart, the principles of insulation in cool and warm climate respectively differ to a large extent.As to the situation of cool climate, we adopt the high-angled roof in order to be n
17、early parallel with the direction of the sun so that the direct exposition to the heat of sun is lessened as much as we can. By this, the temperature of the material wont fluctuate within a large range. Meanwhile, thermal building material could enhance the heat storage insulation, preventing outflo
18、w, thus reduction of heat. Adversely, in warm climate, reflective building material is indispensable with overhands for shade. The direction of the roof is almost vertical to the direction of the sun to lead to external insulation reflection. By this, ventilation would result in the removal of heat
19、storage rather than reduction.Through the different working principles of ventilation, we are fascinated by the masterpieces of modern science and technology.4超市建造地点选择As is unfolded in the map, Place M and N have their unique pros and cons as to the place for building the supermarket. First of all,
20、Place N is located in the urban area of the G town, which may have more population and business. This advantage is incomparable with Place M. Whats more, Main road runs across the center area with convenience in traffic and logistics for the market afterwards. However, the place is equally far away
21、from the neighborhood and the suburb area and cannot attract the residents in the outskirts.As a double-edged sword, Place M is more specifically customer-oriented. In spite of its comparably remote location with Place N, it would attract more customers in the outskirts, for they are reluctant to ma
22、ke a long trip for shopping. On the other hand, the train line nearby will also bring convenience in traffic to the urban-dwellers. Situated to the north-west of Place N, Place M is near the A and B Town with total population of 23 million, far outnumbering the overall population of D and E town, wi
23、th 12 million. Whats worthy of being mentioned is that fierce competition in Place N and probable monopoly in Place M should also be taken into account when building the supermarket.5.玻璃旳再生As is displayed in the flow chart, the recycling process of glass is really a complex one.The overall process c
24、an be categorized into 3 stages. First, glass products in various forms are gathered in the Collection point, so that they are easily transported by special trucks or vans to the Cleaning plant, where they get sterilization by high-pressured water. There are three different channels in the Recycling
25、 plant, namely Brown, Green and Clear, which represent the colors of glass. After recycled in the furnace, glass products are melted into recycled liquid glass. Mixed with new liquid glass, the compound is finally moulded into solid glass, which, afterwards, will be sent to various customer supermar
26、kets for selling. Thus, the glass will go to the customers for different purposes. Through a brief introduction of the circle of glass recycling, we come to realize that recycling plays a vital role in environmental protection and ecological preservation. 6化肥旳制作As is shown in the flow chart, the pro
27、cess of recycling organic waste to produce compost is really a complex one. The whole process can be categorized into five stages. First of all, prepare a plastic container which has four holes for ventilating the air. There is a rule when putting waste into the container, food at the bottom within
28、15 centimeters high, grass at the middle and newspaper at the top within 15 centimeters high altogether, in order to make a optimum environment for different bacteria reproducing. In the following stage, we can witness nitrogen and water being put into the container. What's worth mentioning is t
29、hat water is only added in a hot weather. Next, heat the waste and let the bacteria reproduce fastly, with which the organic waste can be decomposed and became garden fertiliser after 6 months. Subsequently, we can carry the compost out and move it to the garden, thus a new recycling can begin. In c
30、onclusion, using this way to turn the organic waste into garden fertiliser is environmentally friendly. By enlarging the number or volume of the container, we can dispose more waste at the same time.7美国黄石公园植被恢复(暂无范文)8巧克力旳制作The diagram shows the stages in the process of making chocolate. Chocolate co
31、mes from the cacao tree, which is grown in parts of South America, Africa and Indonesia. The tree produces large red pods which contain white cocoa beans. Firstly, when the pods are ripe, they are harvested, the beans are removed and they are fermented for several days in large wooden boxes. Du
32、ring the fermenting process, the beans turn brown. Next, the brown beans are spread in the sun to dry. They are then put in large sacks and transported by train or lorry. After this, the beans are taken to a chocolate factory where they are roasted in an oven at temperatures of between 250 and 350 d
33、egree Celsius.After being roasted, the beans are crushed and the outer shell is removed. This part is not needed for making chocolate. Finally, the inner part of the bean is pressed and liquid chocolate is produced. 9. 砖块旳制作The process by which bricks are manufactured for the building ind
34、ustry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger. Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 生物制造行业发展趋势与市场机会分析
- 清香型白酒市场趋势与前景展望分析
- 2025至2030年中国翻柱式磁浮子液位计行业投资前景及策略咨询报告
- 2025至2030年中国绢纺衬衫行业投资前景及策略咨询报告
- 基于PVA-MoS2复合薄膜的忆阻特性研究
- 《水之约》(节选)翻译实践报告
- 基于BIB-LCJ与SD法的荆州城市综合公园植物景观评价
- 2025至2030年中国紫砂岩板市场现状分析及前景预测报告
- 2025至2030年中国筒形过滤器市场分析及竞争策略研究报告001
- 2025至2030年中国空气过滤减压器行业发展研究报告
- 激光清洗机项目可行性研究报告申请备案
- 17J008挡土墙(重力式、衡重式、悬臂式)图示图集
- 口腔癌预防科普
- 2024年环境保护工作责任制度(4篇)
- 《消防应急疏散培训》课件
- DB52T 1458-2019 贵州省森林人家建设标准
- 第47届世界技能大赛制造团队挑战赛项目江苏省选拔赛样题(综合制造专业方向)
- 旅游专业模拟考试题(含参考答案)
- 【S镇35kV变电站一次系统设计(论文)14000字】
- 道路建设工程施工招投标书范本
- 江苏省苏州市(2024年-2025年小学四年级语文)人教版期中考试((上下)学期)试卷及答案
评论
0/150
提交评论