1、MV *Procedure Specification of Steering Gear Repair 1,修理前先进行舵机运转试验检查运动部件的运行情况。Before repair, we will do the steering gear running test to check the running condition.2,进坞后先测量上下舵钮的间隙,上舵承间隙测量,数据记录。舵杆与舵叶联接平面检查,紧配螺栓检查,确定舵杆与舵叶的联接情况。测量重磅平面至撞杆柱塞中心线的高度数据记录。测量撞杆柱塞与十字头的间隙A、B两位置。测量舵叶与假舵的间隙C、D两位置。测量舵杆中心至撞杆柱塞销的距
2、离。(如图1).After drydocking, measure and record rudder pintles clearances and rudder carrier clearances, check the condition of flanges & bolts that connect rudder stock and rudder blade to know how about the connection, Measure and record the distance between ram center line and foundation flange
3、surface, measure and record upper clearance & lower clearance AB between ram and tiller fork, measure and record the jumping clearances CD, measure and record the distance between rudder stock center line and Ram pin.图1. 原始数据测量示意图 (drawing for measurement)3,拆除上下舵钮,拆除舵杆与舵叶平面联接紧配螺栓。舵叶吊离船体放妥。Disman
4、tle rudder pintles, and dismantle the bolts connecting rudder stock flange and rudder blade flange, then lift rudder blade away.4,拆除转舵十字头,拆除转舵轴承总成。测量舵杆轴径,轴承直径,检查平面轴承的贴合面,平面轴承包扎好吊车间放妥。Dismantle rudder tiller and ruuder carrier assembly, measure and record the diameters of rudder stock and rudder carr
5、ier bush, check the condition of plane bearing, then pack the plane bearing and transport it to workshop.5,坞修钳工用拉线方法测量假舵上平面至重磅法兰底座的距离允许误差1mm。Measure and record the distance between upper surface of rudder horn and foundation flange by drawing wire, allowed error is within 1mm.6,轮机钳工测量左、右液缸柱塞与压紧密封函法兰
6、的间隙数据记录。以四周壁拉出液缸柱塞的十字线。Measure and record clearance between rams (both sides) and stuffing flanges. To position 4 reference points on 4 sides wall by drawing wire, and mark them, that will be used for positioning the steering gear when refit them later.7,转舵液缸地座前割除前,必须进行加强用。133mm的管子,横向烧焊加强。Before cut
7、ting the steering gear with its foundation frames (both sides), we will weld pipes (dia, 133mm) to the both sides frames to strengthen the whole set to prevent deformation.8,转舵液缸底座焊缝烊掉后,轮机钳工复测左、右液缸柱塞与压紧密封函法兰的间隙前后数据比对。转舵液缸总成连底座一起移至船体可施工即可。After cutting the steering gear with frames, measure and recor
8、d clearance between rams (both sides) and stuffing flanges again, compare these new data with that of point 6. The steering gear with frames will be removed aside until we have enough space to do the steel job.9,船体可以进行舵承甲板换板工程。并新制平面轴承重磅法兰底座。Now we will start the deck plate renewal, and fabricate new
9、 foundation flange.10,通过拉线初步确定重磅法兰底座的位置,应考虑法兰平面的机加工的切削余量加上先前测量的重磅平面至撞杆柱塞中心线的高度及A、B两点的间隙及舵叶与假舵的间隙C、D两位置数据,通过分析计算最后确定高度。拉线方法可以把上下舵钮作为基准参照,但前提条件是上下舵钮轴承不能磨损太多,否则就要破坏轴承以本体孔为标准。正确的拉线方法是以尾轴中心线为基准点过上下舵钮中心引上去的一根直线。(根据具体情况再确定)Do calculation according to data of point 2 and point 5, we will position the new fo
10、undation flange roughly by drawing wire, and we can ascertain processing margin of new foundation flange and final distance between ram center line and foundation flange surface. If the condition of pintles bushes is available, we can consider pintles as benchmark to draw wire, otherwise we have to
11、take the houses of pintles bushes as benchmark. The right way for alignment is to take the cross point of tailshaft center line and the pintle holes center line as benchmark to draw wire upwards. ( we will do it on spot).11,重磅法兰底座初定位后,船体可进行施焊,要尽量减少施焊所造成的变形。After position the foundation flange roughl
12、y, we will start the welding job, and will do our best to reduce deformation.12,施焊工程结束后,机加工镗重磅法兰底座平面,保证法兰平面与舵杆理论线相垂直,同时平面与撞杆柱塞的中心线高度应该是初定位时计算的高度减去加工的切削量。(如图2)After welding, we will machine the flange surface plumb to the rudder stock center line, After deduct the processing margin, we will ascertain
13、 the final distance between ram center line and foundation flange surface as mentioned in point 10.图2. 底座法兰示意图 (drawing for rudder carrier foundation flange)13,装上平面轴承调整平面轴承,按照舵杆理论线调整平面轴承座的位置,使舵杆上轴承孔与上下舵钮孔在同心位置,并用非紧配螺丝4个进行固定。用角尺检查平面轴承与理论线的垂直度。Refit the ruuder carrier assembly, and adjust its positon
14、according to the rudder stock center line to make the center of rudder carrier be at the same line with the centers of upper and lower pintles. Then temporarily fix rudder carrier asembly to foundation flange using bolts in clearance fit, and check verticality of plane bearing and rudder stock cente
15、r line.14,对称打上定位销确定平面轴承座位置,并按照平面轴承座孔划线,移除轴承座,进行钻孔。If everything is ok, we will symmetrically fit position pins to fix the rudder carrier, and mark the foundation bolts position, then remove the ruuder carrier assembly, and drill holes on foundation flange according to the marks.15,轴承座地脚螺栓孔铰制配紧配螺栓。轴承
16、座装复。(如图3)Finally finish the holes and fabricate new bolts of interference fit, then refit the ruuder carrier assembly.图3. 轴承座安装示意图 (drawing for installment)16,装复舵杆、舵叶。测量上、中、下三个轴承的间隙,平面轴承进行蓝油着色试验要求贴合面积大于90%以上。Refit rudder stock & rudder blade, measure rudder pintles clearances and rudder car
17、rier clearances again. Dye check the plane bearing with blue oil, touched area should be more than 90% of total area.17,转舵液缸总成连底座的定位,根据舵杆的十字中心及先前所测量的重磅法兰底座至撞杆中心线、舵杆中心至撞杆柱塞销的数据,进行调整定位。(如图4)To position the steering gear with frames according to data of point 2, point 5, point 10. 图4. 撞杆定位示意图18,施焊前钳工要测量左、右液缸柱塞与压紧密封函法兰的间隙,或在左、右柱塞液缸上放百分表进行观察控制并延续到施焊工程结束。一经发现有变化立即停止施焊通知技术部。 Before welding, measure c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 教学课件搜索网
- 教学设计课件比赛
- 春季传染病与老年慢性病健康防护指南
- 唇裂术后健康指导
- 信息信息披露管理办法
- 2025至2030中国加固服务器行业发展趋势分析与未来投资战略咨询研究报告
- 价格事务管理管理办法
- 企业车间技术管理办法
- 企业外来收据管理办法
- 低层小区绿化管理办法
- 手术间体温下降的后果及预防
- 医院十四五发展规划
- 物业员工节假日安全培训
- 2024精麻药品培训知识题库(含答案)
- 统编版五年级下册语文第三单元情景化检测题(含答案)
- 生产与运作管理第5版配套教材电子课件(完整版)
- CB-T8525-2017固定资产投资项目项目建议书编制规定
- 矿山买卖居间合同协议书范本
- 汽车维修工时定额核定方法
- 2024-2030年中国车载CIS(CMOS图像传感器)行业市场供需态势及未来趋势研判报告
- 临床心电图解读试题及答案(含识图题)
评论
0/150
提交评论