1、Good is good, but better carries it.精益求精,善益求善。w上承式拱梁组合结构桥墩盖梁施工方案目 录青浦区崧泉路(秀湄路青湖东路)新建工程淀浦河桥桥墩盖梁专项施工方案 编制单位:上海建工一建集团有限公司安装工程公司施工单位:上海建工一建集团有限公司安装工程公司0les disposicions pertinents de l'estat a la verticalitat seguretat supervisió i gestió departaments per avaluar operacions especials unita

2、t nacional ha aconseguit qualificat personal format certificat abans de participar en el corresponent treball o gestió. 7, l'ús de la unitat d'equipament especial ha de ser seguretat equip especial d'equipament especial operador educació i formació, i operadors d'

3、equips especials disposen del material necessari especial per assegurar la seguretat operacional de coneixement. 14, pont de normes de seguretat operació 1, capità, el monitor i els principals tipus de treballadors ha entrenat a correus. Unitat 2, el treballador ha de tenir suficient energ

4、ia, temps de treball no pot excedir de 12 hores al dia. 3, personal de la unitat està estrictament prohibit beure. 4, està estrictament prohibit per a erecció màquina de biga moviment longitudinal i l'exterior a la nit. 5, un pont en ambdós costats de l'òrbita l

5、ongitudinal alta els requisits de nivell, per mantenir un equilibri. Els requisits lateral pista d'atletisme i un control estricte de l'espai, tres pistes ha de ser parallel. 6, installació de biga de formigó de biaix pont, poca Erector, 0, 1, 2a fase, deixat per trontollen i torna

6、da, l'import es calcula segons els angles oblics i l'amplada de les rodes d'esquerra i dreta, per tal que els cotxes poden córrer sobre una pista horitzontal. 7, pont de desplaçament longitudinal per fer tots els preparatius, un cop a lloc, Midway pausa el menys possible. 8, in

7、stal lar superior i inferior pendent vertical, desplaçament longitudinal de màquina pont ha de tenir les mesures per evitar la diapositiva, com ara filet triangular rodes anterior i posterior per a la protecció, espai especial columna 1, molt a prop de la biga, al control de l'ate

8、nció. 9, un pont penjant penjant de provar que la installació de la màquina ha de ser corregut, també es pot utilitzar després de la càrrega de la prova de la biga de formigó i pont erigir màquina i llavors córrer per començar la feina d'installa

9、ció. 10, quan erigir installació màquina, comprovacions de seguretat regular, una seguretat integral comprova cada installació un forat ha de ser trobat per aturar el treball i tractada puntualment amb funcionament intermitent, treball mecànic i elèctric amb malaltia no

10、 estan permeses. 11, la sobrecàrrega d'operació d'installació no és permès. Nivell, ha de ser enfortida sobre terreny prou sòlida, coixinets Outrigger cal afegir per a incrementar la capacitat de la terra. (2) velocitat del vent és superior a 13.8M / s (equ

11、ivalent a 6 vent), grua no deures, quan la longitud de braç és superior a 50 m quan la velocitat del vent no podrà ser superior a 9.8M / s (l'equivalent de 5 vent). I prestar atenció als efectes en l'estabilitat de la grua, vent no penjar-se, davant el vent té alguns

12、 perillós, alçant el contrari. (3) estrictament segons la capacitat nominal quan l'aixecament de la taula i aixecar l'operació corba demode and deepen the reform task of industrialization, urbanization and agricultural modernization, but the industry is big and not strong, agr

13、icultural base is still weak, rural development is relatively lagging behind, farmers' income difficult problem is still a lot of; ideological and moral construction has made important progress, but some areas of moral anomie, integrity deletion The National People's life has reached a compa

14、ratively well-off level, but the gap between urban and rural areas and residents' income distribution is stillAlthough large, education, employment, social security and other vital interests of the masses is also more, part of the life of the masses remains difficult; the creative vitality of so

15、ciety generally increased, but the impact social harmony and stability of the various contradictions also many; and so on. These shows, our country is still in and will remain so for a long time the basic national conditions of the primary stage of socialism has not changed, the people's growing

16、 material and cultural needs with the contradiction between the backward social production, the social principal contradiction does not change, our country's international status as the largest developing country in the world has not changed. I have to the problem, make decisions, do things, to

17、promote reform and development of the any aspect of any field, Should be firmly based on the primary stage of socialism, the largest practical, do is not beyond the stage, and is not backward reality, both best effort, and our capabilities. < the probity of the Communist Party of China self-disci

18、pline criterion > the main content is what? < revised honest self-discipline criterion >, a total of eight, 281 words, including lead, the party honest self-discipline norms and the leadership of the party members and cadres self-discipline norms 3 parts, the main contents can be summarized

19、 as "four must" "eight code". Lead part, reiterated on ideal and faith, the fundamental purpose, the fine traditions and work style, noble sentiments, such as "four must" principle, emphasized self-discipline, accept Higher request for self-discipline supervision subjec

20、t. Finally, the foothold in maintaining the party's advanced nature and purity, to reflect the revised guidelines. Party members standard part around the party members how to correctly treat and deal with the "public and private", "cheap and rot" thrifty and extravagance &quo

21、t;and" bitter and music "the relationship between the four norms". Party leader cadre clean fingered self-discipline norms for the leadership of the party members and cadres of the "vital few", around the "clean politics", from civil servant character, the exercise

22、 of power, moral integrity, a good family tradition and other aspects of the leadership of the party members and cadres "four norms." the Party member of self-discipline norms "and" party members Guide cadre is clean fingered self-discipline norms, "a total of eight, collect

23、ively referred to as the" eight code "." four must "" eight codemanipulator control mode and programmable controllers introduction 2.1 Select discussion with manipulator control 2.1.1 classification of control relays and discrete electronic circuit can control old industrial

24、 equipment, but also more common. Mainly these two relatively cheap and you can meet the old-fashioned, simple (or simple) industrial equipment. So he can see them now, however these two control modes (relay and discrete electronic circuits) are these fatal flaws: (1) cannot adapt to the complex log

25、ic control, (2) only for the current project, the lack of compatibility and (3) not reforming the system with equipment improvements. Spring for the development of China's modern industrial automation technology the substantial increase in the level of industrial automation, completed the perfec

26、t relay of the computer too much. In terms of controlling the computer showed his two great advantages: (1) each of the hardware can be installed on one or more microprocessors; (2) the official designer of the software writing content control is all about. Now in several ways in the context of indu

27、strial automation can often be seen in three ways: (1) Programmable Logical Controller (referred to as IPC); (2) Distributed Control System (DCS for short), and (3) the Programmable Logical Controller (PLC for short). 2.1.2 PLC and the IPC and DCS contrast contrast 1, each of the three technologies

28、of origins and development requirements for fast data processing makes it invented the computer. The men brought in terms of hardware there, using a high level of standardization, can use more compatibility tools, is a rich software resources, especially the need for immediacy in operational systems

29、. So the computer can effectively control is used to control and meet its speed, on the virtual model, real-time and in computational requirements. Distributed system started with a control system for industrial automatic instrument used to control, whereas now it is successfully developed into indu

30、strial control computer used as a central collection and distribution system and transition of distributed control system in analogue handling, loop control, has begun to reflect the use of a huge advantage. Though distributed system has great advantages in loop regulation, but only as a means of co

31、ntinuous process control. Optimization of PLC is the corresponding relay needs was born, its main use in the work order control, early primary is replaced relay this hulking system, focused on the switch controlling the running order of functions. Marked by the microprocessor in the early 1970 of th

32、e 20th century emerged, micro-electronics technology has developed rapidly, people soon microelectronics processing technology will be used in the Programmable Logical Controller (that is目 录桥0墩0盖0梁0专0项0施0工0方0案01、工程简介- 2 -淀浦河桥跨越淀浦河、南北淀浦河路及界三点,桥梁全场478.135m,桥梁宽度28.1m。主桥采用21m+45m+21m上承式拱梁组合结构,引桥上部结构采用预支

33、空心板,引桥标准跨径20m。引桥跨径组合为:南侧7*20m+21.065m+22m,北侧20m+16.070m+4*20m+20m。- 2 -主桥柱墩在承台上设置混凝土拱座,主墩承台厚度2.2m。- 2 -主桥边墩采用柱式桥墩,立柱尺寸1.2m*1.2m,周围均设圆角;每个立杆下设置一个承台,承台厚度1.5m,承台之间设置系梁。- 2 -引桥采用三柱式桥墩,墩顶设置后张法预应力混凝土倒T盖梁。- 2 -引桥桥墩每个立柱下设置一个承台,承台厚度1.5m,顶面覆土一般取1m,下设100mm厚C15素混凝土垫层。- 2 -2、施工工艺- 3 -3、人员机械材料配备- 3 -4、桥墩、盖梁施工进度计划

34、- 4 -5、桥墩、盖梁施工方法- 4 -6、桥墩盖梁施工各项安全措施及安全注意事项- 7 -7、文明环保措施- 11 -1、工程简介1.1淀浦河桥工程简况淀浦河桥跨越淀浦河、南北淀浦河路及界三点,桥梁全场478.135m,桥梁宽度28.1m。主桥采用21m+45m+21m上承式拱梁组合结构,引桥上部结构采用预支空心板,引桥标准跨径20m。引桥跨径组合为:南侧7*20m+21.065m+22m,北侧20m+16.070m+4*20m+20m。主桥柱墩在承台上设置混凝土拱座,主墩承台厚度2.2m。主桥边墩采用柱式桥墩,立柱尺寸1.2m*1.2m,周围均设圆角;每个立杆下设置一个承台,承台厚度1.

35、5m,承台之间设置系梁。引桥采用三柱式桥墩,墩顶设置后张法预应力混凝土倒T盖梁。引桥桥墩每个立柱下设置一个承台,承台厚度1.5m,顶面覆土一般取1m,下设100mm厚C15素混凝土垫层。 1.2墩柱盖梁钢筋及混凝土用量 详见施工图纸C00Q02-02-08C00Q02-02-11,C00Q02-03-02C00Q02-03-04中的材料用量表。2、施工工艺2.1实心桥墩施工工艺钢筋加工搭设脚手架、操作平台钢筋绑扎,预留钢筋焊接支模板,加固浇筑混凝土拆模养护下一段施工2.2盖梁施工工艺测量放线支设底模浇筑混凝土拆模养护钢筋绑扎、焊接侧模加固3、人员机械材料配备3.1淀浦河桥人员配备工区负责人:现

36、场负责人:施工队长:钢筋工:46人;架子及模板工:46人;混凝土工:34人;电工:3人;其他杂工:15人;3.2机械配备桥墩、盖梁、系梁施工主要机械设备如下表:序号名 称参考规格型号数量(台套)备 注(1)钢筋加工机械8施工队自备(2)钢筋运输车3施工队自备(3)汽车吊25T2施工队自备(4)混凝土汽车泵32米2项目部准备,配合施工(5)挖掘机PC2202施工队自备(6)混凝土搅拌运输车SY5290GBJ4项目部准备,配合施工(7)发电机100kw2施工队自备(8)钢模板实心墩2项目部准备,配合施工4、桥墩、盖梁施工进度计划桥墩、盖梁施工进度计划应符合总体施工进度计划,根据具体情况和具备的条件

37、,杨家庄大桥施工进度见后附图。5、桥墩、盖梁施工方法5.1墩柱施工方案淀浦河桥墩柱采用等截面实心墩,等截面实心墩采用翻模法施工。模板:采用整体钢模。钢筋、砼施工:一次性浇注的墩、台身采用定型钢模板和钢支架一次支模到顶,整体浇筑。墩身钢筋,一次绑扎成型。分层浇注的墩、台模板分节拼接,钢筋工厂化加工成型,在上一节段浇注完成后吊装连接。砼由拌合站集中生产,混凝土输送车运输,混凝土泵车或输送泵连续灌筑。砼养护:根据季节不同分别选用砼的养护施工方法,夏季主要采用降温法施工,一是对砼骨料进行洒水冷却,二是在砼浇筑后采用浇水养护降温。冬季不安排施工。5.2墩柱施工工艺(1)墩台钢筋制作安装钢筋在加工车间按设

38、计图纸集中下料、分型号、规格堆码、编号,平板车运到现场,在桥墩钢筋骨架定位模具上绑扎。墩柱钢筋与桩基或上节墩柱预埋钢筋焊接,接长时采用单面焊,焊缝长度不小于10d,焊接人员必须全部持证上岗,以保证焊接质量。接长钢筋时,为保证钢筋不变形,可在墩顶搭设钢管井架辅助施工。在绑扎完钢筋后,用3根缆风绳将钢筋固定,防止钢筋整体倾覆。结构主筋接头采用直筒螺纹或焊接方式连接,主筋与箍筋之间采用扎丝进行绑扎。绑扎或焊接的钢筋网和钢筋骨架不得有变形、松脱现象。采用同标号砂浆混凝土垫块。(2)模板工程1)模板型式矩形实心桥墩模板均采用1.2m*1.5m钢模板,矩形墩外模由两片主模和两片侧模组成,主模面板尺寸1.5

39、米(高)×1.2m(宽),侧模面板尺寸1.5m(高)×1.2m(宽),外模共4块模板。用汽车吊和运输车辆将大模板运至施工现场,将实心墩周边场地清理完成后,现场用汽车吊进行拼装;先立一侧主模,再立两边侧模,最后立另一侧主模,调整好模板位置后,用螺栓和模板连接件将主模和侧模连接牢固,并及时安装好对拉螺栓。然后用水准仪控制第一套模板上口标高,用薄铁片将模板调平,以保证上部其他模板上口水平模板组成平面图如上;模板组成立面图如下图:2)砼浇筑墩身砼浇筑采用混凝土运输罐车运输,泵送入模,柱墩高度在4m或4m以下,均一次性浇筑,柱墩高度在4m以上,分层浇筑,漏斗置于墩顶中心,人工进入到墩

40、内挂串桶,串桶距墩底高度不大于2m。混凝土采用集中拌合,自动计量,罐车运输,泵送混凝土或用汽车吊吊运至漏斗内,混凝土经串桶入模,工人进入到墩底用插入式振动棒振捣,如果墩柱高度超过振动棒作业范围,要求工人必须进入模板内进行振捣,以保证混凝土质量。混凝土采用集中拌制,混凝土拌和物应搅拌均匀,不得有离析和泌水现象,坍落度控制在1416cm。混凝土采用集中拌合,自动计量,罐车运输,泵送混凝土或用汽车吊吊运施工,插入式振捣器振捣。混凝土分层浇筑,分层厚度控制在3045cm。振捣采用插入式振动器,振捣时严禁碰撞钢筋和模型。振动器的振动深度一般不超过棒长度2/33/4倍,振动时要快插慢拔,不断上下移动振动棒

41、,以便捣实均匀,减少混凝土表面气泡。振动棒插入下层混凝土中510cm,移动间距不超过40cm,与侧模保持510cm距离,对每一个振动部位,振动到该部位混凝土密实为止,即混凝土不再冒出气泡,表面出现平坦泛浆。当混凝土浇注到墩顶时,撤掉漏斗及串桶。等砼强度达到施工技术规范要求时,小心拆除模板,保护好墩身不受碰撞,棱角完好不破损。3)混凝土养护根据施工对象、环境、水泥品种、外加剂以及混凝土性能的不同采用不同的养护方案,各类混凝土结构的养护措施及养护时间遵守公路砼强度检验评定标准规定。当新浇结构物与流动水接触时,采取防水措施,保证混凝土在规定的养护期之内不受水的冲刷。拆模后的混凝土立即使用保温保湿的无

42、纺土工布覆盖,外贴隔水塑料薄膜,使用自动喷水系统和喷雾器,不间断养护,避免形成干湿循环,养护时间不少于7d后,拆除养生毯,再用塑料薄膜紧密覆盖,保湿养护14d 以上。养护期间混凝土强度未达到规定强度之前,不得承受外荷载。4)施工缝处理混凝土构件应尽量一次浇筑完成,施工前必须做好停水、停电的应急措施,尽量避免由施工原因造成在混凝土浇筑过程中出现施工缝,当不可避免施工缝时,按规范要求进入混凝土施工缝处理程序。施工缝处理按公路工程桥涵施工规范等相关规定进行,当施工缝处于水平状时,浇筑上层混凝土前应首先浇筑50100mm厚的水泥砂浆,以提高接缝处混凝土的密实性。6、桥墩盖梁施工各项安全措施及安全注意事

43、项6.1砼泵送设备的主要安全措施桥墩主要使用混凝土汽车泵输送混凝土,其安全措施如下:1、泵操作工必须是经培训合格的有证人员,严禁无证操作。2、泵管的质量应符合要求,对已经磨损严重及局部穿孔现象的泵管不准使用,以防爆管伤人。3、泵管架设的支架要牢固,转弯处必须设置井字式固定架。泵管转弯宜缓,接头密封要严。4、混凝土泵料斗内的砼保持一定的高度,防止吸入空气造成堵管或管中气锤声和造成管尾甩伤人的现象。5、混凝土泵的安全阀必须完好,泵送时先试送,注意观察泵的液压表和各部位工作正常后加大行程。在砼坍落度较小和开始起动时使用短行程。检修时必须卸压后进行。6、当发生堵管现象时,立即将泵机反转把砼退回料斗,然

44、后正转小行程泵送,如仍然堵管,则必须经拆管排堵处理后开始,不得强行加压泵送,以防发生炸管等事故。7、砼浇筑结束前用压力水清洗泵时,泵管口前面严禁站人。6.2脚手架工程安全措施1、严格按照桥墩脚手架施工方案及有关规范进行施工。2、钢管脚手架的杆件连接必须使用合格的玛钢扣件,不得使用铅丝或其它材料绑扎。3、矩形墩施工脚手架必须与结构拉接牢固,拉接点垂直距离最大不得超过4米,水平距离不得超过6米。采用刚性拉结,在拉接点处设可靠支顶。4、脚手架的操作面必须满铺脚手板,离墙面不得大于20厘米,不得有空隙和探头板、飞跳板。施工层脚手板下一步架处兜设水平安全网。操作面外侧应设两道护身栏杆和一道挡脚板或设一道

45、护身栏杆,立挂安全网,下口封严,防护高度应为1.5米。5、脚手架必须保证整体结构不变形,纵向必须设置剪刀撑,剪刀撑与水平面夹角为45度60度。6.3焊接作业安全措施桥墩部分部位需要焊接作业,其安全措施如下:1、工作时应穿戴工作服、绝缘鞋、电焊手套、防护面罩、护目镜等防护用品,高处作业时系安全带;2、焊接作业现场周围10米内不得堆放易燃易爆物品;3、作业前检查焊机、线路、电焊机外壳保护接零,确认安全;4、焊接时二次线必须双线到位,严禁用其他金属物作二次线回路;5、焊把线不得放在电弧附近或炽热的焊缝旁,不得碾压焊把线;6、气焊时先开乙炔阀点火,后开氧气阀调整火焰。关闭时先关乙炔阀,再关氧气阀;7、乙炔瓶安装回火防止器,氧气瓶和乙炔

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论