下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、没有被分摊的四个原因一. 库存覆盖范围检查CKMLPP-PBPOPO 收据 : 期间中后继调整的数量 > 累计库存数量,如果依然想把这部 分差异分摊,那么在 CKMVFM 里将价格 限制逻辑去掉Base quantity for stock coverage check, that is cumulated from all operations that result in a value-only posting without quantity (forexample material debits/credits, subsequent adjustments from invo
2、ices or account maintenance). If no stock coverage is given, the Not Distributed line appears in the material price analysis.比如 MR22/ 采购订单后续差异输入 /生产订单结算, 实际上是不影响库存数量的, 但是调 整时可以输入一个数量,如果这个调 整数量 >累计的库存数量, 那么他们的差异数量 (调整数量 -库存数量)部分的差异价值就会 被放在 ”没有被分摊 “中在 CKMLCP 的单层价格确定参数里,可以将 ”不含库存覆盖范围检查的价格确定 “勾上。 If
3、you set this indicator, then there is no stock coverage check for single-level price determination.可能会引起价格突变,最好是先不勾上,分析原因是否合理,排除错误因素后,再勾上 运行!二. 避免 PUP 为负fallback strategy : "Automatic Error Correction by the System" As a solution, you might check the postings of these materials if they rea
4、lly need to have such big negative price differences or if there is some kind of error in the posting or the production structure. If you find such errors, you might reverse the corresponding postings and post them in a correct way.Or, you might use transaction MR22 (debit/credit material) in order
5、to post an appropriate positive amount of differencesto the concerned materials so that the resulting actual price would no longer be negative. This allows to perform theperiod closing regularly. In the next period, you might remove this manual posted value from the materials (again withMR22) in ord
6、er to correct the overall stock values back to their original amounts. ( 如果负差异很 大为正常情况,可以考虑 用 MR22 输入一个正差异调整,下月再用 MR22 输入一个负差异调整回来)( 一) Fallback strategy when price is negative (one-way step)It following casesa.that the quantity of the "cumulative inventory" is zero,b.or that the price det
7、ermined is negative. For example, because a very large credit is posted into category"Other receipts/consumption".In these cases the system cannot determine a price or it cannot determine an allowed price. The system therefore must use another calculation line instead of the cumulative inv
8、entory. This usage of another calculation line is called"fallback strategy". In this case you have the following levels:1. First, the system uses category "Receipts" as the calculation line. In this case the system generates message: C+135.2. If the price based on the receipt qua
9、ntity is also negative or if the receipt quantity is zero, the system uses category"beginning inventory" as the calculation line. In this case the system generates message: C+138.3. If the price based on the beginning inventory is also negative or if the beginning inventory quantity is zer
10、o, the systemuses the periodic unit price of the previous period as the new price. In this case the system generates message: C+136.4. If the material for the previous period did not yet have any periodic unit price, the system uses the standard price ofthe current period as the new periodic unit pr
11、ice. In this case the system generates message: C+137.如果期初库存为负,累计差异 =期初差异 +本期收据差异 * (本期累计数量 /本期收据数量) , 然后 PUP= (累计标准价值 +累计差异)/累计数量(二)Fallback strategy when price is negative (cycle)The system issues error message C+723 and uses a fallback strategy.Here the following messages can be generated:CKMLMV0
12、34:Cycle &1 will be recosted with the reduced actual BOMIf the price of a material that is in a cycle becomes negative, the fallback strategy described above cannot be carried out.As an automatic fallback solution, all input materials that are also cycle materials are ignored.(三)Fallback strateg
13、y when value exceeds threshold (for one-way step)Here the following messages can be generated:CKMLMV020:Step &1: Packet & 2 is first costed with the actual BOMCKMLMV018:Step &1: Packet & 2 costed again with a reduced BOMCKMLMV021:Multilevel price determination with a reduced actual B
14、OM(四)Fallback strategy when value exceeds threshold (for cycle)Here the following messages can be generated:CKMLMV020:Step &1: Packet & 2 is first costed with the actual BOMCKMLMV018:Step &1: Packet & 2 costed again with a reduced BOMCKMLMV021:Multilevel price determination with a re
15、duced actual BOM(五)Fallback strategy when cycle does not converge Here the following messages can be generated:CKMLMV005:Cycle &1 broken off after &2 repititionsCKMLMV012:Input material & 1 will be removed for the iteration (process &2)三. 执行了 CKMM.When transaction CKMM is processed t
16、he system deletes the price differences for the material in the period and these differences are not longer in the period record tables. CKMM 会将差异删除, 这些差异将不再被 记录到物料分类帐记帐表里,放在了 CKM3 的没有被分摊里,这是 CKM3 显示错误,因为显示在 CKM3 里的 “没有被分 摊”在期间里是没有记录的了。The fact is that the price differences are still visible in CKM3
17、 (as not distributed). This is due to the missing reset of summarization records (MLCD).This error is just a problem of CKM3 display, because the differences shown as 'not distributed' do not exist in the periodic records. The PUPof the material is calculated correctly.See note 384553 for fu
18、rther details. (46C )The error is solved with note 838989: (Hotpackage 46C SAPKH46C51470 SAPKH47025500 SAPKH50010600 SAPKH60001).假设上线时,材差科目有很多余额,这些差异并未显示到 CKM3 里,要用 MR22 来初始化差 异!四. 价格修改结果 (LTPC).In transaction CKM3 when a subsequent price change (LTPC) is carried out, the preliminary valuation and a
19、ll differencesare rescaled at category level. Additionally, the corresponding lines for price change documents are sorted and flaggedwith the text "Subsequent price change".If a late price change is run with transaction MR21 and there were not a previous reversal of the consumptions alread
20、yposted in the period, these documents cannot be rescaled by transaction MR21.Therefore transaction CKM3 will show a "Not distributed line" although the PRDs are rescaled correctly. This is then a display side-effect in CKM3.不包括原因A) 多层结算未运行 检查物料状态,重新运行多层结算 订单未收货 (有输入和输出物料的业务才能将多层差异分配出去)联产品未收货 (主产品的物料主数据里维护了分摊比例,而联产品没有收货,因为ML 是按主数据里的比例结
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 电工电子技术(第3版) 课件 5.1.1 半导体及PN结
- 2024年新型节能型内燃机项目资金需求报告
- 银行风险管理制度
- 采购合同管理及风险防范制度
- 《供给与局部均衡》课件
- 保护古老文明-课件
- 《计算中心编制》课件
- 法学案例-洛克菲勒中心案例都市综合体
- 《促销督导入门指引》课件
- 古诗词诵读《 书愤》课件 2024-2025学年统编版高中语文选择性必修中册
- 李商隐诗歌《锦瑟》课件
- 世界文化遗产-乐山大佛课件
- 2022小学一年级数学活用从不同角度解决问题测试卷(一)含答案
- 博尔赫斯简介课件
- 2021年山东交投矿业有限公司招聘笔试试题及答案解析
- 施工单位资料检查内容
- 大气课设-酸洗废气净化系统
- 学校校庆等大型活动安全应急预案
- 检测公司检验检测工作控制程序
- 高血压病例优秀PPT课件
- 精密电主轴PPT课件
评论
0/150
提交评论