1、中国庶达工程乞司懸湖北中兴电力试验研究有限公司CNNGOA ENG CORP Of CHINA 曙m ira他伽讯嘅ten恥eracomCommissioning Procedure for Induced Draft Fan SystemPage: 1 of 14E07007Docume nt Class1CHENGDA ENGINEERING CORPORATION OF CHINACHENGDA JOB NO. E07007AFor approvalOct. 20, 2008Rev.DescriptionDatePreparedCheckedReviewedApprovedPT. PLN
2、 (PERSERO)OWNER 'DWG. NO.rekadaya elektr leaHPT. PLN (PERSERO)JASA SERTIFIKASI (LMK)Client 'Project No.PLTU 2 BANTEN-LABUAN (2x300MW)Labua n, Banten, the Republic of Indon esiaDWG. NO.E07007-PR-TM-1003Electro nic File Name:Date of Issue:Revisi on No.Oct. 20, 2008AThis document is restricted.
3、 Neither he whole nor any part of this document may be disclosed to any third party without the prior written consentof ChengdaEngineering Corporation of China, in which the copyright of this document is vested. All copyrights reserved. Neither the whole nor any part of this document may be reproduc
4、ed, stored in any retrieval system or tran smitted in any form or by any mea ns (electro nic, mecha ni cal, reprographic, record ing or otherwise) without the prior consent of the copyright owner.1. PurposeThe purpose of this document is to establish the commissioning procedure for IDFbody and its s
5、ystem. Inspect and adjust the IDF body、 motor、piping and its accessories, and ensure the running performanee of the equipments is normal, control and protection is correct, so that it can satisfy the requireme nts of running.2. Refere nee docume ntDrawing NO : F289S-J0201B-02、F289S-K0201B-053. In st
6、rume ntPocketable vibrati on meter: vm-63a;In frared thermometer: Raytek PM Plus;Digital tachometer: EMT260B;DCS and Local meters for other parameters.4. Safety precauti ons1) Before the commissio ning, the prin cipal must in struct all testers to un dersta nd the purpose、require、procedure、dan ger a
7、nd safety measure of the commissi oning, and all testers should know their duty.2) When coming into construction locale, notice alert mark; prohibit going into in eligible walkway, dan gerous work place and non-light ing place.3) Before the commissio ning,assure that all protect ions are workn ormal
8、ly.4) Verify the earthing of fan motor and safeguard of coupling before start fan.5) Close the guide blade tightly before startup.6) Assign a site supervisor and keep away at axial safe zone while running fans.7) Monitor the motor currents strictly, it is forbidden to work overload.8) Monitor the pa
9、rameters of IDF strictly, shut down IDF manually at emerge ncy.9) While accident shutdown, carry out check only after switching out power and hanging a sign of NO OPERATION.5. Main equipme nt specificati onFan typeAN25e6Motor typeYKK710-6THVolume flow282m 3/sTotal pressure5756PaFan speed995r/minMoto
10、r speed995r/minMotor output2100kwvoltage6kVcurre nt238A6. Pre-Commissio ning procedure6.1. Precondition for pre-commissioningThere is turn over package from con struct ion team to commissi oning team said that system ready to test.1) Installation of fan & its auxiliary equipment completed and ac
11、cepted.2) Electrical installation finished and protection function is normal. In dividual running of fan motor fini shed with correct rotary directi on and startup curre nt record.3) There is eno ugh light ing at site.4) Removing of debris and scaffold around fan. There is good covering of trench an
12、d no flammables & explosives locally.6.2. Dampers checkThe purpose of the inspection is to make sure that the damper can be operated at DCS, and the position of the damper is the same between CRT display and local meter.1) Full ope n and full close MV (motor-drive valve) check2) The blade (con t
13、rol valve) checkRefer to appe ndix 1.6.3. Function checkFunction check in cludes the followi ng items.1) IDF A #1 cooling fan logical function check2) IDF B #1 cooling fan logical function check3) IDF A&B in let dampers logical fun ctio n check4) IDF A&B outlet dampers logical
14、function check5) IDF A&B in let connecting dampers logical fun cti on check6) IDF A&B sequenee start logical function check7) IDF A &B sequenee stop logical function check8) IDF logic function inspect64 IDF protecti on function checkApply the analog signals to every measurepoint; make su
15、re every measure point can work correctly.Refer to appe ndix 2.7. Trial operati onIn principle, the IDF and FDF should running at the same time.7.1. Necessary precondition checkRefer to appe ndix 3.7.2. Trial operation process7.2.1. Cooling fan check and start1) The piping of the cooling fan system
16、is expedite2) The inlet valves of the cooling fans should be open.3) Start up one cooling fan.4) Turn the linkage switch of the spare cooling fan to“uto ” position.7.2.2. Startup one IDFStart one IDF as its procedure and keep the bladening atopperce nt.Adjust blade accord ing the requireme nt.7.2.3.
17、 Start up one FDFStart up FDF should according to the commissioning procedure for FDF system and keep ope ning of 0 perce nt. Adjust blade as dema nding.Keep normal furnace pressure by adjusting guide blade. Check and record the parameters of IDF.7.2.4. Start up the other IDF and FDFStart the other
18、IDF and FDF, keep normal furnace pressure. The process and parameter mon itori ng are as above.7.2.5. Adjust and record of the commissioningfor IDFAdjust guide blade and make the IDF running at a big load state.If IDF can run 8 hours continu ously, the commissi oning is successful.The commissi oning
19、 result records are show n in appe ndix 4.6.3Adjust and record of the commissio nin gfor Boiler Un it StartupNecessaryc on diti ons check for IDF commissi oning is the same as 6.1.During the commissioningfor boiler unit startup, record the running data of the IDF when the unit load is 0%, 25%, 50% a
20、nd 100%Appe ndix I Check list of IDF system dampers 1 (MV)PLTU2 BANTEN-LABUAN(2 300MW)Un it : System n ame : IDF systemDateNO.Descripti onResultSUBCONCHENGDAOWNERope ncloseope n/close time1空预器A进口烟气挡板1AH A inlet gas damper 1 10HNA10AA001a2空预器A进口烟气挡板2AH A inlet gas damper 2 10HNA10AA001b3电除尘A出口烟气挡板1ES
21、P A outlet gas damper 1 10HNA11AA001a4电除尘A出口烟气挡板2ESP A outlet gas damper 2 10HNA11AA001b5引风机A出口烟气挡板1IDF A outlet gas damper 1 10HNA12AA001a6引风机A出口烟气挡板2IDF A outlet gas damper 2 10HNA12AA001b7空预器B进口烟气挡板1AH B inlet gas damper 1 10HNA20AA001a8空预器B进口烟气挡板2AH B inlet gas damper 2 10HNA20AA001b9电除尘B出口烟气挡板1
22、ESP B outlet gas damper 1 10HNA21AA001a10电除尘B出口烟气挡板2ESP B outlet gas damper 2 10HNA21AA001b11引风机B出口烟气挡板1IDF B outlet gas damper 1 10HNA22AA001a12引风机B出口烟气挡板2IDF B outlet gas damper 2 10HNA22AA001b13电除尘出口联络门ESP outlet connecting damper10HNA13AA001Appe ndix ICheck list of IDF system dampers 2 (CV)PLTU2
23、 BANTEN-LABUAN(2 300MW)Un it : System n ame : IDF systemDateNO.Descripti onResultSUBCONCHENGDAOWNER0%50%100%ope n/close time1引风机A静叶IDF A static blade 10HNC11AN0012引风机B静叶IDF B static blade 10HNC21AN001RemarkAppe ndixlllDF protecti on fun cti on checkPLTU2 BANTEN-LABUAN(2 300MW)Un it : System n ame :
24、IDFsystemDateNO.Descriptio nsAlarm/trip valueTest value1IDFmotor front bearingtemperature (°C )85/952IDFmotor rear bearingtemperature (C )85/953IDFmotor coiltemperature 1 ( C )125/1304IDFmotor coiltemperature 2 ( C )125/1305IDFmotor coiltemperature 3 ( C )125/1306IDFmotor coiltemperature 4 ( C
25、)125/1307IDFmotor coiltemperature 5 ( C )125/1308IDFmotor coiltemperature 6 ( C )125/1309IDFfront bearingtemperature 1 ( C )90/10010IDFfrontbearingtemperature 2 ( C )90/10011IDF middlebearingtemperature 1 (C )90/10012IDFmiddlebearingtemperature2 (C )90/10013IDFrear beari ngtemperature 1 (C)90/10014I
26、DFrear bearingtemperature 2( C )90/10015IDFX direct ion beari ng vibrati on (mm/s)4.6/7.116IDFY direct ion beari ng vibrati on (mm/s)4.6/7.1Remark :COMPLETED BYSUBCONCHENGDAOWNERNAMESIGNATUREDATEUn it : System n ame : IDF systemDateNO.Descripti onRequireme ntresult1IDF bodyeligible2IDF outlet damper
27、 static bladeOperate flexibly; local and CRT display are correct.3Air andGassystemdampersOperate flexibly 。4Cooli ng fanAccord ing with desig n request.5Cooli ng fan lin kageAccord ing with desig n request.6Electric equipme nteligible7Trip butt oneligible , can be put into operation。8IDF motorIn sul
28、atio n eligible9Test spot meterLocal meters and CRT display are all no rmal10PAF protecti on functionNo sig nal con stra int11Turn gear beforeIDFstartupNo frictio n12Air and Gas flueno sun dries、no one work in the air and gas flue13IDFEligible,ca n be put into operati onRemark :COMPLETED BYSUBCONCHE
29、NGDAOWNERNAMESIGNATUREDATEAppe ndix IV-IFa n beari ng temperatureUn it : System n ame : IDF systemDateTimeBladeOpening(%)Motor curren t (A)Temp.( C)H:90 CHH:100 CRated curre nt (A)#1#2#3#4#5#6Remark :#110HNC11CT009#210HNC11CT010#3 10HNC11CT011IDF Front bearing Temp.1IDF Front bearing Temp.2IDF Middl
30、e bearing Temp.3#410HNC11CT012#510HNC11CT013#6 10HNC11CT014IDF Middle bearing Temp.4IDF Rear bearing Temp.5IDF Rear bearing Temp.6The KKS number should be cha nged from HNC11 to HNC21, whe n FDF B is used.COMPLETED BYSUBCONCHENGDAOWNERNAMESIGNATUREDATEAppe ndix IV-IIFan motor beari ng temperaturePLT
31、U2 BANTEN-LABUAN(2 300MW)Un it : System n ame : IDF systemDateTimeBladeOpe ning (%)Motorcurre nt (A)Temp.( C )H:85 CHH:95 CRated curre nt(A)#1#2Start ing curre nt (A):Remark:#1一 10HNC11CT007#2一 10HNC11CT008IDF A motor front bearing temp.IDF A motor rear bearing temp.#1一 10HNC21CT007#2一 10HNC21CT008I
32、DF B motor front bearing temp.IDF A motor rear bearing temp.COMPLETED BYSUBCONCHENGDAOWNERNAMESIGNATUREDATEAppendix IV-IIIFan motor coilemperaturePLTU2 BANTEN-LABUAN(2 300MW)Un it : System n ame : IDF systemDateTimeBladeOpening(%)Motor curre nt (A)Temp.( C)H:125 CHH:130 CRated curren t(A)#1#2#3#4#5#6Remark :#110HNC11CT001#2一10 HNC11CT002#3一 10 HNC11C
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 沟通诊断课程设计
- 驱蚊工具制作课程设计
- 秋天的画报课程设计
- 什么是望月镜头课程设计
- 2024至2030年中国沙参玉竹凉茶颗粒行业投资前景及策略咨询研究报告
- 2024至2030年中国汽车前桥总成数据监测研究报告
- 高聚物课程设计
- 2024年中国纯野生葛粉市场调查研究报告
- 标识绘制课程设计
- 中国链条式挖沟机行业市场现状分析及竞争格局与投资发展研究报告(2024-2030版)
- 各省中国铁路限公司2024招聘(目前38183人)高频难、易错点500题模拟试题附带答案详解
- 杭州本级公共租赁住房资格续审申请表Ⅴ
- 建筑垃圾外运施工方案
- 上海市青浦区上海五浦汇实验学校 2024-2025学年上学期六年级数学期中试卷(无答案)
- 大学实训室虚拟仿真平台网络VR实训室方案(建筑学科)
- 体育赛事组织与执行手册
- 2024年扩大“司机之家”覆盖范围工作策划方案
- 课内阅读(专项训练)-2024-2025学年统编版语文四年级上册
- 2024-2025学年高二英语选择性必修第二册(译林版)UNIT 4 Grammar and usage教学课件
- 二十届三中全会精神学习试题及答案(100题)
- 苏教版数学五年级上册《解决问题的策略》
评论
0/150
提交评论