安全控制措施-(中英文)_第1页
安全控制措施-(中英文)_第2页
安全控制措施-(中英文)_第3页
免费预览已结束,剩余9页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、7. Quality Control Measures7.1 The people who are engaged in doing test must have enterprise, consciousness of responsibility and relevant work certificates, and perform their position duties with due diligence. It is necessary for them to study and digest drawings and relevant documents as soon as

2、possible. If any problem is found, it is necessary to raise it in time. Further, being explicit with the work scope and test items is indispensable.7.2 Testing personnel must comply with all valid regulations, specifications, provisions, standards, and methods issued by nation and accepted by indust

3、ry.7.3 Testing personnel must be familiar with the operation and performance of testing equipment, instrument and apparatus. And guarantee they are in good working conditions.7.4 Testing personnel must make original records with discreetness and secure the authenticity and reliability of test data w

4、ithout leave-out and mistake, so that the data can serve as proof for investigation. The electronic version of test reports must be preserved properly to protect them from being damage and tampered.7.5 When the quality is in conflict with the project period, insist on the quality first thought.The u

5、nqualified products are reported to the factory or replaced.7.6 Any accident due to poor quality, regardless of its seriousness, occurring or not cannotbe hidden, indulged, and compromised.8. Safety, civilized construction and environmental management.8.1 General provisions8.1.1 All workers who are

6、engaged in construction must pass safety examination and health examination, understand safe operation regulations of different types of work. Before work can start, technicians must give safety instructions and safety instructions to workers and specify working method, procedure, precautions and pe

7、rsonal duties to workers. After this, the workers are required to sign off the instruction records for confirmation and registration before they are allowed to start working. Any worker who does not undergo instructions is not allowed to work on the site.8.1.2 It is not allowed to drink alcohol duri

8、ng the work time. No one is allowed to enter the site intoxicated. It is forbidden to work when a worker is ill.8.1.3 People who enter the site must wear PPE correctly. It is forbidden to wear slippers, high heels or shoes with nails; all special type of workers such as person who is engaged in high

9、 voltage test must have certificates and be familiar with their own work.8.1.4 Test equipment must be stacked in order tidily based on the regulations set up and comply with transportation and firefighting requirements.8.1.5 Set up sufficient illumination for night shift.8.1.6 Workers who need to wo

10、rk at height must wear harness and hook it to the safety rope to avoid falling down from the height.8.2 Test in a safe manner8.2.1 Only electrician is allowed to dismantle and assemble construction power consumption facilities.8.2.2 Electric equipment must beoperated based on tag instructions. It is

11、 forbiddento use oneswitch for several power connections.8.2.3 It is not allowedto hook the wire directly to the switch blade or directly plug wire intopower socket. The switch of test devices should adopt double-pole switch with obvious break point and reliable overload protection device.8.2.4 When

12、 works in the site, based on the voltage class of the electrified body the testing personnel must keep a safe distance away from electrified body, which should not be less than the distance regulated in thesafety regulations'.8.2.5 The metal shell of the test tools must have proper grounding. Wi

13、ring between test instruction and equipment must be firm and reliable. After insulation resistance measuring and DC test is finished, it is necessary discharge the tested objects thoroughly.8.2.6 The test should be conducted under the circumstance when the weather is good. If strong wind and thunder

14、storm take place, it is necessary to stop the test.8.2.7 After the test is complete, testing personnel must dismantle temporary grounding wire and inspect the tested equipment and clean the testing spot.8.3 Housekeeping Measures8.3.1 After the test is completed, the principalfinish the work, clean t

15、he site and take awaythe material 'should be abided by.8.3.2 The wall and barricading established on the site must be stable, tidy and nice.8.3.3 Testing personnel must establish awareness to protect finished products. It is forbiddento dismantle, take away and paint the finished products arbitr

16、arily without permission.8.3.4 It is not allowed to work after drinking.8.3.5 No smoking is allowed within the testing spot. No open fire is allowed for keeping warm within testing spot.8.3.6 When leave the working area, it is necessary to shut down the power supply and lock the window to protect th

17、e working area from theft.8.4 Environment Protection Measures8.4.1 The tags and labels on the construction site must be tidy, aesthetic with eye-catching slogans.8.4.2 Temporary work on the site must be standardized and proceed in good order. Keep circumstance inside and outside the tools storage ro

18、om clean and sanitary.8.4.3 Test equipment and test devices must be stack tidily in good order in the designated area. It is necessary to abide by the principalfinish the work, clean the site and take away allmaterials '8.4.4 Test equipment must be clean and tidy. Power supply panels must be sta

19、ndardized with complete locks. Safety protection measures are completed and reliable.8.4.5 Strictly comply with public moralities, professional ethics, professional disciplines. Dispose of the neighbor relationship with other companies in the site properly. And try best to get the support and unders

20、tanding from the relevant companies.8.4.6 The cable rack of temporary construction power supply must meet safety requirements, power panels must be standardized and the illumination must be arranged properly.8.4.7 In order to prevent the trash from spreading to public area, roads, and it is necessar

21、y to stop the slag and residue from spilling.8.5 Emergency PlanThe manager of HSEdepartment is responsible for initiating to organizing emergency respond group and set up clinics both on the site and nearby office area. Designate constructors emergency muster point on the site.8.5.2 First aid for el

22、ectric shock: cut off the power supply immediately, pull down the switch,turn off the power supply switch and unplug the plug. Make sure that the victim hurt by electric shock is disconnected from the power supply and send him/her to the site clinic for treatment.8.5.3 Once emerge ncy accide nt take

23、 place in the site, the releva nt pers onnel must report it tothe emerge ncy comma nd group immediately. Mean while, it is n ecessary for him to inform HSEemergency treatment personnel on duty. Project department HSEneeds to mark out the caution area based on the site actual situatio n. And make sur

24、e the access for salvage is accessible anduni mpeded. Gather the un authorized pers onnel to the emerge ncy muster point. After counting upthe head of the pers onn el, evacuate them based on the preassig ned evacuati on routes.8.5.4 Medical staff in the clinic must rescue the injured person or give

25、the injured person firstaid based on the injured pers on status. If the injured pers on n eeds to be sent to hospital forsalvage, it is n ecessary to dial 120 immediately for the ambula nee service.9. Con structi on Risk and Housekeep ing Forecast Con trol Pla n Table9.1 Con struction Risk Control P

26、lan TableCon struction Risk Control Plan TableNo.:Compilation Date:RevProject :Unit No.:Con struct ion Item: synchronous gen erator testNo.RiskDescriptio nSafety and Tech niqueMeasures Proposed toTakeRiskLevelCo ntrolCompa ny/pers onResp on sibleMethodOpportunityTeamDepartmentSig na ture1Test equipm

27、e nt bad gro undingThe shell of the test equipme nt must have proper grounding. The wiri ng betwee n test in strume nt and equipme nt must be reliable. The power switch of the test device should have obvious break pointGATNo.:Compilation Date:RevProject :Unit No.:Con struct ion Item: synchronous gen

28、 erator testNo.RiskDescriptio nSafety and Tech niqueMeasures Proposed toTakeRiskLevelCo ntrolCompa ny/pers onResp on sibleMethodOpportunityTeamDepartmentSig na turewith double-pole switch blade. Further, liable overload protect iondevice mustbe in place .2No barricadi ng for test areaTest area must

29、be barricaded and hang up warning board withStop! High VoltageDangerous! ' and desig nate dedicated pers on to supervise.Un authorized pers on is not allowed to en ter the test area.GWTNo.:Compilation Date:RevProject :Unit No.:Con struct ion Item: synchronous gen erator testNo.RiskDescriptio nSa

30、fety and Tech niqueMeasures Proposed toTakeRiskLevelCo ntrolCompa ny/pers onResp on sibleMethodOpportunityTeamDepartmentSig na ture3No supervisi on duri ng voltage boosti ngBefore test starts, person in charge should specify the safety matters that require close atte nti on to all testi ng pers onn

31、el.Clarify the work divisi on and desig nate dedicated pers on for supervisi on.JST4Not impleme ntin g loudly verbal in structi onDuring the test, it is necessary to designate some one to supervise and give verbal in structio n loudly.During the test, the testi ng pers onnel must be concen trated. W

32、hen abno rmal case takes place, it is n ecessary to in vestigate the reason before continue the test.YATNo.:Compilation Date:RevProject :Unit No.:Con struct ion Item: synchronous gen erator testNo.RiskDescriptio nSafety and Tech niqueMeasures Proposed toTakeRiskLevelCo ntrolCompa ny/pers onResp on s

33、ibleMethodOpportunityTeamDepartmentSig na ture5Falli ng fromheightIf special tools for work ing at height are required, it is n ecessary to take measures to protect the ceramic particles from being damaged and protect workers from falli ng dow n.JST6After in sulati on resista nee measureme nt and DC

34、 test are fini shed, do not thoroughly discharge the tested items.In order to protect the equipme nt and secure pers onal safety, it is necessary to discharge the tested items thoroughly after DC test and in sulati on resista neemeasureme ntare completed.GAT7Workers blun der into wrong room and doWo

35、rk permit system, work lice nse system, work supervisi on system, work cease,JSTNo.:Compilation Date:RevProject :Unit No.:Con struct ion Item: synchronous gen erator testNo.RiskDescriptio nSafety and Tech niqueMeasures Proposed toTakeRiskLevelCo ntrolCompa ny/pers onResp on sibleMethodOpportunityTea

36、mDepartmentSig na turenot keep safe dista nee away from the electrified bodytran sfer and term in ati on must be carried out. The testi ngpers onnel mustkeep a safe dista nee which cannot be less than the value written in theafetyregulations ' away from the electrified body based on the voltage

37、levels.No.:Compilati on DateRevProject :Un it No.Con struct ion Item: synchronous gen erator testNo.RiskDescriptio nSafety and Tech niqueMeasures Proposed toTakeRiskLevelCo ntrolCompa ny/pers onResp on sibleMethodOpportunityTeamDepartmentSig na ture8Change test wiri ng without cutti ng off the power

38、 supplyIt is n ecessary to set the voltage regulator to zero first if cha nges wiri ng, and the n break the power switch side blade. Discharge the tested items and voltage boosti ng equipme nt at its output end by gro unding. After the test is finished,it isnecessary to dismantle the temporary gro u

39、nding wire, check the test equipme nt and the n clea n the test site.GATNote: 1. Risk level: J-extreme, G-high, X-significant, Y-common, S-slight2. Con trol method: W-wit ness, H-halt for in spect ion, S-successive supervisi on, A-alert3. Timi ng Con trol: P-pre job, D-once daily, W-once weekly, T-e

40、very time before work starts9.2 Housekeep ing Forecast Con trol Pla n TableHousekeep ing Forecast Con trol Pla n TableNo.:Project :Con struct ion ItemCompilati on DateUn it No.:synchronous generator testRev :Descripti on of misc on due tSafety and Tech nique MeasuresProposed to TakeCo ntrolCompa ny/pers onresp on sibleNo.MethodTimi ngTeamDepartmentPers on in chargeAssign a dedicated person to beresp on siblefor the siteFilthyhousekeep ing. Con stitute sitesite,clea ningsta ndard,and1disorder a

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论