1、电气施工图设计说明电气施工图设计说明一建筑概况本建筑为框架结构,功能分为:生产区、管理区和仓库区,生产区为二层,管理区为三层,仓库区为一层。仓库区内的装卸区为三层。层高:生产区:一层:5.5M;二层:6.25M;管理区: 4.0M ,4.25M(有吊顶及架空地板) ;仓库区:11.75M;总建筑面积:9129M2。Design Specifications for Electric Constructional DrawingsI Building profileThis building is of frame structure, the functions of which can be
2、 divided into producing area, managerial area, and warehouse area. The producing area is two- story, three stories for the managerial area, and one story for the warehouse area. There is a three- story loading and unloading area inside the warehouse area. Story height: producing area: one story: 5.5
3、 meters; second story: 6.25 meters; managerial area: 4.0 meters and 4.25 meters (with suspended ceiling and aerial floor board); warehouse: 11.75 meters; total constructional area: 9129 square meters.二设计依据:供配电系统设计规范 (GB50052-95)工业与民用电力装置的接地设计规范 (GBJ65-83)建筑设计防火规范 (GBJ16-87 2001)低压配电设计规范 (GB50054-95)
4、建筑物防雷设计规范 (GB50057-94)II Basis for Design“Design Specifications for Power Supply and Distribution System” (GB50052-95)“Design Specifications for Earthing for Industrial and Civil Power Installations” (GBJ65-83)“Specifications for Fire Control in Architectural Design” (GBJ16-87 2001)“Design Specifica
5、tions for Low Voltage Distribution” (GB50054-95)“Lightning Protection Design Specifications for Buildings” (GB50057-94)三设计范围:本工程设计范围包括:厂区总图界区内建筑物的低压供配电、照明、防雷及接地设计。III Scope of DesignDesign for this project includes low voltage power supply, low voltage power distribution, lighting, lightning protect
6、ion, and earthing design for buildings inside the overall factory area. 四负荷等级:本工程为五金加工厂,一班工作制,用电设备主要为机加工、空调、照明及办公用电,根据 属于三级负荷。2IV Load Grade: This project is a hardware processing plant. Its working system is one shift. Equipments using power mainly are machine work, air conditioners, lighting, and
7、office power utility. It belongs to a Grade III power load according to and .五电源状况:本工程的变电所设置在界区内的西北侧,其中包括 10KV 分界室及变配电室。低压配电室以放射供电方式向建筑物内各配电柜、配电箱供电。V. Power Supply Situation: transformer station of this project is set at the northwest side of the factory area, of which there is a 10KV separation roo
8、m and a power distribution and transformer room. The low voltage distribution room will supply power to all distribution cabinets and distribution boxes inside the building in the form of radiation.六供电方式从变电所引出的电缆沿室外电缆沟内电缆支架直接引入建筑物内各配电箱、配电柜。从建筑物内各配电箱引出的线路分别采用电缆或导线沿电缆桥架或钢管敷设。道路照明电缆为铠装电缆直埋敷设。VI Modes f
9、or Power SupplyCables introduced from the transformer station will be stretched directly to all distribution cabinets and distribution boxes inside the building along the cable bracket in the cable trench outdoors. Lines resulted from all distribution boxes inside the building shall respectively ado
10、pt cables or conducting wires that are arranged along the cable viaducts or steel pipes. Cables for road lighting are armored cables directly buried.七防雷与与接地按 GB50057-94,本工程的主建筑物为第三类防雷建筑物,为防直击雷,在建筑物屋面装设避雷网,屋面避雷网格不大于 20MX20M,避雷网通过引下线接至防雷接地装置。金属屋面直接接地,引下线利用柱内主筋。并在地面附近装设检测卡。VII Lightning Protection and
11、EarthingAccording to provisions of GB50057-94, main building of this project is a Grade III lightning-proof building. In order to avoid direct lightning, a lightning-proof network is set on the roofing of the building. The mesh of the lightning-proof network shall be no larger than 20mX20m, and this
12、 network shall be connected to lightning-proof earthing device via down lead. Metal roofing shall be earthed, and the down lead shall utilize main reinforcement inside post. Inspection card shall also be installed around on the surface.为防雷电感应,在建筑物内设备、管道、构件等金属物应就近接至防雷接地装置。建筑物内的电子设备按规范要求设至雷电磁脉冲保护装置。安装
13、高度低于 2.4 米的灯具(其中包括泵房灯具)线路加 PE 线。In order to avoid lightning induction, lightning-proof or earthing devices shall be installed 3near to such metals as equipments, pipelines, and structural members inside the building. All electronic equipments inside the building shall be in accordance with regulatio
14、ns to arrange lightning magnetism pulse protection devices. PE Line shall be added for lines of lighting fittings (include lighting fittings inside pump room) whose height for installation is less than 2.4 meters.本工程低压系统为变压器中性点直接接地,采用 TN-S 系统。变压器中性点接地、电气设备外壳接地、防静电接地及防雷接地共用一个接地系统,并做等电位连接。其总接地电阻值要求不大于
15、 1 欧姆。利用建筑物地梁内主筋做接地体,做重复接地,接地电阻1 欧姆,并做总等电位联接,总等电位联接详见 02D501-2 11-15 页。The low voltage system of this project is direct earthing at the neutral point of transformer and adopts the TN-S system. The neutral point of transformer, electronic equipment outer covering, static electricity, and lightning pr
16、otection shall use one earthing system jointly, and be connected isopotentially. The overall earthing resistance shall be no more than 1 ohm. Main reinforcement inside ground beam of the building is used to earthing. Iterative earthing resistance is no more than 1 ohm. Furthermore, it shall conduct
17、overall equipotential connection and the specific equipotential connection refers to 02D501-2 in page 11-15.八电力设计8.1 配电系统本工程全部为低压用电负荷,变电所低压配电室以放射供电方式向建筑物内配电柜、配电箱供电,再从各配电柜、配电箱引至各用电设备。照明负荷中的应急照明由灯具中蓄电池供电。VIII Electric Design8.1 Power Distribution SystemThis project is low voltage load completely. The
18、low voltage distribution room will supply power to all distribution cabinets and distribution boxes inside the building in the form of radiation, and then it is introduced to all power-consumed equipments from each distribution cabinets and distribution boxes. Emergency lighting for lighting load sh
19、all be supplied by storage batteries inside lighting fittings. 8.2 环境特征和设备选择及安装本工程建筑物内主要分为办公区、机械加工区、仓库区、餐厅及展示区,均为正常环境。各区域内电气设备的选择及安装方式满足使用场所的环境要求。8.2 Environmental Characteristics and Equipments Selection and InstallationThe building of this project can be mainly divided into office area, machinery
20、processing area, warehouse area, dining hall, and exhibition area, all of which are in normal environment. The selection and installation modes for electronic equipments of each area shall be in accordance with the environmental requirements of location occupied.48.3 导线、电缆选择及敷设方式本工程导线采用 BV-500V 穿钢管敷
21、设;电缆采用 YJV-1000V,照明和动力干线沿电揽桥架引至各配电柜、配电箱,照明、插座支线如无特殊标注一律选 BV-2.5 mm2导线,照明支线:管理区穿钢管暗敷于吊顶内,仓库区和生产区穿钢管沿楼板沿墙明敷。插座线路:管理区穿钢管暗敷于架空地板内。仓库区和生产区穿钢管沿楼板沿墙明敷。8.3 Selection and Arrangement Modes for Conductive lines and CablesConductive lines for this project all adopt BV-500V Line through steel pipes to pave. Cab
22、les adopt YJV-1000V. Main lines for lighting and dynamic force shall be stretch to each distribution cabinet and distribution box via the cable bracket. Except for special mark, any lighting and socket extensions shall adopt the conductive line of BV-2.5 mm2. Lighting extensions through the steel pi
23、pes inside the managerial area shall be concealed inside the suspended ceiling. Lighting extensions through the steel pipes inside the warehouse area and the producing area will be paved obviously along walls and floor slabs. Socket extensions through the steel pipes inside the managerial area shall
24、 be implicitly paved in aerial floors. Socket extensions through the steel pipes inside the warehouse area and the producing area will be paved obviously along walls and floor slabs.8.4本工程应用二次加热设备装于吊顶内,导线暗敷于吊顶内。8.5至屋顶设备配电柜内末级加隔离开关8.6所有用电设备 15KW 的,采用降压起动方式。8.4 This project shall adopt secondary heati
25、ng devices to be hanged on the suspended ceiling, and their conductive lines shall be concealed inside the suspended ceiling.8.5 Switches are added for separation at the extreme end inside the distribution cabinet on the riffing. 8.6 All equipments that utilize power shall be larger than 15KW, and s
26、hall adopt the reduced-voltage starting mode. 九照明系统及灯具正常照明由普通电源供电;应急照明由灯具内蓄电池供电。应急照明主要设置在各通道口、疏散楼梯及重要的操作岗位,应急照明的照度为正常照度的 5%,应急照明时间90min。正常照明灯具主要采用荧光灯,在仓库采用金属卤化物灯。所有照明灯具均采用手动控制。荧光灯及金属卤化物灯 COS=0.85。IX. Illuminating system and light fixturesNormal illumination is powered by the ordinary current resourc
27、e and the batteries inside the light fixtures power the emergent one. The emergent illuminations are mainly set on places such as each passage entrance, dispersal stairway, and some important executive posts. The emergent illumination intensity should be the 5% of the normal one and the time of it s
28、hould be90min. The light fixtures of the normal illumination are radically fluorescent lamps and there are metal halide lamps instead when in the stores. All the illumination light fixtures should be hand controlled. The COS of the fluorescent 5lamps and the metal halide lamps should be equal to 0.8
29、5.十电信10.1 主要设计标准:工业企业通信设计规范 (GBJ42-81)建筑与建筑群综合布线系统工程设计规范 (GB/T50311-2000)火灾自动报警系统设计规范 (GB50116-98)X Telecommunication10.1 Primary design standards:Telecommunication Design Standards for Industry Enterprises (GBJ42-81)Engineering Design Standards for Integrated Routing System of Architectures and Arc
30、hitectural Complexes (GB/T50311-2000)Design Standards for Conflagration Automatic Alarm System (GB50116-98)10.2 设计范围:本工程设计范围包括厂区总图界区内的电话系统;数据通讯系统;对讲系统;及火灾报警及联动系统。10.3 电话系统本项目需要 49 门电话,考虑今后电话机容量的扩充,一台 60 门的交换机 180对的配线架将安装在通讯设备室,中继线为双向传输方式,中继线引自界区东北角的市局电话电缆。交换机由交流 220V 供电,同时随机附带可维持 4 小时的蓄电池,交换机的接地端子与建
31、筑物的接地系统连接,接地电阻小于 1 欧姆。10.2 Design RangeThe design range of this engineering includes the telephone system, digital telecommunication system, interphone system, and conflagration automatic alarm and linked system inside the bound of the form in the general chart.10.3 Telephone SystemThis program need
32、s 49 telephones, and a 60-line exchanger when considering the future expand of the capacity of the telephone sets. A 180 pairs of distributing frames should be fixed in the telecommunication equipment room. The connecting line should be bi-directional transmitting and is led in from the cable of the
33、 telecommunication station on the north east of the form. The exchanger is powered with a 220V alternating current and is fixed with a battery to supply 4 hours emergent power. The earth end of the exchanger is connected with the earth system of the architectures and the electrical resistance should
34、 be less than 1 Ohm.10.4 综合布线系统综合布线系统由设在一层办公区电气室的主配线架、设在西区一层的分配线架、光缆及五类屏蔽电缆组成。主配线架与分配线架之间通过光缆连接。配线系统由 5 类线及电话、数据、电源组合插座组成,在办公室安装地面组合插座,所有配线:干线沿电缆线槽、支线穿金属软管暗敷于架空地板内。装卸区办公室数据、电话插座、电6源插座均暗装于墙体内,导线穿钢管暗敷于地面内及墙体内。10.5 紧急呼叫系统本系统由按钮、信号灯组成。在残疾人卫生间内安装一个报警按钮,按钮按下时,门外的报警灯点亮。10.4 Integrated routing systemThe int
35、egrated routing system consists the major distributing frame in the electric room on the first floor office area, and the sub distributing frames in the first floor of the western area, cables and five sorts of the screening cables. The major distributing frame connects the sub ones with cables. The
36、 distributing system is made up of 5 sorts of cables and the assemble sockets of telephone, digits and power. Install floor assemble sockets in the office rooms and the distributing cables. All the major distributing lines should go along the wire casings, and the sub ones should be hidden under the
37、 floor boards after passing through some metal soft pipes. All the digital and telephone and power sockets in the loading area should be hidden in the walls and the wires are hidden in the walls after passing through some metal soft pipes. 10.5 Emergent alarm systemThis system is consisted by button
38、s and signal lamps. Fix and alarming button on the resting rooms for disables. The alarming lamp will light up when he or she presses it.10.6 火灾报警系统火灾报警系统由火灾报警盘、火灾联动控制盘,火灾手动控制盘,探测器及手动报警按钮及消防电话系统组成。在以下区域安装自动报警装置:所有办公区、仓库、生产区、通道、通讯设备室等需要保护的区域。当有火灾信号时,消防联动系统能启动建筑物内的警笛,同时能够自动关闭防火卷帘门,同时能够启动消防泵和喷淋泵,切断非消防电
39、源。消防泵、喷淋泵亦可通过手动盘控制。所有配线穿钢管敷设。报警盘及控制盘供电采用 AC220V 并配有 4 小时的备用电池。火警盘的接地系统与建筑物的接地系统共用,接地电阻小于 1 欧姆。门卫安装一部直拨电话,当有火灾时,直接与附近消防局联系。10.6 Conflagration Alarm SystemThe conflagration alarm system consists conflagration alarm disk, conflagration linked control panel, conflagration hand control panel, detectors a
40、nd hand control alarm buttons and fire controlling telephone system.Fix auto alarm sets on these places: the needing protection places in all the office rooms, stores, producing areas, passages, telecommunication equipments rooms, and so on.At the time of the conflagration signal showing, the confla
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 书店创业计划书
- 八年级生物上册 5.5《病毒》教学实录1 (新版)新人教版
- 健康人生绿色无毒
- 浙教版2023小学信息技术四年级上册 第11课《有序的世界》教学设计及反思
- 小学防控疫情小知识课件
- 2017-2018学年北师大版七年级生物下册12.2 感受器和感觉器官教学设计. (3份打包)
- 2024秋七年级数学上册 第3章 代数式3.4 合并同类项 1合并同类项教学设计(新版)苏科版
- 儿童偷窃行为法制教育
- 2023九年级数学下册 第26章 概率初步26.2 等可能情形下的概率计算第2课时 用树状图或列表法求概率教学实录 (新版)沪科版
- 2025借款个人合同模板
- 【课件】第3课 象外之境-中国传统山水画 课件-2022-2023学年高中美术人教版(2019)美术鉴赏
- 英语沪教版小学五年级下册Unit6优质课课件1
- 误吸的护理应急预案
- 法制宣传教育小报
- 上海西郊国际农产品展示直销中心贵州馆入驻方案
- 小件物品寄存和随车托运登记表
- 手压式手电筒设计(棘轮机构及电路设计)
- 等离子体水处理技术
- 产品被预警、召回、索赔、退货及顾客投诉管理程序
- 危重孕产妇救治中心建设与管理指南
- 折纸大全A4纸可打印3D拼图(共36页)
评论
0/150
提交评论