一种特殊的预防电压波动的保护方案毕业设计外文翻译_第1页
一种特殊的预防电压波动的保护方案毕业设计外文翻译_第2页
一种特殊的预防电压波动的保护方案毕业设计外文翻译_第3页
一种特殊的预防电压波动的保护方案毕业设计外文翻译_第4页
一种特殊的预防电压波动的保护方案毕业设计外文翻译_第5页
已阅读5页,还剩10页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、原文: a special protection scheme for voltage stability preventiontara alzahawi student member, ieee mohindar s. sachdev life fellow, ieee g. ramakrishna member, ieeepower system research group university of saskatchewan saskatoon, sk s7n 5a9, canada abstract voltage instability is closely related to

2、the maximum load-ability of a transmission network. the energy flows on the transmission system depend on the network topology, generation and loads, and on the availability of sources that can generate reactive power. one of the methods used for this purpose is the voltage instability predictor (vi

3、p). this relay measures voltages at a substation bus and currents in the circuit connected to the bus. from these measurements, it estimates the thévenins equivalent of the network feeding the substation and the impedance of the load being supplied from the substation. this paper describes an e

4、xtension to the vip technique in which measurements from adjoining system buses and anticipated change of load are taken into consideration as well. keywords: maximum load ability; voltage instability; vip algorithm. 1. introduction deregulation has forced electric utilities to make better use of th

5、e available transmission facilities of their power system. this has resulted in increased power transfers, reduced transmission margins and diminished voltage security margins. to operate a power system with an adequate security margin, it is essential to estimate the maximum permissible loading of

6、the system using information about the current operation point. the maximum loading of a system is not a fixed quantity but depends on various factors, such as network topology, availability of reactive power reserves and their location etc. determining the maximum permissible loading, within the vo

7、ltage stability limit, has become a very important issue in power system operation and planning studies. the conventional p-v or v- q curves are usually used as a tool for assessing voltage stability and hence for finding the maximum loading at the verge of voltage collapse 1. these curves are gener

8、ated by running a large number of load flow cases using, conventional methods. while such procedures can be automated, they are time-consuming and do not readily provide information useful in gaining insight into the cause of stability problems 2. to overcome the above disadvantages several techniqu

9、es have been proposed in the literature, such as bifurication theory 3, energy method 4, eigen value method 5, multiple load flow solutions method 6 etc. reference 7 proposed a simple method, which does not require off-line simulation and training. the voltage indicator predictor (vip) method in 7 i

10、s based on local measurements (voltage and current) and produces an estimate of the strength / weakness of the transmission system connected to the bus, and compares it with the local demand. the closer the local demand is to the estimated transmission capacity, the more imminent is the voltage inst

11、ability. the main disadvantage of this method is in the estimation of the thévenins equivalent, which is obtained from two measurements at different times. for a more exact estimation, one requires two different load measurements. this paper proposes an algorithm to improve the robustness of th

12、e vip algorithm by including additional measurements from surrounding load buses and also taking into consideration local load changes at neighboring buses. 2. proposed methodology the vip algorithm proposed in this paper uses voltage and current measurements on the load buses and assumes that the i

13、mpedance of interconnecting lines (,) are known, as shown in (figure 1). the current flowing from the generator bus to the load bus is used to estimate thévenins equivalent for the system in that direction. similarly the current flowing from other load bus (figure 2) is used to estimate thé

14、;venins equivalent from other direction. this results in following equations (figure 3). note that the current coming from the second load bus over the transmission line was kept out of estimation in original (vip) algorithm. 1 2 3 4where and are currents coming from thévenin buses no.1 and 2.

15、equation (1)-(4) can be combined into a matrix form: *5using the first 2 rows in the system equations (1)-(4), the voltage on buses number 1 and 2 can be found as shown in equation (6) below. from equation (6) we can see that the voltage is a function of impedances. note that the method assumes that

16、 all thévenins parameters are constant at the time of estimation. 6where, and the system equivalent seen from bus no.1 is shown in figure 3. figure 4(a) shows the relationship between load admittances ( and ) and voltage at bus no.1. power delivered to bus no.1 is () and it is a function of (,)

17、. 7 equation 7 is plotted in figure 4 (b) as a landscape and the maximum loading point depends on where the system trajectory goes over the hill. fig. 1. 3-bus system connections fig. 2. 1-bus model fig. 3. system equivalent as seen by the proposed vip relay on bus #1 (2-bus model) (a)voltage profil

18、e (b) power profile fig. 4. voltage and power profiles for bus #1 2.1. on-line tracking of thévenins parameters thévenins parameters are the main factors that decide the maximum loading of the load bus and hence we can detect the voltage collapse. in figure3, can be expressed by the follow

19、ing equation: 8v and i are directly available from measurements at the local bus. equation (8) can be expressed in the matrix form as shown below. 9 b= a x 10the unknown parameters can be estimated from the following equation: 11 note that all of the above quantities are functions of time and are ca

20、lculated on a sliding window of discrete data samples of finite, preferably short length. there are additional requirements to make the estimation feasible: there must be a significant change in load impedance in the data window of at least two set of measurements. for small changes in thévenin

21、s parameters within a particular data window, the algorithm can estimate properly but if a sudden large change occurs then the process of estimation is postponed until the next data window comes in. the monitoring device based on the above principle can be used to impose a limit on the loading at ea

22、ch bus, and sheds load when the limit is exceeded. it can also be used to enhance existing voltage controllers. coordinated control can also be obtained if communication is available. once we have the time sequence of voltage and current we can estimate unknowns by using parameter estimation algorit

23、hms, such as ka lm an filtering approach described 6.stability margin (vsm) due to impedances can be expressed as (); where subscript z denotes the impedance.therefore we have: 12 the above equation assumes that both load impedances (, ) are decreasing at a steady rate, so the power delivered to bus

24、 1 will increase according to equation (7). however once it reaches the point of collapse power starts to decrease again.now assume that both loads are functions of time. the maximum critical loading point is then given by equation(13): 13expressing voltage stability margin due to load apparent powe

25、r as ( ), we have: 14note that both and are normalized quantities and their values decrease as the load increases. at the voltage collapse point, both the margins reduce to zero and the corresponding load is considered as the maximum permissible loading. fig. 5. vip algorithm2.2. voltage stability m

26、argins and the maximum permissible loading system reaches the maximum load point when the condition: is satisfied (figure5).therefore the voltage stability boundary can be defined by a circle with a radius of the thévenins impedance. for normal operation the is smaller than (i.e. it is outside

27、the circle) and the system operates on the upper part (or the stable region) of a conventional p-v curve 2. however, when exceedsthe system operates on the lower part (or unstable region) of the p-v curve, indicating that voltage collapse has already occurred. at the maximum power point, the load im

28、pedance becomes same as the thévenins (). therefore, for a given load impedance (), the difference between and can be considered as a safety margin. hence the voltage as given in an ieee survey, which described (111) schemes from (17) different countries 8. fig. 6. load actions to prevent from

29、voltage instability2.3. advantages of the proposed vip algorithmby incorporating the measurements from other load buses (figure 3), the proposed vip algorithm achieves a more accurate value of . the on-line tracking of is used to track system changes. the proposed improvements in the vip algorithm w

30、ill result in better control action for power system voltage stability enhancement. the control measures are normally shunt reactor disconnection, shunt capacitor connection, shunt var compensation by means of svcs and synchrouns condensers, starting of gas turbines, low priority load disconnection,

31、 and shedding of low-priority load 8. figure 6 shows the most commonly used remedial actions .3. conclusions an improved voltage instability predictor (vip) algorithm for improving the voltage stability is proposed in this paper. the previous vip method 7 used measurements only from the bus where th

32、e relay is connected. the new method uses measurements from other load buses as well. the voltage instability margin not only depends on the present state of the system but also on future changes. therefore, the proposed algorithm uses an on-line tracking thévenins equivalent for tracking the s

33、ystem trajectory. the algorithm is simple and easy to implement in a numerical relay. the information obtained by the relay can be used for load shedding activation at the bus or var compensation. in addition, the signal may be transmitted to the control centre,where coordinated system-wide control

34、action can be undertaken. the algorithm is currently being investigated on an ieee 30 bus system and results using the improved vip algorithm will be reported in a future publication. references 1 m.h.haque, “on line monitoring of maximum permissible loading of a power system within voltage stabilit

35、y limits”, iee proc. gener. transms. distrib.,vol. 150, no. 1, pp. 107-112, january, 2003 2 v. balamourougan, t.s. sidhu and m.s. sachdev, “technique for online prediction of voltage collapse”, iee proc.gener.transm. distrib., vol.151, no. 4, pp. 453-460, july, 2004 3 c.a. anizares, “on bifurcations

36、 voltage collapse and load modeling “ieee trans. power system, vol. 10, no. 1, pp. 512-522, february, 1995 4 t.j overbye and s.j demarco, “improved technique for power system voltage stability assessment using energy methods“, ieee trans. power syst., vol. 6, no. 4, pp. 1446-1452, november, 1991 5 p

37、.a smed loof. t. andersson, g. hill and d.j,”fast calculation of voltage stability index”, ieee trans. power syst. vol. 7, no. 1, pp. 54-64, february, 1992 6 k. ohtsuka ,” an equivalent of multi- machine power system and its identification for on-line application to decentralized stabilizers”, ieee

38、trans. power syst., vol. 4 no. 2, pp. 687-693, may, 1989 7 khoi vu, miroslav m begovic, damir novosel, murari mohan saha, “ use of local measurements to estimate voltage stability margin “ ieee trans. power syst. vol. 14, no. 3, pp. 1029-1035, august, 1999 8 g.verbic and f. gubina “fast voltage-coll

39、apse line protection algorithm based on local phasors”, iee proc.gener.transm. distrib., vol. 150, no. 4, pp. 482-486, july, 2003 译文:一种特殊的预防电压波动的保护方案塔拉阿里扎哈维 学生会员,ieee 摩亨达瑞s.萨凯戴维 院士,ieee g.罗摩克里希纳 会员,ieee (ieee:美国电气和电子工程师协会)萨斯喀彻温省萨斯卡通大学的电力系统研究小组,sk s7n 5a9,加拿大摘要电压的波动与输电线路的最大负载能力密切相关。输电系统中电能的传输依赖于输电线路的

40、拓扑结构,发电和负载,以及无功电源的出处。一种用于分析电压波动的方法是电压波动的预测(vip)。由继电器测量变电所连接到线路上的电路的电流和电压。根据测量结果,借助戴维南定理估算出输送到变电所线路和从变电所提供的负载的阻抗。本文描述了一个测量相邻系统母线并考虑到的负荷预期变化的扩展的vip技术。关键词:最大负载能力;电压波动;vip算法。1.简介宽松的政策迫使发电企业要更好地利用电力系统中的输电。这导致了输电量的增加,降低了输电利润和减小了电压安全裕度。操作一个有足够安全裕度的电力系统,在系统的使用信息中估算当前操作点的最大允许负载是必要的。一个电力系统的最大负载不是一个固定的值而是取决于各种

41、各样的因素,比如输电线路的拓扑、无功电源的出处和他们的位置等等。决定最大允许负载,在电压稳定极限内,在电力系统运行和规划研究中已成为一个非常重要的问题。常见的p-v或v-q曲线通常当作一个评估电压稳定的依据,进而为在电力系统电压崩溃端寻找最大负载提供依据1。这些曲线常规的方法是在大量负载流运行使用的情况下产生的。虽然这样的过程已经可以自动化,但它们是耗时的,在发现稳定性问题的起因时不易提供一些有用的信息2。为了克服上述缺点的多个方法已经在文献上提到,比如分叉理论3,能量法4、本征值法5,多个负载流解法6等。参考7提出了一个简单的方法,它不需要离线的模拟和训练。电压指标预测方法(vip)7是在本

42、地测量值(电压和电流)的基础上,产生一个连接到母线上估算优点和缺点的输电系统,并将它与当地的需求对比。估算出最接近本地需求的输电量,更为紧迫的是电压波动。该方法的主要缺点是在戴维南定理的估算,它在不同时刻获得两个测量值。对于一个更精确的估值,一般需要两个不同的负荷测量值。本文提出了一种提高稳定性算法的算法,包括周围负载母线的额外的测量值外也考虑到相邻总线之间局部的负载变化。2.提出的方法vip算法在本文中提到在负载母线和互连线( ,)的假设阻抗在已知的情况下使用电压和电流测量 ,如下所示(图1)。发电机负载母线的电流被用来估计戴维南等效的输电方向。类似于用从其他负载母线(图2)的电流来估计戴维

43、南等效的其他方向。这个结果在以下方程式(图3)。注意在输电线路上来自第二负载母线的电流被排除在最初的估算(vip)算法。 1 2 3 4由戴维南定理得来自第一和第二母线的电流和。方程(1)-(4)可以组合为一个矩阵形式: *5使用第一行系统方程(1)-(4)中的2,在母线1和2上的电压可以发现如以下方程式(6)所示。从方程式(6)中我们可以看到,电压是一个阻抗的函数。请注意这个方法是假定所有戴维南的参数是常数时的估算。 6 在 和 中系统等效理解为母线1如图3所示。图4(a)显示了负载通道(y1和y2) 和母线1电压之间的关系。电力输送到母线1是(),它是一个(,).的函数。 7 方程式7如图

44、4(b)“形象化”绘制并且最大负载点取决于系统轨迹”超过顶点”。 图1.3母线系统连接 图2.1母线模型图3.系统等效为被提议的vip转接到母线#1(母线#2模型)(a)电压分布图 (b)功率分布图图4.母线# 1的电压和功率分布图2.1. 即时跟踪戴维南的参数戴维南的参数是决定负载母线最大负载的的主要因素,因此我们可以检测输电系统电压崩溃。在图3,可以用以下的方程式表示: 8电压和电流可以从测量本地母线直接得到。方程式(8)可以用矩阵形式表达,如下所示。 9 b= a x 10 未知参数可以从以下方程式的估算: 11 注意,上述所有数量的计算是函数的时间和在滑动窗口的有限的离散数据样本之内计

45、算,最好长度是短的。在额外的需求下做出可行的估算:必须有一个显著的变化,负载阻抗数据窗口至少两组测量值。对于戴维南参数在一个特殊的数据窗口小的变化,该算法可以正确地估算除一个突然大的变化以外,估算的过程推迟到下一个数据窗口的到来。这种监视装置基于上述原理可以用来强加限制装载在每个母线,和流负载超过限制时。它也可以用来加强现有的电压控制器。协调控制同样可以得到在交流是否空闲的情况下。一旦我们有了时间序列的电压和电流,我们可以通过使用参数估算算法估算未知参数,如卡尔曼滤波方法描述6。稳定裕度() 由于阻抗可以表示为();在下标z表示阻抗。因此我们有: 12上述方程式假设两个负载阻抗(, )是在一个稳定的速度下减少,所以电力送到母线1将根据方程(7)增加。然而一旦它达到饱和点的时候电力再一次开始减少。现在,假设两个负载是时间的函数。最大的临界负载点方程式(13)给出: 13 电压稳定裕度表示由于负载视在功率为( ),我们有: 14注意,和两个都是标准化的定量和随着负载的增加它们的价值减少。在电力系统电压崩溃点,同时两个裕度减少到零和相应的负载被视为最大允许负载。图5.vip算法2.2. 电压稳定裕度和最大允许加载系统达到最大

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论