客房缺陷Sample room checklist with photosSeptember_第1页
客房缺陷Sample room checklist with photosSeptember_第2页
客房缺陷Sample room checklist with photosSeptember_第3页
客房缺陷Sample room checklist with photosSeptember_第4页
客房缺陷Sample room checklist with photosSeptember_第5页
已阅读5页,还剩8页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、CHECK LISTDate:Checked By:Villa EntryOPSProjectItemsRemarksDate Inspected:Inspected By:Date Inspected:Inspected By:All excess paint to be removed from access walkway.Remove all excess paint overspray on wall from bamboo screen treatment at entry doorway.No ground/earth wire provided to light fitting

2、.Exposed cabling, need to cover by installing wires in conduit and paint to match wall finish color.Entry door does not keep rain water out, floor very slippery when water inside and door rattles in wind at night and is disturbing.To provide a weather strip on bottom of door and a seal to be applied

3、 to the door frame to prohibit 'rattling' in wind.CHECK LISTDate:Checked By:Mechanical RoomOPSProjectItemsRemarksDateChecked By:DateChecked By:Aircon unit not installed properly, it is at an angle across the plant room and therefore air flow across the coils is not as good as it should be, a

4、dditionally the hot exhaust air is re-circulated inside the room and decreases efficiency of the unit.No cover on MATV junction box, individual circuits are not labeled either at the terminal box or inside the guest room wall plates for ease of identification.Exposed wiring and terminations to be re

5、placed and all terminations made in approved junction boxes.Electrical switch board circuits not labeled and no safety cover plate with circuit breakers identified.Voice and Data cabling not installed properly (blue cable).Hot and Cold water supply isolation valves not labeled.Air-conditioning scree

6、n not installed properly.CHECK LISTDate:Checked By:Room Inside/ Main Living RoomOPSProjectItemsRemarksDateChecked By:DateChecked By:Paint marked and stained on the wall beside TV.Water damage around window beside TV, suspect poorly installed window frame - to be inspected and addressed.TV cabinet da

7、mage.Mini bar not installed with good ventilation and unit operating very hot which will reduce service life of unit prematurely. Recommend to cut second slot for natural air circulation.Safety box to be secured by bolting down onto the drawer unit in the wardrobe.CHECK LISTDate:Checked By:BathroomO

8、PSProjectItemsRemarksDateChecked By:DateChecked By:Hand basin water leak.Bathroom and toilet entry doors - handles are corroding badly and finish is unacceptable. Recommend to replace all bathroom hardware fittings with better quality.Bathroom shower and toilet doors are of low quality finish, lamin

9、ate imitation wood veneer surfacing coming off doors Recommend doors are replaced with solid wood.Drain not connected properly.Note: Water pressure modulating, its not constant and needs to be addressed through the plant room domestic cold and hot water system checks.Bathroom tub drain not connected

10、 properly. Bathtub moving on floor inside bathroom and in most cases the drain connection is 'proud' of the floor so the tub floor is not flat and water 'ponds'.CHECK LISTDate:Checked By:Bathroom window - exterior screeningOPSProjectItemsRemarksDateChecked By:DateChecked By:External

11、window frame needs to be cleaned of over paint finish and properly painted.Excess wire noted on many exterior bathroom structures from construction, these need to be removed and the structures painted to a clean finish.CHECK LISTDate:Checked By:Ceiling space above bedOPSProjectItemsRemarksDateChecke

12、d By:DateChecked By:Coadunate drain line and drip tray not installed properly. If the condensate drain is not installed with a 'fall' from the catchment tray down to the main drain line then water will 'flood' the tray causing serious ceiling damage over time.Recommend that the trays

13、 and drains are tested during snagging by filling trays artificially with a water form a jug to ensure trays can drain before handover completed.CHECK LISTDate:Checked By:Deck AreaOPSProjectItemsRemarksDateChecked By:DateChecked By:Composite wood finish surrounding the Jacuzzi is not finished safely

14、.Recommend to change material for timber decking.Back terrace exterior light fitting rusting, cables exposed and to be installed inside conduit painted color as the wall finishes.External lights fitting crowded.Feature light no access to replace bulb, contractor provide method statement.Jacuzzi parts missing like headrests and overflow covers - these need to be replaced by contractor before handover.CHECK LISTDate:Checked By:Air condition

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论