版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Transparency Masters to accompany Operations Management, 5E (Heizer & Render)14-1?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Transparency Masters to accompany Operations Management, 5E (Heizer & Render)14-2?1998 by Prentice Hall, Inc.A Simon & Schuster Company
2、Upper Saddle River, N.J. 07458Global Company Profile: Collins IndustriesDependent Inventory Model RequirementsMaster Production ScheduleBills of MaterialsAccurate Inventory recordsPurchase Orders OutstandingLead Times for Each ComponentMRP StructureTransparency Masters to accompany Operations Manage
3、ment, 5E (Heizer & Render)14-3?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458MRP ManagementMRP DynamicsMRP and JITLot-Sizing TechniquesExtensions in MRPClosed-Loop MRPCapacity PlanningMaterial requirements Planning II (MRP II)Enterprise Resource Planning (ERP)Tra
4、nsparency Masters to accompany Operations Management, 5E (Heizer & Render)14-4?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458MRP In ServicesDistribution Resource Planning (DRP)DRP StructureAllocationTransparency Masters to accompany Operations Management, 5E (Hei
5、zer & Render)14-5?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Distinguish dependent from independent demand inventoryDefine material requirements planningExplain the benefits of MRPIdentify the requirements of MRP, DRP, and ERPExplain the inputs & outputs of MR
6、PCompute order releasesTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-6?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Largest manufacturer of ambulances in the worldInternational competitor12 major ambulance designs18,000 differen
7、t inventory items6,000 manufactured parts12,000 purchased partsMRP: IBM抯 MAPICS Transparency Masters to accompany Operations Management, 5E (Heizer & Render)14-7?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Collins requires:Material plan must meet both the requi
8、rements of the master schedule and the capabilities of the production facilityPlan must be executed as designedEffective 搕ime-phased?deliveries, consignments, and constant review of purchase methodsMaintenance of record integrityTransparency Masters to accompany Operations Management, 5E (Heizer & R
9、ender)14-8?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458InventoryProcess stageDemand TypeNumber & ValueOtherRaw Material WIP Finished GoodsIndependent DependentA Items B Items C ItemsMaintenance Dependent OperatingTransparency Masters to accompany Operations Man
10、agement, 5E (Heizer & Render)14-9?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458ItemMaterials WithIndependent DemandMaterials WithDependent DemandDemandSourceCompany CustomersParent ItemsMaterialTypeFinished GoodsWIP & Raw MaterialsMethod ofEstimatingDemandForeca
11、st & BookedCustomer OrdersCalculatedPlanningMethodEOQ & ROPMRPTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-10?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458ProductionPlanMarketingCustomerDemandEngineeringDesignCompletionManageme
12、ntReturn onInvestmentCapitalHumanResourcesManpowerPlanningProcurementSupplierPerformanceFinanceCash FlowProductionCapacityInventoryTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-11?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458 Ef
13、fective use of dependent demand inventory models requires that the operations manager know the:master production schedulespecifications or bills-of-materialinventory availabilitypurchase orders outstandinglead timesTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-12?19
14、98 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Production PlanExecute MaterialPlansMaster ProductionScheduleMaterialRequirementsPlanCapacityRequirementsPlanExecute CapacityPlansRealistic?NoYesTransparency Masters to accompany Operations Management, 5E (Heizer & Rend
15、er)14-13?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458A customer order in a job shop (processfocused/make to order) companyModules in a repetitive (assemble-to-stock) companyAn end item in a continuous (productfocused/make to stock) companyTransparency Masters t
16、o accompany Operations Management, 5E (Heizer & Render)14-14?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458List of components & quantities needed to make product Provides product structure (tree)Parents: Items above given levelChildren: Items below given levelSho
17、ws low-level codingLowest level in structure item occursTop level is 0; next level is 1 etc.Transparency Masters to accompany Operations Management, 5E (Heizer & Render)14-15?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Modular billsModules are final components
18、used to make assemble-to-stock end itemsPlanning billsUsed to assign artificial parentReduces number of items scheduledPhantom billsUsed for subassemblies that exist temporarilyTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-16?1998 by Prentice Hall, Inc.A Simon & Sch
19、uster CompanyUpper Saddle River, N.J. 07458Bicycle(1)P/N 1000Handle Bars (1)P/N 1001Frame Assy (1)P/N 1002Wheels (2)P/N 1003Frame (1)P/N 1004Transparency Masters to accompany Operations Management, 5E (Heizer & Render)14-17?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J
20、. 0745812345678DGFECEDBA2 weeks1 week3 weeks2 weeks1 week1 week2 weeks1 week2 weeks to produceStart production of DMust have D and E completed here so production can begin on BTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-18?1998 by Prentice Hall, Inc.A Simon & Schu
21、ster CompanyUpper Saddle River, N.J. 0745812345Gross Requirements2202515Scheduled Receipts530Available252333338Net Requirements7Planned Order Receipts7Planned Order Releases7Manufacturing computer information system Determines quantity & timing of dependent demand items?1995 Corel Corp.Transparency
22、Masters to accompany Operations Management, 5E (Heizer & Render)14-19?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Computer systemMainly discrete productsAccurate bill-of-materialAccurate inventory status99% inventory accuracyStable lead times?1984-1994 T/Maker
23、Co.Transparency Masters to accompany Operations Management, 5E (Heizer & Render)14-20?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Increased customer satisfaction due to meeting delivery schedules Faster response to market changesImproved labor & equipment utili
24、zationBetter inventory planning & schedulingReduced inventory levels without reduced customer serviceTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-21?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458MRP by period reportMRP by date r
25、eportPlanned orders reportPurchase requirementsException reportsMRPProgramsMaster ProductionScheduleBOMLead Times(Item Master File)(Bill-of-Material)Inventory DataPurchasing dataTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-22?1998 by Prentice Hall, Inc.A Simon & Sc
26、huster CompanyUpper Saddle River, N.J. 07458Forecast &Firm OrdersMaterialRequirementsPlanningAggregateProductionPlanningResourceAvailabilityMasterProductionSchedulingShopFloorSchedulesCapacityRequirementsPlanningRealistic?Transparency Masters to accompany Operations Management, 5E (Heizer & Render)1
27、4-23?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458MasterProductionScheduleBill ofMaterialsMaterialRequirementsPlanning SystemInventoryStatusPlanned Order& OtherReportsItem MasterPurchasingDataTransparency Masters to accompany Operations Management, 5E (Heizer &
28、Render)14-24?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Shows items to be producedEnd item, customer order, moduleDerived from aggregate planTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-25?1998 by Prentice Hall, Inc.A Simon &
29、 Schuster CompanyUpper Saddle River, N.J. 07458Item/WeekOct 3Oct 10Oct 17Oct 24Drills300200310300Saws300450310330Shows items to be producedEnd item, customer order, moduleDerived from aggregate planExampleTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-26?1998 by Pren
30、tice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Supports 搑eplanningProblem with ststem 搉ervousness揟ime fence?- allows a segment of the master schedule to be designated as 搉ot to be rescheduled揚egging?- tracing upward in the bill-of-materials from the component to the parent it
31、emManager can react to changes, doesn抰 mean he/she shouldTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-27?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458MRP - a planning and scheduling technique with fixed lead timesJIT - a way to
32、 move material expeditiouslyIntegrating the two:Small bucket approach and back flushingbalanced flow approachTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-28?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Lot-for-lotEconomic Order
33、 QuantityPart Period BalancingWagner-Whitin AlgorithmTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-29?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Closed loop MRPCapacity planning - load reportsMRP II - Material Resource Plannin
34、gEnterprise Resource PlanningTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-30?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Dispatch ListIsspecific capacityadequate?Isaverage capacityadequate?MaterialRequirements(detailed)Capacit
35、yRequirements(detailed)Input/OutputDesired MasterProductionScheduleRealistic?Priority ControlCapacity PlanningPriority PlanningCapacity ControlResourcePlanningFirst CutCapacityProduction PlanNoNoNoYesYesTransparency Masters to accompany Operations Management, 5E (Heizer & Render)14-31?1998 by Prentice Hall, Inc.A Simon & Schuster CompanyUpper Saddle River, N.J. 07458Tactics for smoothing the load and minimizing the impact of changed lead time include:Overlapping - reduces the lead time, entails sending pieces
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 学校体育教研室计划
- 中学安全工作计划范文
- 2025年行政人事部年度工作计划目标
- 2025年教师个人提高工作计划范文
- 地产公司专题计划代理部组织管理新规制度
- 2025年集采工作计划
- “访民情、惠民生、聚民心”活动对口帮扶计划
- 《血液科护理查房》课件
- 《fxhx络合滴定法》课件
- 跳绳合同书家庭
- Unit+6+Lesson+1+A+Medical+Pioneer+课件【 核心知识备课精研精讲】 高中英语北师大版(2019)必修第二册
- 幼儿园大班春季周计划表(整学期)
- 零基础的住宅和城市设计知到章节答案智慧树2023年同济大学
- 《走遍法国》Reflets课文
- 土地增值税清算管理规程
- 大学生心理健康教育-大学生心理健康导论
- 糖尿病病人的麻醉
- GB/T 29309-2012电工电子产品加速应力试验规程高加速寿命试验导则
- GB 29216-2012食品安全国家标准食品添加剂丙二醇
- 柔弱的人课文课件
- 动物寄生虫病学课件
评论
0/150
提交评论