1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia

2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements

3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the

4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi

5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli

6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar

7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc

8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated

9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc

10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen

11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a

12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and

13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and

14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5

15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu

16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge

17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester

18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.

19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing

20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high

21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab

22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted

23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .施工组织设计编制单位: xxx目录第一章 编制依据1第二章 工程概况2第三章 工程目标的确定3第四章 施工准备5第五章 主要施工方法及技术措施

24、、8第七章 安全保障措施26第八章 文明施工保证措施33第九章 工期保证措施364.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file asked to provide appropriate docu

25、mentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactly the same. 4.4 application ther

26、e shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents service charges (meter prices 200

27、21980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be floating up and down-floating rang

28、e must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of price, bid and the bid amount deter

29、mines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Development Planning Commission of t

30、he interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 2

31、0021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender bid amount as a base for a sepa

32、rate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 2003857). Sale of prequalification

33、documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in the 5th chapter of the format.

34、Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required supporting documents, bidding agency a

35、cknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .第一章 编制依据1.1 招标文件;1.2工程施工设计图纸;1.3有关施工规范及验收标准:1)给水排水管道工程施工及验收规范GB50268-972)建筑给水排水及采暖工程施工质量验收规范GB50242-20023)工业金属管道工程施工及验收规范GB

36、50235-974)工业设备及管道绝热工程施工及验收规范GBJ126-895)建筑工程施工质量验收统一标准GB50300-20016)工程测量规范GB50026-937)建筑机械使用安全技术规范JGJ33-868)建筑施工安全检查标准JGJ 59-999)砌体工程施工质量验收规范GB50203-200210) ISO14001环境管理体系 11)ISO18001职业安全健康管理体系12)现场设备、工业管道焊接工程施工及验收规范5CJJ28-2004第二章 工程概况本工程为*市明珠二期工程室外给排水工程,项目位于*市西山路西侧,该地区冻土深度为2.8米,地质条件为粉土、粉细砂、中砂。1. 给水管

37、道:1.1. 给水管道接自市政环状给水管网,采用高密度聚乙烯塑料管(HDPE),压力为1.0MPa。1.2. 给水管道采用热熔接口,砂砾基础,埋深为设计地面下3.0米。1.3. 阀门井采用地面操作立式阀门井,所用阀门均采用碟阀,压力为1.6MPa。2 排水管道:1.1. 排水管道采用硬聚氯乙烯(PVC-U)和聚乙烯(HDPE)双壁波纹塑料管两种,分别用于排水出户和排水分支管路及主管路。1.2. 排水管道聚乙烯HDPE排水管要求钢环大于等于8kn/。1.3. 排水管硬聚氯乙烯(PVC-U)管采用胶接接口,聚乙烯(HDPE)排水管采用承插橡胶圈接口。1.4. 化粪池选用的是玻璃钢成品,按最高日用水

38、定额300L/d.人,每个化粪池按755人计,90天清淘一次,选用化粪池有效容积25m3。1.5. 排水管道埋深不小于2米,坡度与道路坡度一至。3 消防管道1.1. 消防管道与生活给水管道共用,其水源接自市政环状给水管网。1.2. 消防管道用水量为15L/s,该设计在消火栓保护半径150米范围内设二个消火栓,消火栓有两个出水口,分别为DN100和DN65,每个消火栓前设有防污染倒流防止器。第三章 工程目标的确定本施工组织设计的编制以我公司现有的施工技术力量为基点,针对本工程的特点,并结合我公司类似工程的施工经验,本着实事求是的科学态度和忠实服务业主的宗旨进行的。如能中标,我公司将于中标后的7天

39、之内,在本投标书的基础上,按照施工图补充、完善各分项工程施工中的细节问题,形成实施性的施工组织设计,确保业主满意。一、 总体设想1.1. 本公司将采用科学的技术管理和施工方法,作出优质的工程,同时也更高树立本公司的形象。1.2. 通过本工程的施工,要达到两个目的,这就是:通过施工实践,锻炼、培养出一支高水平的管理队伍和施工队伍;总结提高施工经验,为今后建筑施工树立样板。1.3. 为达到上述两个目的,我公司拿出最好的管理人员、技术和施工队伍,紧密配合,统一计划协调、管理,统一组织指挥,在项目部的领导下,协作配合,共同完成这一任务。1.4. 由于道路分段、交叉口众多,场地条件较差,因此在工程施工中

40、必须严密策划,工序之间衔接、各工种之间的交叉作业必须经周密的布置,以保证工程能按时完工。二、 管理目标设想2.1. 质量目标:分项工程一次验收合格率100%,杜绝质量事故的发生。2.2. 安全生产目标:树立“安全生产、预防为主”的观念,在施工生产中全员、全天候、全过程实现安全设计和措施,控制劳动者、劳动手段、劳动对象和劳动环境,使人的行为安全,物的状态安全,断绝环境危险源,实现安全生产目标。 加强安全管理,不发生安全事故,消除一切事故隐患。2.3. 工期目标:计划安排60天完成。中标后,我公司通过加大投入、加强管理,派精干的队伍、精良的设备进场,确保按照业主要求的时间高标准完成施工任务。 2.

41、4. 环境保护目标:认真执行“当地环保的有关条例”保护现场环境的优美、卫生、清洁干净2.5. 文明施工目标:严格按环保法、水保法和建设工程施工现场管理办法等有关规定施工,注意扬尘、汽车尾气、噪音、污水、碴土等环境综合治理。采取责任承担法科学组织管理,使场容场貌、料具堆放、消防保卫、环境保护及职工生活等均符合规定要求,争创市级文明工地。第四章 施工准备一、 施工管理1 为了对本合同段项目进行卓有成效的施工组织管理,我公司拟成立精干、高效、运转自如的项目经理部。在项目经理部除项目经理、项目技术负责人外,职能部门有:工程技术部人员2人、质检部人员2人、试验室人员2人,财务部人员1人、设备部物资部人员

42、1人、办公室人员1人以及一支具有丰富的施工经验的施工队伍。2 各部门之间分工明确,其负责人对其部门所承担的职能有控制权,并有权与现场人员直接接触,减少项目经理的工作量,使项目经理能避免过多的日常工作,并为其提供一个训练有素的技术组织。技术负责人分管不同的部门的负责人,他们对项目经理负责,使信息能得到及时处理和传递,从而保证决策一致、及时和准确。3 本着加快工程进度,保证顺利实施,充分利用能够施工的工作面,我们采取二大措施:第一,整体工程分阶段,明确分期目标;第二,在平面上分区施工。施工程序组织原则为先清理后挖填,先地下后地上,先深后浅,先主体后附属,实行平面分段,立体交叉,多专业平行同步流水的

43、施工方法。二、 施工部署1 布署依据和原则1.1. 本工程的施工特点1.2. 以往施工经验、现场了解的情况1.3. 有关工程施工技术规范1.4. 在满足施工条件下,尽可能减少施工占道。1.5. 有利于施工和现场管理,做到经济、实用、合理。1.6. 与附近建筑物结合考虑,尽量不影响环境和地方交通。2 施工现场总平面布署2.1. 在建设方划定的围蔽范围内进行布置,生活区利用建设方划定位置建设在工地旁,生活区单独布置。2.2. 为保证文明施工和管理,现场进行封闭管理。2.3. 在保证施工顺利进行的前提下,现场布置尽量紧凑,合理利用施工用地,尽量减少或避免材料二次水平搬运,降低损耗和费用。2.4. 合

44、理减少临时设施的数量,减低临时设施费用,减少拆迁量。2.5. 符合环保、安全和防火要求。3.1. 施工临时用水、用电部署3.1. 临时用水:利用施工现场已经完成的临时供水管网。3.2. 临时用电:临时用电利用甲方已经架设的用电线路,施工中配置临时配电箱。 所有机械设备的用电使用一机一闸,并经过可靠接地。4 临时施工道路布署:借用小区现有道路作为施工通道。5 管道堆放场和临时堆土场布署:管道采用分批按安装计划进行安装,临时堆放沿管线两侧布置堆放。土料临时堆放场:道路工程做到挖填结合,临时堆放在附近空地上,沟槽开挖沿沟槽两边堆放,管道安装好后马上回填。6 施工人力资源部署 根据工程需要,成立一个专

45、门的项目部,由项目经理牵头组成一支强有力的项目部,在正式开工前做好如下工作:6.1. 劳动组织准备 (1)建立一个具有丰富施工经验、开拓精神强、工作效率高的施工组织机构,以更好更快的完成本工程。 (2)根据施工需要,必须集结精干的施工力量,合理进行劳动组织,相应的专业队和精干的施工队施工。6.2. 技术准备 组成工程技术室详细阅读图纸,请有关单位派人员现场监护指导施工。并及时与设计单位解决发现的问题,认真做好同甲方设计单位的交接工作,认真做好各道工序的技术交底工作,负责将交底做明了的解释,以确保施工班组能按设计施工。6.3. 总体安排在不影响建设方正常生产和生活的前提下,整个外网工程将分区、分

46、段进行,每完成一段后及时进行打压试验、合格后及时进行管道冲洗,并立即按规定对沟槽进行回填,恢复路面、便道,平整土地。第五章 主要施工方法及技术措施、一、 施工工艺流程 测量放线 设置围栏、安全警示标志等 开挖管沟验收沟槽验收管材、管件符合性验收沟槽底和管中心线、水准点 管道安装 稳管夯填土 验核管道安装各数据准确性 管顶500以上回填 井室砌筑 管段打压试验 管沟全部回填 管道冲洗、消毒。二、 测量放线开工前由建设方组织有关部门交桩、交线,提供控制点。根据建设方提供的桩点位置及测量控制点,每100米引测一临时水准点,水准点需经闭合后方可使用。建设方提供的桩点,施工现场测量人员应作好栓桩、护桩工

47、作;临时水准点应设在附近建筑物上或牢固的桩上。 根据建设方提供的管道中心桩进行测量放线,管道中心线及占地边线应同时放出,管道中心线应打百米桩,并注明相应的桩号、高程及角度等,所有桩点均应栓桩,并做好纪录,以便在丢失、破坏时顺利准确补测恢复。测量人员必须履行复合制度,同时做好原始纪录,测量完成后及时请监理工程师验桩、验线,合格并签字后方可进行下一步工序。 在线路与地下障碍物交叉处做出标记,标记里程、障碍埋深、尺寸等。管道放线以施工平面图中标注的尺寸为依据,施工中严格控制管道中心线、各部位高程。施工测量的允许偏差见下表规定:施工测量允许偏差 表3项目允许偏差水准测量高程闭合差20L mm导线测量相

48、对闭合差1/3000直线丈量测距两次校差1/5000注:L为水准测量闭合路线的长度(km) 三、 管道沟槽施工 根据技术规范对现场的施工准备、拆除、清理、管沟开挖与回填等方面的要求:3.1. 土方施工开工:在现场开始任何土方施工前,我们提前2天将开工日期通知项目监理,并记录现场该地点的原地面的高程和地形,满足项目监理的要求。沟槽开挖时,主要靠机械开挖,局部狭窄地段可采用小型挖土机械开挖,部分路段采用人工开挖。3.2. 原地面高程测量:向项目监理提交一份现场原地面高程的测量图纸副本,该图纸经项目监理的同意并签字,并将用于工程测量。现场任何部分的土方工程都须收到项目监理发出的书面批准才能开始。3.

49、3. 沟槽开挖尺寸与标高管线沟槽开挖前应按给水排水管道工程施工及验收规范(GB5026897)中的有关施工测量的规定进行管线测量放线,设置控制桩点及水准桩点,施工放线经项目监理验证,桩点位置应便于管线各区段施工时对管线轴线及标高的引测和控制。在每段工程开始之前设立标桩,以便在施工前和以后控制管道的轴线和标高。整个工程的沟槽标高应按图纸实施,沟槽开挖尺寸应根据地质情况以及设计图纸为准,或按项目监理审定的标高和尺寸施工。沟槽开挖尺寸:沟槽开挖的尺寸应保证所敷设的管道与侧面、底部的净空能满足管道下垫层以及管道周围回填所需的最小尺寸。本工程各管段沟槽开挖底宽按下式计算:BD12(b1+b2)式中B管道

50、沟槽底部开挖宽度(mm)D1管道结构的外缘宽度(mm)b1管道一侧的工作面宽度(mm)b2管道一侧的支撑厚度一般取150200mm本工程D1500,b1取300;沟槽底部需设排水沟时,工作面宽度(b1)应适当增加。3.4. 沟槽边坡按国家现行规范GB5026897执行,根据地质情况,开工前应提交沟槽断面尺寸及边坡设计,以便项目监理审定,沟槽标高与地面标高有关,地面标高系指挖方场地(道路)自然地面标高。3.5. 沟槽土的堆放沟槽土及材料应堆放在距离沟边0.8米以外的指定位置。土堆高度不能超过1.5米。3.6. 沟槽的挖掘程度在管线沟槽开挖前,得到项目监理对沟槽挖掘的断面尺寸及挖掘土堆放的书面批准

51、后再进行沟槽的开挖,一段沟槽完成后再开始新一段的沟槽的施工。沟槽不允许挖至沟底设计标高以下,如个别地方超挖时,应用中、粗砂分层夯实到设计要求,并达到要求的密实度。管道应直接落在原土上,但当挖至设计标高如遇有膨胀土时,在管道槽底要求加垫粗砂垫层300mm厚,以减少胀缩量,管道回填土要求管顶以上至道路结构层下,回填石粉夯实。机械挖土开挖沟槽底应留至少300mm厚的土层暂不挖,待施工管基时用人工清理到设计标高。挖方放置场地范围内,不能损坏或阻碍任何私人的或公共的通道及永久性工程设施,严格按有关规定及建设方要求执行,在沟槽开挖期间,必须严格保护沟槽两侧永久性工程设施的稳固,如发现问题,应立即停止施工并

52、及时通知监理,在沟槽开挖前应详细调查现场的各种地下设施,凡建设方已提前指出或未指出的与管道交叉的各种地下管线,施工开挖时必须严格保护,并按建设方或监理的要求开挖。3.7. 含水层的挖掘含水层的挖掘要求有适当的防渗围堰措施,应向项目监理提交所采取措施的方案及图纸。在其它情况下,应采取适当措施,如排水设施、沟槽支护等,以保证施工顺利、安全,并使项目监理满意。3.8. 不适合作基槽的土质如果沟槽的土质不适合作管基,应及时以书面的形式向项目监理反映情况,如果确定为不适合作基槽土质,应把土移走,回填夯实中粗砂土。挖掘程度按设计图纸或监理的要求执行。不适合作基槽土质包括植物根、有机污染物、岩石、垃圾、井等

53、异常埋物及有害物质。3.9. 开槽时的滑坡和塌土在土方施工中一定要防止土方两侧的塌陷,在挖土方工程中万一出现塌方时应填满孔洞,加宽沟槽,以适应永久性工程的要求;如果出现孔洞,应在孔洞及其周围填充C10混凝土使之坚固;如遇有害物质,立即以书面形式通知监理,并采取适当的措施保证工作人员、财产及第三方的安全。3.10. 沟槽的支撑土方挖掘时,应征得监理同意,在沟槽内安设支撑,以确保周围地面及临时构筑物的安全。如有必要,应按监理要求适当增加沟槽的宽度,管道被安置且管区被回填前,不得拆除挡板,当回填时,支撑和挡板应被拆掉,并应采用不损坏管道的方法。3.11. 多余土方外运施工中挖掘出的土料、石渣按业主要

54、求送至指定地点堆放。在临时储存和运输过程中,要有切实可行的措施减轻对周围环境的影响。3.12. 沟槽内地下水的排除遇有地下水情况的沟槽施工,必须严格执行给水排水管道工程施工及验收规范中关于施工排水的有关规定,编制详细的降(排)水方案,除在特殊情况下经监理同意,否则沟槽内不允许积水。降、排水措施可采用明沟集水井排水或人工降低地下水位,但无论采取何种降排水措施,均应保证地下水位始终在管基基面以下不小于0.5米,并不得使用正在施工的管道排水。明沟排水的排水坡度应不至冲刷沟底土壤。遇有流砂的土层时宜采用人工降地下水位的方法。全部降、排水设施应保持施工过程的正常运行,直到回填土超过地下水位高度且不致使空

55、管浮起的高度时,才可停止和拆除降、排水设施。要确保地下水位下降后不影响任何相邻的施工或现有设施、构筑物、建筑物的安全。 四、 沟槽回填4.1. 回填和充填土质应清洁,不能用有机物或其它一些不适合的土质回填和充填。管道及其附属构筑物完成,经验收后应及时回填,一旦开始回填,要尽快完成,不得延误,不允许将已完成的管道长期外露不回填,更不允许将其跨越雨冬期。回填时不得损坏管道或构筑物,昼夜温差较大的情况下,回填应在当天气温较低的时候进行。4.2. 沟槽回填前应符合下列规定:4.3. 水压试验前,除接口外,管道两侧及管顶以上回填高度不应小于0.5m;水压试验合格后,应及时回填其他部分。4.4. 砖、石、

56、木块等杂物应清除干净。4.5. 回填土的夯实及管区回填 随着回填土的进展逐步拆除沟槽支撑,但不得影响施工的安全,管沟的土方回填分两个阶段:4.5.1第一阶段回填深度从管沟底或垫层开始达管顶以上500mm,称为管区回填。管线接口应留出来。回填必须用管区材料回填,分层夯实每层不超过200mm。夯实要求管线两侧同时进行,严禁单侧回填或用推土机从一侧向沟内推填,以免引起管道轴线位移和接口变形。管顶500mm内的回填土与两侧回填土的要求相同,并不得使用重锤或机械夯实。回填至管顶500mm以上部分,经监理允许,才能使用机械夯填。对于管区回填,回填土的干密度不得低于ASTM的最大密度的90。一段管线铺设完成

57、后,要尽快回填,每回填100延米后要进行现场夯实度试验。4.5.2第二阶段一段管线管区回填验收合格之后,密实度试验留下的孔洞要填满夯实,其密实度要达到相当标高规定干密度的95。管区以上部分用挖掘出的合适土质回填,不能含有冻土或大石块,分层夯实,厚度不超过300mm。回填土的密实度不得低于最大密实度的95。此项工程一经开工需尽快完成不得延误工期。在尚未形成道路的地段,沟槽回填土要稍高于原地面(不少于500mm)。4.5.3管区材料管区材料是指管区允许回填的材料:1)粒状材料回填:粒状材料回填是采用干净的石粉或山砂,进行合理的级配,其最大尺寸为35mm。砂可用小于6.0mm的中粗砂材料回填。2)素土回填:采用原来的或外运的开挖材料回填,应不含有树根、有机物、垃圾、粒径大于35mm的石块、冻土块和其它有毒物质。4.5.4 回填土密实度的测试对于永久性工程,在开始夯实前向项目监理提供其拟采用的夯实方法和夯实设备的详细情况,以及现场应做的试验。测试和试验点的间距,一般每100m做一个密实度试验。五、 给水管道安装1. 给水管道施工方法使用机械下管时,速度应均匀,回转平稳,下落时低速轻放,不忽快忽慢和突然制动。严禁在被吊管节上站人。吊装前

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论