1、深基坑工程存在的问题和展望1 Overview In recent years, with the development of economy and the progress of society, high-rise buildings and underground buildings have been found in big cities, And tunnel projects increased greatly, but at the same time in order to save the land, make full use of underground space
2、, the deep excavation engineering is increasing. The deep foundation pit engineering is a comprehensive ancient and epoch -making characteristics of geotechnical engineering, because it involves not only the soil mechanical strength and deformation of typical problems it relates to the soil and supp
3、orting structure interaction problems. After the analysis is not difficult to see that the development of foundation pit engineering is a new type of support led to the emergence of new analysis methods, and follow the practice, understanding, practice, understanding the law and gradually matured. I
4、n 1930s, the first in the study the foundation pit engineering Terzaghi and Peake,60s in Oslo and other places of excavation began to implement the construction monitoring, from 70s onwards, many countries have formulated the guiding and supporting design of foundation pit excavation Design and cons
5、truction of the regulations in China.In the early 1980s began to appear a lot of excavation. Before 80s, the domestic high-rise building is one of the few in the basement is a layer of deep foundation pit, but 4 m, often used in slope excavation can solve the problem. By 80s, with a large number of
6、high-rise building construction two, began to appear in basement excavation depth is generally around 8 m, a few more than 10 m. in 90s, Chinasrapid development of high -rise buildings, but also around the construction of large underground municipal facilities, underground shopping malls, subway sta
7、tions, leading to the basement layer gradually increased, the excavation depth of more than 10 m meet the eye everywhere the excavation.2 deep foundation pit engineering problemsDesign and construction of foundation pit engineering, both to ensure the whole support structure in the process of constr
8、uction safety, control structure and surrounding soil deformation but also to ensure the surrounding environment (adjacent buildings and underground public facilities) safety. Therefore, how to ensure the excavation safety and economical and practical is feasible a very important and urgent issues i
9、n the construction of the modern city. Especially in twentieth Century, with the increasingly high requirements of foundation pit engineering, along with more and more problems. Some problems of deep foundation pit are discussed below:1. problems existing in construction stageThe quantity, scale and
10、 distribution of deep foundation pit increase rapidly, and the construction technology of deep foundation pit and monitoring technology in construction field should be improved as soon as possible. Moreover, the construction management is poor and the construction qualification is not strictly limit
11、ed. Therefore, many problems should be paid attention to during construction. It is necessary for construction, owners, design and monitoring to cooperate with and cooperate with each other in the excavation of the foundation pit.1) improper treatment of ground water in foundation pit constructionIn
12、 the construction of foundation pit groundwater treatment is a difficult problem, due to differences in soil and groundwater, the excavation construction method is different, especially in the coastal areas with high water level or surface water rich area, medium treatment of groundwater in deep fou
13、ndation pit engineering construction is the key to the success of the project. The survey shows that over the past few years, our country deep foundation pit retaining support system failure or safety and environmental problems resulted from the failure of the part about the total project 10% 15%, t
14、he soft soil with high water table areas up to 20%, in some areas a higher failure rate. These accidents, some very serious consequences, not only to the country caused great the economic losses, but also caused unnecessary casualties, delay and affect the normal life of the residents around the neg
15、ative effects, damage the image of construction enterprises. The cause of these accidents a The main reason is the improper treatment of groundwater. So, in the deep foundation pit engineering many failed, because a lot of groundwater in foundation pit construction drainage not dealt with drainage o
16、f the upper soil layer mainly solves the backwater and rain water drainage, including the precipitation of light well point, spray well point and deep well point precipitation. Land subsidence may lower the underground water level that will cause adverse effects on the environment, especially in the
17、 deep well dewatering effect. 2) the degree of information construction is not high Due to the geological conditions of deep excavation engineering is complicated, and the special characteristics of the force, the calculation in the design phase of the project value and the actual value in the const
18、ruction process there are some differences. Therefore, the deep foundation pit safety depends not only on the reasonable design and construction, but also depends on throughout the engineering design and construction safety monitoring of the whole process. Safety monitoring is one of the important c
19、onditions to ensure the safety of deep foundation pit engineering, design, engineering and construction of foundation pit monitoring is also known asthe three basic elements ofthe construction of deep foundation pit excavation engineering. In the event of an accident before more or less have warning
20、, because the destruction of foundation pit supporting structure to experience a process from quantitative change to qualitative change, through the information construction can optimize design scheme, to ensure safe and reliable and reasonable excavation of foundation pit construction refers to the
21、 information. The collected information, after processing and prediction results by soil parameter inverse analysis obtained with the actual parameters of soil and using the model forecast again next construction stage of retaining structure and soil properties, and collecting relevant information t
22、he next construction stage. This repeated cycle, we collect the information, modify the design and guide construction constantly, will design a dynamic process. Through the analysis and forecast to guide the construction, through the construction of information feedback design, the design and constr
23、uction of gradually approaching the actual and the exclusion of danger, to achieve the best project. This is a new promising technology, with low cost the effectiveness of the advantages, at present has been used in some engineering. There is still no universal stage is key to the following two reas
24、ons: (1) the lack of experts; (2) feedback slow. But with the development of computer technology and the progress of science and technology, these problems will be smoothly done or easily solved.3 development prospect of deep foundation pit engineeringWith the increasing number and depth of foundati
25、on pit engineering, design and construction technology of foundation pit engineering is updated, emerging new retaining structure types and construction process so as to improve the design theory and calculation method of foundation pit engineering.2.1 the selection of retaining structure of deep fo
26、undation pit should be more reasonableAs everyone knows, the foundation soil deep foundation pit type, groundwater level, and the surrounding environment are important factors to consider the selection of retaining structure of deep foundation pit supporting structure, if reasonable, can achieve the
27、 whole foundation and the safety of the building, but also can bring considerable economic and social benefits but if the type of support structure; unreasonable choice, not only will be critical for the foundation pit and the whole building safety, but also affect the surrounding environment, soan
28、inevitable trend in the future development of deep foundation pit ishow to make the selection of retaining structure is more reasonable.2.2, the extensive useof new technologiesThe popularization and popularization of new technology is also a development trend of deep foundation pit engineering1) ar
29、tificial freezing soil deep foundation pit technology is the use of soft soil with high content, inserted into the freezing pipe in the field of soil around to the excavation in the formation of a certain structural strength of frozen soil through the wall, as the retaining structure of foundation p
30、it construction. With the strength of soil improvement, good antiseepage performance, strong adaptability, the environmental impact of small advantages and cost is lower than that of the conventional methods of the technology. To realize the optimization of the freezing pipe layout, temperature and
31、thickness of the wall can be designed with this method. At present, many domestic application of conventional supporting method for the construction of the pit there have been varying degrees of instability of foundation pit collapse accidents, causing huge economic losses. The artificial freezing c
32、onstruction of freezing wall and has the structural strength and anti seepage effects, for digging a shallow, easy to conventional foundation pit supporting method, freezing method efficiency is not very significant; but for digging deep foundation pit depth more than 10 m, the cost is significantly
33、 lower than that of the conventional method, and the effect is very good, this method widely use at home and abroad, has not yet been adopted, should be vigorously promoted in China, to promote the development of foundation pit engineering in our country.2) SMW special construction methods In Japan
34、in 1970s was SMW (SoilMixingWall) method, and the strength of cement soil piles, the soil cement sealing performance and the core material (usually H steel, but also for concrete and other stiff material) retaining structure of high strength effectively formed an anti infiltration good, high stiffne
35、ss, economy, has great economic potential. The research and application of domestic and some progress has been made in the development of.SMW method is mixing piles and underground continuous wall construction method based on the deep level up, compared with other types of retaining, with large thic
36、kness, high depth, excellent technical and economic indexes, environmental protection and other advantages, is widely used in many fields of underground building foundation pit, underground dam, underground disposal, environmental protection engineering. Although the SMW method of retaining wall has
37、 the advantages of simple structure, but the stress mechanism is quite complex, at present, the lack of understanding of the working mechanism of H steel and cement soil composite material on the formation of the SMW method, not from an objective perspective to analyze the working mechanism of the c
38、omposite structure. How to consider the composite pile composite structure stiffness, In order to ensure the safety of the project based on the stiffness contribution of the maximum utilization of cement soil is a difficult problem in engineering design. I think that the SMW method should be studied
39、 in the following aspects: first, the interaction relationship between shaped steel and cement soil. Including steel and cement soil interface friction, sliding contact the cement soil and the failure mechanism of SMW composite structure damage evolution process and mechanism from the role of coordi
40、nation to cement soil cracking. Secondly, the establishment of H type steel pull -out model more accord with the engineering practice, and taking into account the effect of water pressure in the lateral steel and cement soil surface resistance in the presence of bending deformation, analysis pull ou
41、t the mechanism of H steel, and SMW method in deep foundation pit in soft soil area application technology research.3) information construction technologyDue to lack of technical personnel and other aspects of capital construction did not spread over every corner of the pit. But with the increase of deep excavation engi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2023六年级数学上册 六 百分数第7课时 用方程解百分数问题 2列方程解决稍复杂的百分数实际问题(2)教学实录 苏教版
- 文明礼仪演讲稿模板集合5篇
- 物理教研组工作计划三篇
- 五年级体育下册 第十七课 游戏课:踏石过河、攻关教学实录
- 第6课 拉拉手交朋友 一年级道德与法治上册(2024版)教学实录
- 第3单元第11课《赶赴火场-“系统时间”检测模块的应用》教学实录2023-2024学年清华大学版(2012)初中信息技术九年级下册
- 邀请活动的邀请函合集七篇
- 圣诞节活动总结范文5篇
- -转正述职报告
- 后勤年终工作总结15篇
- 配电房施工组织设计方案(土建部分)
- 回流焊曲线讲解
- 国家开放大学电大专科《英语教学法》2023-2024期末试题及答案(试卷代号:2145)
- 事业单位领导班子考核测评表
- 一些常见物质的安托因常数
- (整理)变形测量作业指导细则
- 布莱恩厨具公司的资本结构分析
- 高速公路服务区工作计划总结与工作思路
- 集团子公司资金计划管理制度
- 幼儿园中班个人保教工作总结
- 食堂操作工艺流程图
评论
0/150
提交评论