下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、(完整)2017年建模美赛a题带翻译(完整)2017年建模美赛a题带翻译 编辑整理:尊敬的读者朋友们:这里是精品文档编辑中心,本文档内容是由我和我的同事精心编辑整理后发布的,发布之前我们对文中内容进行仔细校对,但是难免会有疏漏的地方,但是任然希望((完整)2017年建模美赛a题带翻译)的内容能够给您的工作和学习带来便利。同时也真诚的希望收到您的建议和反馈,这将是我们进步的源泉,前进的动力。本文可编辑可修改,如果觉得对您有帮助请收藏以便随时查阅,最后祝您生活愉快 业绩进步,以下为(完整)2017年建模美赛a题带翻译的全部内容。problem a: managing the zambezi riv
2、erthe kariba dam on the zambezi river is one of the larger dams in africa。 itsconstruction was controversial, and a 2015 report by the institute of risk management of south africa included a warning that the dam is in dire need of maintenance. a number of options are available to the zambezi river a
3、uthority (zra) that might address the situation。 three options in particular are of interest to zra:(option 1) repairing the existing kariba dam(option 2) rebuilding the existing kariba dam, or(option 3) removing the kariba dam and replacing it with a series of ten to twenty smaller dams along the z
4、ambezi river.there are two main requirements for this problem:requirement 1 zra management requires a brief assessment of the threeoptions listed, with sufficient detail to provide an overview of potential costs andbenefits associated with each option. this requirement should not exceed twopages in
5、length, and must be provided in addition to your main report.requirement 2 provide a detailed analysis of option (3) removing the karibadam and replacing it with a series of ten to twenty smaller dams along thezambezi river. this new system of dams should have the same overall watermanagement capabi
6、lities as the existing kariba dam while providing the same orgreater levels of protection and water management options for lake kariba thatare in place with the existing dam. your analysis must support a recommendationas to the number and placement of the new dams along the zambezi river。in your rep
7、ort for requirement 2, you should include a strategy for modulating the water flow through your new multiple dam system that provides a reasonable balancebetween safety and costs. in addition to addressing known or predicted normal watercycles, your strategy should provide guidance to the zra manage
8、rs that explains andjustifies the actions that should be taken to properly handle emergency water flowsituations (i。e. flooding and/or prolonged low water conditions)。 your strategy shouldprovide specific guidance for extreme water flows ranging from maximum expecteddischarges to minimum expected di
9、scharges. finally, your recommended strategyshould include information addressing any restrictions regarding the locations andlengths of time that different areas of the zambezi river should be exposed to the most detrimental effects of the extreme conditions.your mcm submission should consist of th
10、ree elements: a standard 1 page mcmsummary sheet, a 12 page brief assessment report (requirement 1), and your mainmcm solution (requirement 2) not to exceed 20 pages for a maximum submission of23 pages. note: any appendices or reference pages you include will not count towardsthe 23 page limit.问题a:管
11、理赞比西河赞比西河上的卡里巴水坝是非洲较大的水坝之一.它的建设是有争议的,南非风险管理研究所的一份2015年报告包括一个警告,大坝是急需维护。赞比西河管理局(zra)可提供若干选择,以解决这一问题。 zra特别感兴趣的有三个选项:(选项1)修复现有的kariba水坝(选项2)重建现有的卡里巴大坝,或(选项3)拆除卡里巴水坝,并用赞比西河沿岸一系列十到二十个较小的水坝替换。这个问题有两个主要要求:要求1 zra管理需要对三者进行简要评估选项,并提供足够的详细信息以提供潜在成本的概述与每个选项相关的好处.这个要求不应超过两个页面长度,除了主要报告之外,还必须提供。要求2详细分析选项(3) 拆除卡里巴水坝,并用一系列十到二十个沿着赞比西河较小的水坝替换它。这个新的水坝系统应该具有相同的总水量管理能力作为现有的kariba水坝,同时提供相同或更高水平的保护和水管理选项卡拉比湖与现有的水坝。您的分析必须支持建议关于沿赞比西河的新水坝的数量和位置。在您的需求2报告中,您应该包括一个策略,用于调节通过您的新多水坝系统的水流量,提供合理的平衡安全和成本之间。除了解决已知或预测的正常水周期,您的策略应为zra经理提供指导,解释和证明应该采取的行动以正确处理应急水流情况(即洪水和/或延长的低水况)。你的策略
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年大学园林(园林树木学)试题及答案
- 2025年大学第四学年(农产品贮藏加工)工艺优化综合测试题及答案
- 2025年中职(汽车检测与维修)刹车系统维修工艺试题及答案
- 2025年中职健身指导与管理(健身指导技能)试题及答案
- 2025年大学医学影像学(影像诊断)试题及答案
- 2026年碳绩效评估项目可行性研究报告
- 2025年大学园艺产品贮藏与加工(贮藏技术应用)试题及答案
- 2026年翻译服务教学(翻译方法)试题及答案
- 2025年中职汽车修理类(汽修性能测试)试题及答案
- 2025年高职产品设计(产品设计理论)试题及答案
- 继电保护装置调试作业指导书
- 老同学聚会群主的讲话发言稿
- 国家开放大学最新《监督学》形考任务(1-4)试题解析和答案
- 天然气输气管线阴极保护施工方案
- 高血压问卷调查表
- QC成果提高花岗岩砖铺装质量
- GB/T 25156-2010橡胶塑料注射成型机通用技术条件
- GB/T 25085.3-2020道路车辆汽车电缆第3部分:交流30 V或直流60 V单芯铜导体电缆的尺寸和要求
- GB/T 242-2007金属管扩口试验方法
- GB/T 21776-2008粉末涂料及其涂层的检测标准指南
- 第六单元作文素材:批判与观察 高一语文作文 (统编版必修下册)
评论
0/150
提交评论