蒂芬巴赫电液控技术协议_第1页
蒂芬巴赫电液控技术协议_第2页
蒂芬巴赫电液控技术协议_第3页
蒂芬巴赫电液控技术协议_第4页
蒂芬巴赫电液控技术协议_第5页
已阅读5页,还剩9页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、XXXX矿务集团有限公司蒂芬巴赫控制系统有限公司关于ZFG15000/26/38D液压支架ASG型电液控制系统技术协议Technical Agreement of ASG E-H control Systemsfor Shields ZF15000/26/38DBy and Between xxxx Coal Mines Group Co., Ltd. andTiefenbach Control Systems GmbHxxxx矿务集团有限公司(简称甲方)与德国蒂芬巴赫控制系统有限公司(简称乙方)就ZFG15000/26/38D液压支架电液控制系统达成如下技术协议。The tech ni ca

2、l agreeme nts herein belows are made by and betwee n xxxx Coal Mines Group Co., Ltd. (here in after called Party A) and Tiefe nbach Con trol Systems GmbH (here in after called Party B) for shields ZFG15000/26/38D:支架控制方式Shield con trol mode1工作面支架(145 架)Face shields (145 Sets)每个支架控制器控制两个主阀组,前阀组14功能和后阀

3、组8功能,共22功能One ASG con trols two blocks, front block 14F and rear block 8F, total 22F.前阀组 14 功能(145 组) front block 14F (145 Sets) Art. No. 211937Pos.Port功能Fun cti onEV1DN20拉架pulli ng shieldEV2DN20推溜pushi ng conveyorEV3DN20前立柱升Setti ng front legsEV4DN20后立柱升Sett ing rear legsEV5DN12前立柱降Loweri ng front

4、legsEV6DN12后立柱降loweri ng rear legsEV7DN10护帮收Flipper retractEV8DN10护帮伸Flipper exte ndEV9DN10前梁收Front canopy retractEV10DN10前梁伸Front canopy exte ndEV11DN10伸缩梁收exte nsion bar ram retractEV12DN10伸缩梁伸exte nsion bar ramexte ndEV13DN10侧推收Side push retractEV14DN10侧推伸Side push exte ndPDN25主进液Mai n in let por

5、tRDN32主回液Main return port后阀组 8 功能(145 组) Rear block 8F (145 Sets) Art. No.209306Pos.Port功能Fun cti onEV15DN10掩梁立柱降Lower cav ing schieldEV16DN10掩梁立柱升Set cav ing schieldEV17DN10尾梁收Rear canopy retractEV18DN10尾梁伸Rear canopy exte ndEV19DN10插板收Jack board retractEV20DN10插板伸Jack board exte ndEV21DN10拉后溜收Rear

6、 con veyor retractEV22DN10拉后溜伸Rear con veyor exte ndPDN12主进液Main in let portRDN12主回液Main return port二、具体技术要求Detail tech ni cal requireme nts1. 控制器显示菜单语言为中文和英文,顺槽控制主机和地面主机显示菜单为中文。Display menu on con troller is in both Chin ese and En glish, gate con trol unit and surface computer display in Chin ese.

7、2. 制造满足10.5秒工作循环的主阀体。Tiefe nbachs mai n con trol valves are made to meet the cycle time of 10.5 sec on ds.3. 支架配置电液控制系统,能够完成支架的各种动作功能。支架可实现成组程序自动控制, 包括成组自动移架、成组自动推溜、成组自动伸收护帮、成组自动伸收伸缩梁。支架可实现 邻架电控的手动、自动操作,实现本架电磁阀按钮的手动操作。顺槽主控计算机可实现远程 控制工作面液压支架动作,即跟机自动化功能(跟机自动移架、跟机自动推溜、跟机自动喷 雾功能)。可实现成组自动移架和推溜,又可本架手动按钮、左

8、右(1-3)邻架电控按钮控制、 自动循环操作。Shields are equipped with E-H control systems to be able to complete every action function of shields. Shield can realize group program automatic control including group automatic moving shields, group automatic pushing conveyor, group automatic extending and retracting extens

9、ion bar. Shield can finish manual, automatic operation of E-H controls of adjacent shields and the manual operation on solenoid valve button of local shield. Gate main computer can realize remote control for face shield actions, viz., following-Shearer automatic function (following-Shearer automatic

10、 moving shields, following-Shearer automatic pushing conveyor, following-Shearer automatic spraying function). And automatic moving and pushing can be achieved, meanwhile, the manual pushing button in local shield and right and left (1-3) hand of adjacent shields controlled by E-H control button, an

11、d automatic cycling operation.4配备红外线接收装置, 可与工作面采煤机实现联合动作。同时具备接收采煤机数字信号实 现联动功能。支架能满足与采煤机、刮板机进行自动割煤要求,在三角煤区域也能实现自动 拉架。The infrared receiver device is equipped, to be able to complete the associated action with face Shearer. Meanwhile, it should be with the function of receiving signal data of Shearer

12、to complete associatedly action. Shields meet the requirement of auto coal-cutting with Shearer and scraper conveyor, to complete the function of auto shield pulling in triangle mine area. 5对立柱的工作压力、推移千斤顶的行程、煤机的位置、方向等进行监测和数据传输。能将 数据传输至地面控制中心并显示。To monitor and transfer data for the working pressure o

13、f leg, stroke of advancing ram, position and direction of Shearer and etc. To be able to transfer data to surface control center and display. 6电液控制系统设有声音报警、急停、本架闭锁及故障自诊断显示功能,并能方便地进行人 工手动操作。E-H control system is set with sound alarm, quick-stop, local shield lockout and self diagnose and display, als

14、o should be convenient for manual operation.7供电电压为 AC 127V 50Hz 。The power supply voltage is AC 127V 50Hz/12V. 8电控装置外壳防护等级不低于 IP67。E-H equipment housings protection level should be not lower than IP67. 9电控系统为非主 -从机型,当工作面控制系统与顺槽控制中心断开后,仍能完成各种操作 功能。没有顺槽计算机就无法实现自动功能。E control system is NOT Master-slave

15、r type, when face control system disconnects to gate control center, it should aslo be able to complete any operating functions. No automatic function withoutHead gate computer 10支架所有动作功能由电磁阀驱动。All functions of shield can be driven by solenoid valve. 11主阀组为整体式,阀芯采用插装式。Main valve set is integral type

16、, cartridge is adopted with plug-in type. 12应具备与采煤机配合进行全自动化的双向、单向、部分截深割煤功能。It should have the cutting function of automatic double-way, single-way, part cutting depth assorting with Shearer.13通过电液控制系统能配合采煤机实现自动喷雾。It can assist Shearer to realize automatic spraying by E-H control system. 14电液控制系统具备抗干

17、扰能力,不允许有误动作。E-H control system has the ability of anti-disturbing, it is EMC compatible 15电缆的插接可靠,有较好的抗砸、抗挤、抗拉能力,插接灵活。Plugging of calbe is reliable, and has better capability of anti-smashing, anti-crushing, anti-hauling with agile plugging.16压力传感器的量程 060Mpa。Pressure sensor measure range is 060Mpa.

18、17在拉架过程中抬底座装置不得泄压,保证拉架顺利进行。The base-lift device is not allowed to release pressure during pulling, to ensure shield pulling running successfully.18通过控制器程序设置能够实现在降柱和拉架过程中的任何时段启动和结束抬底座动作。To complete starting and ending action of base-lifting during the leg lowering and shield pulling by setting contro

19、ller program.19通过控制器程序设置能够实现护帮板与煤壁贴紧。To be able to bring the flipper to coal wall by setting controller program. 20在需要时,采煤机通过后伸缩梁、护帮能够联动进行及时支护;拉架时伸缩梁能够自动 收回。When it is needed, extending bar and flipper can associately act for prompt supporting after Shearer passes; the extension bar can be drawn bac

20、k automatically during shield pulling.21. 电液控制系统应能同时对以下 5 路数据进行接收和地面上传: 1) 支架电液控制系统 , 2) 采煤机, 3) 刮板机, 4) 泵站, 5) 组合开关。并能够在顺槽和地面监控中心实时远程自动监 测、监控。 监测、监控信息包含每台设备的运行状态、电流、电压、时间、故障诊断、报警 等功能。The E-H control system should be able to receive and transfer following 5 data sets from the face to surface at the

21、same time: 1) shield control system, 2) share, 3) conveyor, 4) pump station, 5)switchgear。 It should also have function of automatic monitoring at head gate computer and surface control center. Monitoring information includes running state, current, voltage, time, fault diagnosis and alarm functions

22、.22所提供的产品要求具有煤矿安全规程所规定的各种保护及要求,产品具有中国国家煤矿安全标志证书和” MA标识牌,电气产品应符合国家防爆标准GB3836-1-42000或其它被中国防爆检验部门认可的标准并具有相应的防爆证书。下井前提供 MA 证书。The provided products are required to have all protections and requirements stipulated in , the products have the certifications of Chinese National Coal Mine Safety Symbol and“

23、MA”marks, the electric products should accord with National Exploding-proof GB3836-1-42000 or other authorized standard by Chinese Exploding-proof Inspection Bereauand with corresponding certifications of exploding-proof. MA certification shall be provided before products going underground.二、主控阀及主要电

24、气元件具体要求Detail requirements of main control valve and main electric components1主控阀 14 功能 Main control valves 14F生产厂家:德国蒂芬巴赫Manufacturer:型式:Tiefenbach1 4功能电液先导主控阀Model:14F E-H main control valve规格:4XDN20+N DN12+8USB in ternal1 XRS232 ON COM2Ether net 卡:10/100 Base TEthernet card:10/100 Base T910接口可根据通

25、信对方的标准协议更改配置,灵活适配。Configures of connector can be changed according to the standard protocols of other side of communication and flexible adapting.使用寿命: 10 年10 yearsWorki ng life:三、ASG型电液控制系统供货范围Offeri ng range of ASG E-H con trol systemZFG15000/26/38D支架ASG型电液控制系统清单E-H control System list for ZFG1500

26、0/26/38D(140架工作面支架)(140 sets of face shields)No序号Name名称Specificati on规格Qty数量122-fu ncti on shield con troller22功能支架控制装置1452Pressure sen sor压力传感器2903Displaceme nt tran sducer(960mm)位移传感器(行程 960mm)1454In frared Tran smitter红外线发射器25In fraredreceiver红外线接收器1456Hose protected cablefor sen sors传感器胶管保护电缆725

27、7Cable SKK28 3500between shield架间胶管保护电缆1458Cable for sole noid valves电磁阀电缆Hirschmann型15959Cable for Power supplies胶管保护电源电缆3910Power supplies电源装置3911Headgate computer 4 iGM4屏顺槽控制装置112Cable from Main control unit to ASG从顺槽控制装置到第一台ASG电缆151314Data tran smissi on without cable数据传输装置(不包括传输电缆)115Software软件

28、116Main control block 14 F., 4xDN20,2xDN12,8xDN12, P-DN25,R-DIN32主控阀组14功能,4xDN20, 2xDN12,8xDN10,P=DN25, R=DIN3214517Main control block 8F.,8xDN12,P=DN12,R=DIN12主控阀组8功能,8xDN10, P=DN12, R=DIN1214518Caving key board放顶煤键盘145四、其它要求 other requireme nts1 乙方红外线发射器到矿后,由甲方负责协调乙方和采煤机制造厂家关于采煤机位置监测装置”中有关部件的配套、安装

29、工作。After the arrival of in frared tran smitters offered by Party B, Party A is resp on sible for assori ng with Party B and Shearer Manufacturer about the issues of equipping the corresponding parts and installation of “Shearer Position Monitor Device”.2. 乙方供货的每组电液主控阀阀组应包括 2XDN20的加长U形卡、1XDN12的加长U形卡和

30、 5XDN10 的加长 U 形卡。Each set of E-H main control valves sets Party B provided should include 2XDN20 long U-staple, 1XDN12 long U-staple and 5XDN10 long U-staple.3. 乙方向甲方提供有关 ASG 电液控制系统元部件及主控阀配套设计尺寸。Party B should provide the equipping design sizes of components of correspongding ASG E-H congtrol system

31、 and main control valves to Party A.4. 乙方免费编制并向矿方和甲方提供中文ASG 型电液控制系统的培训教材和技术文件(包 括 4 份电子版和 10 份纸制资料),其中技术文件包含全系统的备件目录。Party B workouts in free of charge and provide the training documents and technique documents of ASG E-H control system in Chinese version (four copies of E-format files and 10 copies

32、 of paper-printed version) to Part B and the mine, and these documents shall include spare parts contents of whole set of system.5. 乙方在矿对矿方操作、技术和管理人员进行为期7 天的免费技术培训。Party B should go to the mine and train the operating/technique/managing personnels of mine for 7 days in free of charge.6. 乙方负责支架样机及成批出

33、厂的ASG 电控系统的安装、调试指导工作。Party B is responsible for the installation and debuging direction of shield prototype and ASG E-H control system.7. ASG 型电液控制系统到矿进行地面组装、井下安装、试运转时,乙方派出优秀的、有实 际工作经验的工程师到项目现场负责设备安装、调试的技术指导工作,直到试生产完成。Party B should send the excellent and experienced engineer to project locale for t

34、he technique direction of installation and debugging till the manufacturing finished when ASG E-H control systems are put into the mine to mount on surface, install underground, and fulfil running test.8. 电控系统运行期间,乙方根据矿方需要提供技术支持,如需要技术交流及问题处理,乙方 技术人员将在 24 小时之内赶到项目现场。During the running of E control sy

35、stems, Party B should provide technical supports according to the requirements of mine, if the technique communication is needed and problems need to be resolved, the technical engineers of Party B should arrive at the project locale in 24 hours.9. 电液控制系统在从乙方出厂前由乙方通知甲方派人进行验收。Party B should inform Party A to check and accept E-H control systems before taking out of the factory.10. 乙方对电液控制系统产品实行三包 ,质保期为一年 (产品从供货之日起 18 个月;或产品调 试完毕之

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论