版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、ASM CHAPTER 6 ASM Bond Stick On Ball(BSOB)/Bond Ball On Stitch(BBOS)/ Tail Break ASM 1.0) BOND STICK ON BALL(BSOB) 1.1) Description This bonding process is specially developed by ASM to handle multi-die(MCM) bonding application. In the conventional approach, if one is trying to connect the gold wire
2、 from one die to the another, a capillary mark of second bond will be evident on top of the die which may damage the die. The BSOB process will solve this problem by bonding a ball onto the dies surface first, followed by bonding another wire where the second bonds wedge will be landing on top of th
3、is bonded ball(figure 1). ASM Die 1Die 2 Bond Ball 2nd Bond(wedge) 1st Bond Figure 1 : Bond Stick On Ball(BSOB) ASM 2.0) BOND BALL ON STITCH(BBOS)/ SECURITY BOND 2.1) Description This process is also known as security bond. It bonds a ball on top of the wedge of the normal connection wire.This proce
4、ss is mainly used to secure the second bond sticking capability.(Figure 2) Die 1 Lead Bond Ball 2nd Bond (wedge) 1st Bond Figure 2 : Bond Ball On Stitch (BBOS) ASM 3.1) Free Air Ball (FAB 2)is aligned to the center of the bond pad on device 2. Device 1Device 2 FAB 2 3.0 STANDOFF BALL CONTROL BONDING
5、 SEQUENCE ASM 3.2) Capillary descends and bonds ball to bond pad. Device 1Device 2 W/clamp open Capillary Application of 1st bond stand off ball parameter to form Ball Thickness and Ball Size During Stand Off Bonding , SOB parameters are applied . ASM 3.3) Capillary rises to loop base to clear ball.
6、 Device 1Device 2 W/clamp open Capillary rises to set Loop Base Loop Base Contact Pt. Loop base is the distance between the capillary tip and contact point. Recommended setting = 2 ASM 3.4) Capillary move to programme ball offset. Ball offset can be programmed towards or away from the first bond. +
7、ve towards 2nd bond - ve away 2nd bond Device 1Device 2 W/clamp open Actual Ball Offset = Setting x 10um If Ball Offset Setting = 22 Then Actual Loop Base =220um Recommended Setting = - ve 35 ASM 3.5) Capillary descends and forms stitch bond on top of the ball. Device 1 Device 2 W/clamp open *Ball T
8、hickness SOB Parameter (Stand Off Ball Parameter) Capillary descends to set Ball Thickness (Amt. Z movement above the ball height) Contact Pt. * Ball Thickness is the distance between the capillary tip and contact point Recommended setting = 2 ASM 3.6) Capillary moves horizontally for a scrub distan
9、ce to weaken the wire at ball neck. Device 1Device 2 W/clamp open Scrub one direction away from ball Actual Scrub Distance = Setting x 0.8 um If Scrub Distance Setting = 10 Then Actual Scrub Distance = 8 um Capillary move to set Scrub Distance One direction ONLY - Away from the ball Recommended sett
10、ing = 8 ASM 3.7) Capillary rises to tail height Device 1Device 2 W/clamp close Capillary moves to set Tail Length (Amount Z movement above the bump before the wire clamp closes) Recommended setting = 35 ASM 3.8) Capillary rises and tears the wire, as BH ascend to Fire Level. Device 1Device 2 W/c clo
11、se ASM 3.9) EFO fires to form free air ball. Cycle repeats until all “Standoff Ball” are placed. Device 1Device 2 Bond Ball FAB ASM 3.10) After placing all standoff balls. The machine continue to bond wires. 2nd Bond(wedge) 1st Bond Device1Device2Device1 Bond Ball ASM Bump ball formation for BSOB/BB
12、OS MOTION BO LB BT SC Normal LB BO BT Scrub Flat LB BO BT Scrub=0 CONE LB BO BT=LB Scrub=0 LB BO BT LB BO The bump ball formation process is almost like bonding a normal wire, including 1st bond, looping and 2nd bond parameters. ASM 4.0) PARAMETER DEFINITION IN STAND OFF BALL CONTROL MENU 4.1) Loop
13、Base This parameter determines the loop level of the bondhead which should be sufficient to avoid the ball. Range: Loop Base 0 5 Setting : 2 4.2) Ball Offset This setting controls the distance of the table move in order to offset the capillary from the standoff ball. Negative value can be moved towa
14、rds to the first bond. Positive value can be moved away from the first bond. Range: Ball Offset - 40 20 Setting : - ve 35 ASM 4.4) Scrub Distance This setting controls the capillary moves horizontally with a Scrub amplitude to weaken the wire at neck. It is always away from the first bond. Range: Sc
15、rub Dist 4 12 Setting : 8 4.5) Tail Length This setting controls the length of the tail where the bondhead rises to the preset height before the wire clamp is closed. Range : Tail Length 30 40 Setting : 35 4.3) Ball Thickness This parameter refer to the ball thickness which controls the level of the
16、 bondhead as it descends to the top of the ball Range: Ball Thickness 0 5 Setting : 2 ASM 4.6) Time Base 1/2 This setting controls the bond time applied to the standoff ball control only. Time 1 for the 1st bond and Time 2 for the 2nd bond. 4.7) Power Base 1/2 This setting controls the ultrasonic po
17、wer applied to the standoff ball control only. Power 1 for the 1st bond and Time 2 for the 2nd bond. 4.8) Force Base 1/2 This setting controls the bonding force applied to the standoff ball control only. Force 1 for the 1st bond and Force 2 for the 2nd bond. ASM 4.9) Standby Power 1/2 This setting c
18、ontrols the power activated when the bonding head reach the search level, to the moment the bond head contacts the bond surface. With the vibration, before contact take place. Bond head will clean up the pad surface and remove water vapor on the pad. This parameter used for the standoff ball control
19、 only. 4.10) Contact Time 1/2 Refer to the Contact time 1/2 definition in Bond Parameter menu. But this parameter will be affected on the Standoff ball control only. ASM 4.11) Contact Power 1/2 Refer to the Contact Power 1/2 definition in Bond Parameter menu. But this parameter will be affected on t
20、he Standoff ball control only. 4.12) Contact Force 1/2 Refer to the Contact Force 1/2 definition in Bond Parameter menu. But this parameter will be affected on the Standoff ball control only. ASM Figure 4 : Standoff Ball Control Parameter Display(page 2) 5.0 BSOB WIRE PARAMETERS ASM 5.1) Wire Offset
21、 In -Menu This is the offset parameter that is required to ensure maximum contact area between the stitch bond and ball. It is always away from the first bond. Range: Wire Offset 10 30 Recommended setting = 25 5.2) Second Bond Search Speed This Parameter controls the impact for stitch on ball. Range
22、: Search Speed 2 32 256 Recommended setting = 32 2nd Bond Wedge Stand Off Ball Capillary position during stitch bond ASM 5.3) Time Base 1/2 This setting controls the bond time applied to the device. Time 1 for the 1st bond and Time 2 for the 2nd bond. 5.4) Power Base 1/2 This setting controls the ultrasonic power applied to the device. Power 1 for the 1st bond and Time 2 for the 2nd bond. 5.5) Force Base 1/2 This setting controls the bonding force applied to the device. Force 1 for
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年专利技术所有权变更协议模板
- 物联网智能交通系统开发合同
- 2024年建筑劳务分包协议样本
- 2024年酒店装潢工程承包协议
- 在线医疗预约平台开发合同
- 2024年贷款协议补充条款模板
- 2023届高考化学人教版一轮复习测评-(一) 物质的量、气体摩尔体积
- 2024门市房租赁协议示例汇编
- 城市轨道交通在解决土地问题中的作用考核试卷
- 2024家庭厨师职业聘用协议样本
- 仓库卫生和清洁要求
- 《咖啡培训课程》课件
- 《吸入性气体中毒》课件
- 肿瘤健康预防知识讲座
- 护理专业人才培养方案
- 小学生航海知识讲座
- 心电监护并发症预防及处理
- 甲鱼宣传方案策划
- 直播运营团队组织架构与各岗位职责研究
- 慢病管理及远程医疗的应用
- 学校个性化课程管理制度
评论
0/150
提交评论