1、gay is now a provincial key construction project of aluminum ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. in this technological transformation projects, he has overall respons

2、ibility for the day-to-day affairs of the project. in order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. he and engineering department under the leadershi

3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. technical

4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. a project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta

5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. ii 32 large prebaked electrolytic cell on november 7 has been installed, marks has an annual production capacity o

6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through south. second, effectively control the investment. project

7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc

8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million yuan. third, environmental energy-saving effect of the project. project investment of nearly 30 million yuan, using large prebake technology and aluminum oxide d

9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. compared with soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy

10、saving effect is obvious. four are in a relatively short period of time to the normal production. after four months of efforts, a project has put into operation all the 54 240ka large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

11、ficiency in october had reached 93%, is close to and reach the domestic advanced level. in the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont

12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according

13、to the contract. he tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .four outstanding works. they are derived from

14、their own inner feelings. i also sent a student to attend the class department speech contest, failed to get a good result, but also actively cooperate with the department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is i

15、nsufficient. in order to clean up the bedroom, we use the brush brushes a bedroom again. for the class out of a force. in the event we, many projects did not get the desired results. but we understand that we tried, and in the struggle. also has made good progress in many of the! in my class the wor

16、k carried out and the results achieved, thanks to the concern and support of the department, thanks to instructor teachers good, proper guidance, thanks to 46 students in the class will work closely together, to work together. of course, we also have our weaknesses, needs to be further correction in

17、 their future learning and life, with a view to achieving greater results. five declarations of good party branch branch is a fortress, a party member is a banner. fighting in the railway engineering construction group headquarters headquarters branches, a total of members 18. role of the xiang-gui

18、railway and tight south lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, w

19、on the highly valued by leaders at all levels. since october last year since the project began, headquarters branch is tightly around the center of its activities. face south, climate is wet, sooner or later temperature larger, specific difficult, i branch from thought requirements all workers activ

20、e motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues zhijian each other help, each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, pl

21、ay out has as a branch of fighting fortress role and members of pioneer model role. since its start, i command under the correct leadership of the party branch in the group and the superior party, centering on building a qualified party branches, branch of the forts and the battle to play the exempl

22、ary vanguard role of party members, actively working. in command personnel less, and task heavy of situation xia, all members always according to party stronger, and style to are, and service better, and efficiency to high of requirements, from overall starting, better to completed has production or

23、ganization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owners and the group and grass-roots units of praise. first, give full play to the exemplary role of party members. the

24、exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. we pay close attention to party building, requires political party members and cadres must take the lead in learning, set stri

25、ct demands on themselves, .张家浜楔形绿地住宅三期一标张家浜楔形绿地住宅三期一标节能工程施工节能工程施工专专项项施施工工方方案案编制人: 董淑黎上海住总海外建设工程有限公司张家浜楔形绿地住宅三期一标项目部gay is now a provincial key construction project of aluminum ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy sav

26、ing of electrolytic aluminum project manager. in this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. in order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to proje

27、ct progress, and ensure a successful operation, the overall goal. he and engineering department under the leadership of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly re

28、flected in the following aspects: first, careful organization and management achieved remarkable results. technical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very

29、significant results. a project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds.

30、 ii 32 large prebaked electrolytic cell on november 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that

31、 year, created favorable conditions for aluminum through south. second, effectively control the investment. project is subject to a scientific approach to bidding, bidding to make savings of 20 million yuan, in the implementation process of the project, every domestic prices of steel, cement and oth

32、er building materials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million yuan. third, environmental energy-saving effec

33、t of the project. project investment of nearly 30 million yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. compared with soderberg cell before the modification, power

34、 consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. four are in a relatively short period of time to the normal production. after four months of efforts, a project has put into operation all the 54 240ka large c

35、ell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in october had reached 93%, is close to and reach the domestic advanced level. in the case of production half of the cell, this effect can be achieved and better level in the i

36、ndustry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost control, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall per

37、spective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according to the contract. he tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance syst

38、em in place, with all units involved with the coordination and good .four outstanding works. they are derived from their own inner feelings. i also sent a student to attend the class department speech contest, failed to get a good result, but also actively cooperate with the department and class act

39、ivities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. in order to clean up the bedroom, we use the brush brushes a bedroom again. for the class out of a force. in the event we, many projects did not get the desired results. bu

40、t we understand that we tried, and in the struggle. also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the department, thanks to instructor teachers good, proper guidance, thanks to 46 students in the class will

41、 work closely together, to work together. of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. five declarations of good party branch branch is a fortress, a party member is a banner. fighting in the railw

42、ay engineering construction group headquarters headquarters branches, a total of members 18. role of the xiang-gui railway and tight south lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the construction work. holding high the flag of our party members, unite and l

43、ead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. since october last year since the project began, headquarters branch is tightly around the center of its activities. face south, climate i

44、s wet, sooner or later temperature larger, specific difficult, i branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged colleagues zhijian each other help, each other learning business knowl

45、edge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. since its start, i command under the correct leadership of the party branch in the group and the supe

46、rior party, centering on building a qualified party branches, branch of the forts and the battle to play the exemplary vanguard role of party members, actively working. in command personnel less, and task heavy of situation xia, all members always according to party stronger, and style to are, and s

47、ervice better, and efficiency to high of requirements, from overall starting, better to completed has production organization, and coordination, and guarantees and the management work, in engineering progress, and quality, and benefits, and safety, aspects are made has good of results, get has owner

48、s and the group and grass-roots units of praise. first, give full play to the exemplary role of party members. the exemplary role of party members and cadres are silent on the command, the exemplary role of party members and cadres are the best of the ideological and political education. we pay clos

49、e attention to party building, requires political party members and cadres must take the lead in learning, set strict demands on themselves, .2目目 录录第一章第一章 工程概况工程概况.2第二章第二章 编制依据编制依据.4第三章第三章 施工部署施工部署.5第一节 施工准备.5第二节 项目组织机构.6第四章第四章 施工进度计划及资源配置计划施工进度计划及资源配置计划.10第五章、进场材料抽样复检计划及现场检测计划第五章、进场材料抽样复检计划及现场检测计划.

50、11第六章第六章 节能施工方案节能施工方案.12第一节 屋面节能工程.12第二节 施工方案.27第三节 电气节能主要工程施工方法.38第四节、给排水节能工程.46第五节 空调与通风工程.52七、隐检内容、方法及记录方式七、隐检内容、方法及记录方式.72十、附件十、附件.73gay is now a provincial key construction project of aluminum ltd-province with an annual output of 50,000 tons of technical innovation project of environmental pro

51、tection and energy saving of electrolytic aluminum project manager. in this technological transformation projects, he has overall responsibility for the day-to-day affairs of the project. in order to ensure that southern companys control the scale of investment, strengthen field management, pay spec

52、ial attention to project progress, and ensure a successful operation, the overall goal. he and engineering department under the leadership of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding a

53、chievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. technical innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a ye

54、ar, has achieved very significant results. a project first 56 slots from dismantling the old slot just 168 days, civil engineering, installation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national ind

55、ustrys fastest speeds. ii 32 large prebaked electrolytic cell on november 7 has been installed, marks has an annual production capacity of 50,000 tons of electrolytic aluminum production capacity of aluminum. entire project almost 8 months earlier than planned, achieved the goal of production transf

56、ormation benefits that year, created favorable conditions for aluminum through south. second, effectively control the investment. project is subject to a scientific approach to bidding, bidding to make savings of 20 million yuan, in the implementation process of the project, every domestic prices of

57、 steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant increase in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million yuan. third, environment

58、al energy-saving effect of the project. project investment of nearly 30 million yuan, using large prebake technology and aluminum oxide dense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. compared with soderberg cell before t

59、he modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy saving effect is obvious. four are in a relatively short period of time to the normal production. after four months of efforts, a project has put into operation al

60、l the 54 240ka large cell into regular production, stable current channel conditions and all the economic indicators are good, current efficiency in october had reached 93%, is close to and reach the domestic advanced level. in the case of production half of the cell, this effect can be achieved and

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论