




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 9L 手提式泡沫灭火器操作说明手提式泡沫灭火器操作说明 PROCEDURE FOR PORTABLE FOAM EXTINGUISH 1. 拔下安全销拔下安全销 Pull out safety-pin 2. 把控制杆压到底把控制杆压到底 Press the control lever all the way down 3. 对着火根部进行灭火对着火根部进行灭火 Direct at the base of flame and squeeze the
2、trigger 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 抛绳枪操作规程抛绳枪操作规程 PROCEDURE FOR LINE-THROWING APPLIANCE 1.将抛射绳后端系固在船上,将抛射体细钢索与抛射绳连接在将抛射绳后端系固在船上,将抛射体细钢索与抛射绳连接在 一起,注意抛射绳不要扭缠或打结。一起,注意抛射绳不要扭缠或打结。 Tie the end of line to the steady parts of the ship , connect the line and th
3、e steel line on the throwing part, ensure the line no twist, tangle and overlapping. 2.将底火装入发射筒底部拧紧。将底火装入发射筒底部拧紧。 Fit cartridge into firing tube on the bottom side using screw driver until the end of cartridge come to the rear surface of firing tube and stop . 3.将保险栓后拉至将保险栓后拉至“f”位置时再扳向右侧,到位置时再扳向右侧,到
4、“s”位置,上好保险。位置,上好保险。 Pull the handle of firing gun to F Position ,then turn right to the position marked with S 4.将发射筒和发射器组装在一起。将发射筒和发射器组装在一起。 Fix together the prepared firing gun and firing tube 5.将抛射体放入抛射筒内。将抛射体放入抛射筒内。 Insert the prepared rocket into the firing tube , position of both feet must be
5、at a level. 6.去掉保险,双手紧紧持住抛绳枪对准目标方向,扣动扳机发射。去掉保险,双手紧紧持住抛绳枪对准目标方向,扣动扳机发射。 Turn the handle left to the F Position , aimed at the aim ,pull the triggler. The wire must hung rightly and have 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING no twist and tangle. 雷达应答器操作说明(雷达应答器操作说明(
6、JQX-30A) Procedure for SART 1.拉动支架上拉手,取出拉动支架上拉手,取出 sart。 Move sart by pulling up the handle from the barket 2.测试时,将开关圈旋至测试时,将开关圈旋至“on”位置,绿灯亮,表示位置,绿灯亮,表示 sart 状状 况正常况正常 When test , turn the swich ring to On Position , the green lcd will light , that means the sart in good condition. 3.测试完毕,松开旋转开关圈退回至
7、测试完毕,松开旋转开关圈退回至“off位置即可位置即可 After completed self-test loose the switch ring back to Off Position. 4.当船舶遇险时,逆时针旋转开关圈至当船舶遇险时,逆时针旋转开关圈至“on”位置即开始发射。位置即开始发射。 When ship in distress, turn the switch ring anti- clockwise to On Position , the sart start working. 关键性设备操作规程关键性设备操作规程 operation procedure for cri
8、tical equipment SC LIAONING EPIRB 操作规程操作规程 (JQE-103) PROCEDURE FOR EPIRB 1.测试测试 Test 将开关压到将开关压到 test 位置,黄色指示灯和红色指示灯亮位置,黄色指示灯和红色指示灯亮 0.44s 表示设备发射信号功能正常。表示设备发射信号功能正常。 Turn the selecter switch to Test Position , yellow led and red led light for 0.44s , 406.028mhz transmitter is normal. 2.启动启动 Switch on
9、 在手动启动方式下,将开关旋至在手动启动方式下,将开关旋至“on”位置即可启动位置即可启动 epirb。 Used manual activation ,distress signals are transmitted when turn the the select switch to On Position . 3.注意:注意:Epirb 只有在紧急情况下才能使用。只有在紧急情况下才能使用。 Note: Epirb used only in distress situation. 在通常情况下,在通常情况下,epirb 开关设置在开关设置在“ready”,即即 自动启动自动启动 方式。方式
10、。 The select switch is set at Ready position , i.e. Auto model. Do not turn the switch to On Position unless in case of emergency. 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 救生艇应急释放程序救生艇应急释放程序 LAUNCH PROCEDURE OF LIFE BOAT 1.解开救生艇的捆绑钢丝,拔掉充电电源解开救生艇的捆绑钢丝,拔掉充电电源 Remove la
11、shings and electrical supply. 2.人员登艇人员登艇 Embarkation. 3.坐好位置,系好安全带坐好位置,系好安全带 Take seated positions and secure seat belt. 4.确保救生艇内没有松动的物品确保救生艇内没有松动的物品 Ensure no loose or movable objects in boat. 5.关闭救生艇门窗关闭救生艇门窗 Secure hatches. 6.去掉安全栓的保险插销,向上拉开安全栓再向前推去掉安全栓的保险插销,向上拉开安全栓再向前推 Remove red safety pin on s
12、afety lever, and lift safety lever up and forward. 7.启动引擎启动引擎 Start engine. 8.确定救生艇下方水面无障碍物确定救生艇下方水面无障碍物 Ensure clear landing area. 9.逆时针操作主释放装置盘,直到救生艇脱钩逆时针操作主释放装置盘,直到救生艇脱钩. 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING Turn main release anti-clockwise ,until hook is open
13、 and boat is released. 10.驶离大船。驶离大船。 Steer away. 使用吊臂放艇步骤使用吊臂放艇步骤 Procedure for launch life boat by davit. 首先按下液压电源,启动动力装置。首先按下液压电源,启动动力装置。 Switch on the power of hydraulic pump. 1. 解开小艇顶部及尾部的绑扎绳。 Remove the lashes and secures. 2. 用 LEVER A 控制杆控制横向吊钩,使之与小艇的吊环连接,然后絞紧 Operate lever A, connect the hook
14、 and the ring of life boat, make it tight. 3. 用 LEVER A 控制杆使小艇沿着滑道下滑,直到小艇的前部超过滑道的末端。 Operate lever A, let the boat slid downward , until the bow of the boat go out of the davit. 4.LEVER B 控制杆控制吊臂甩出,直到最大限度。 Operate lever B , make the davit move outbound, until the max angle. 5.用 LEVER A 控制杆控制吊艇钢丝使小艇下
15、降。 Operate lever 6.救生艇落水后,解开小艇与吊艇钢丝的连接 When the boat reached sea surface, release the boat from the hook of the davit. 回收救生艇步骤 Procedure for restore the lifeboat 1. 操纵小艇使得尾部位于吊艇装置的下方。 (小艇尾部最好与船尾相对) Steer the boat to the ships stern right under the davit.(boat and ship stern to stern) 2. 用 LEVER A 控制
16、杆吊起小艇,直到大约 0.5 米高于滑道的末端。 Operate lever A, hoist the boat ,until the boat 0.5m higher than the slid. 3. 合理交替使用 LEVERA ,LEVER B,控制吊臂与吊艇钢丝,使得小艇回到滑道上。 Operate leverA,B , control the davit and wire, let the boat back to the slid . 4.这时降落吊臂,直到与艇架 1-1.5 米处停止。 Lower the davit , stop when the movable davit 1
17、.5m above the slid . 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 5. 绞起吊艇钢丝使得小艇沿着滑道上滑,直到小艇尾部的脱钩装置与艇甲板的钩子吻合。 Hoist the wire, when the hook of the boat meet the lever of boat deck , stop. 6. 待到完全归位后,在艇内回复脱钩装置,插上安全销。 When the boat reach its right position , reset the releas
18、e hook in the boat, insert the safety pin. 7. 绑好小艇,松开吊艇钢丝,脱钩。 Secure the boat , release the wire hook. 雷达应答器操作说明(雷达应答器操作说明(JQX-30A) SART OPERATION 1. 拉动支架上拉手取出 SRAT. MOVE SART BY PULLING UP THE HANDLE FROM THE BRACKET. 2. 测试时,将开关圈旋至“ON”位置,绿灯亮,表示 SART 状况正常。 When test , turn the switch ring to ON posi
19、tion, the green LED light, that means the SART is in good condition. 3. 测试完毕,松开旋转开关圈退回至“OFF”位置即可。 After completed self-test , loose the switch ring back to OFF position. 4. 当船舶遇险时,逆时针旋转开关圈至“ON”位置即开始发射 In case of distress, turn the switch ring anti-clockwise to ON position, the SART start transmittin
20、g. 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 救生艇机操作规程救生艇机操作规程 Operation procedure for boat engine 启动前准备 Preparation for starting 1.检查燃油柜,曲柄箱滑油位 Check the level of the fuel tank and tube oil 2.检查(洒水)冷却水泵的离合器是否活络 Confirm that the clutch of the cooling pump is normal 3.检
21、查推进器离合器是否在脱开位置。 Confirm that the clutch of the thruster is disengaged 4. 合上电源总开关 Turn on the main battery switch . 1启动 Starting 1.将启动开关转到“GLOW”预热 1-3 分钟。 Turn the starting switch to glow and warm the engine about 1-3 minutes. 2.将油门手柄放到适当低速位置 Push the fuel handle to low speed position 3.将电动启动开关转到“启动”
22、位置,至发动机发动后松开将启动开关,启动“OFF”位置。 Turn the starting switch to start position and loose it once upon the engine runs ,the switch will back to OFF position automatically . 4.检查滑油压力是否正常。 Confirm the tube oil pressure of the engine is normal. 5.扳动离合器手柄。进行正,倒车试验。 Test each way with operating the clutch of the
23、 thruster. 6 如艇放到水中,注意检查洒水泵排出压力。 Check the discharge pressure of the cooling pump if the boat in water. 三 停机 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING Stopping 1.使离合器脱开,让发动机在低速下运行约 3 分钟后停止运转。 Disengage the clutch of the thruster and after the engine run about 3 minute
24、s at low speed stop the engine. 2.打开发动机的防水旋塞,放尽冷却水腔内的海水。 Open the drain cock of cooling water, drain out the water in cooling tank . 3.将电瓶充足电,为下次启动坐好准备。 Recharge the battery for last starting. 救助艇释放操作规程救助艇释放操作规程 Launch procedure for rescue boat 1.发现海上幸存者,指定的放艇人员到放艇处准备。发现海上幸存者,指定的放艇人员到放艇处准备。 When a s
25、urvivor is found ,the appointed person posted to launch position of rescue boat. 2.救助艇艇员立即登艇。救助艇艇员立即登艇。 The rescue boat staff go on board immediately . 3.操纵吊艇装置将救助艇摇出舷外。操纵吊艇装置将救助艇摇出舷外。 Turn rescue boat and davit toward the sea by operating the davit handle . 4.艇上人员拉动操纵绳遥控操纵,将救助艇降至水面。艇上人员拉动操纵绳遥控操纵,将救
26、助艇降至水面。 The rescue staff pull down the remote line lever for lowering the rescue boat. 5.当救助艇到达水面,脱掉吊钩。当救助艇到达水面,脱掉吊钩。 When the rescue boat reached the sea surface, release the boat from hook release device by pulling release hook lever. 6.启动发动机,操纵救助艇。启动发动机,操纵救助艇。 Start engine,(toward the survivor) 关
27、键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 使用吊臂释放救生筏操作规程使用吊臂释放救生筏操作规程 Procedure for launch the life-raft with davit 1.释放前检查静水压力释放器和救生筏容器绑扎绳连接状况,将释放器上面的钩子脱开。 Check the connection condition of the static hydraulic releaser. Remove the hook at the releaser. 2.解开绑带,将容器上半部分拿
28、开。 Remove the lash band ,take the upper half of the container away. 3.将救生筏吊钩同吊臂的卸扣连接。 Connect the hook to the shackle of the davit . 4.将救生筏从容器中,用两根绳子分别系住救生筏两端,绳子另一端系在船上。 Lift the life-raft out of the container ,fasten the two bowsing line to the cleats, lift the life-raft by davit and swing outbound
29、. 5.拉动充气绳,启动充气钢瓶给救生筏充气。 Activate the life-raft by pull the painter . 6.将成形的救生筏将至船边,固定,人员登筏。待人员全部登上救生筏,解掉先前系的 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 两根绳子。 The life-raft draw near the ships side and fasten the two bowsing lines to the ship. When boarding is completed
30、,release the bowsing lines. 7.在筏上拉动遥控操纵绳将救生筏降至水面,脱钩。 Activate launching installation for launching the life-raft,pull the release hook operating line before the life-raft reach the sea surface. when the raft reached the sea surface, release. 8.割断连接在船体上的充气绳,驶离大船。 Cut the painter with safety knife, st
31、eer away. 救生筏释放与登筏程序救生筏释放与登筏程序 Launch operation when main switchboard blackout emergency G/E will start automatic and supply power. 2. 将机旁控制旋钮放在“manu”位置,应急主配电板内的旋钮放 在“manu”位置,可以手动启动应急发电机。 If set engine side knob to “manu” position ,emergency main switchboard knob to “manu” position; it can be start
32、关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING manual . 2-1 使用电瓶启动应急发电机时,按下启动按钮即可启动应急发 电机准备供电。 When start emergency G/E by battery, press start button to start emergency G/E and supply power. 2-2 人工启动应急发电机时,首先将油门杆放在供油位置锁定, 然后将摇把插入启动蓄能装置,摇动手柄转动蓄能指示至红线 位置后,取下摇把;然后按下蓄能释放手柄,应急
33、发电机就会 启动准备供电。 When manual start emergency G/E, first step, the fuel rod must be locked the supplying position , then insert crank to start accumulator equipment, turn handle to red line, take out crank, then press start accumulator release handle, emergency G/E will start and prepare to supply power
34、. 风油切断操作规程风油切断操作规程 OIL PUMP AND FAN SHUTDOWN OPERATION PROCETURE 1. IN CASE OF FIRE,SWITCH OFF “ES-1”, “ES-2”AND“ES-3 IMMEDIATELYON BRIDGE OR AT FIRE STATION. 失火时迅速在驾驶台或消防站切断“ES-1”, “ES-2”AND“ES-3”。 2. IN CASE OF FIRE FIGHTING DRILL, SHUD DOWN “ES-1”, “ES- 2”OR“ES-3” ON BRIDGE,AT FIRE STATION,AT E/R
35、 ENTRANCE OR IN CARGO CONTROL ROOM IN ACCORDANCE WITH REQUIREMENTS IN THE CONDITION OF SAFETY MANEUVERING. 在消防演习时,根据需要在驾驶台,消防站,机舱门口或货控室关闭 “ES-1”, “ES-2”OR“ES-3”。 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipment SC LIAONING 3. IN CASE OF TEST, FOR EXAMPLE PSC, CDI OR OCIMF INSPECTIONS, P
36、RESS BOTTON“ES-1”, “ES-2”OR/AND“ES-3” ON BRIDGE,AT FIRE STATION,AT E/R ENTRANCE OR IN CARGO CONTROL ROOM ACCORDING TO INSPECTION OFFICERS INSTRUCTIONS. 在测试时, 例如 PSC,CDI,或者是 OCIMF 检查时,根据检查官的要 求在驾驶台,消防站,机舱门口或货控室关闭“ES-1”, “ES-2”OR“ES-3”。 4. RESUME POWER SUPPLYS AFTER FINISHING THE ABOVE ACTUATIONS. 完成以
37、上动作后恢复供电。 REMARKS: ES-1, ES-2, AND ES-3 LISTS AND CONTROL PLACES ARE RESPECTIVELY AS FOLLOWS: ES-1 LOCATION: B.C.C, FIRE CONTROL STATONN, E/R ENTRANCE ES-1 地点:驾驶台,消防站,机舱入口地点:驾驶台,消防站,机舱入口 NO.2 N2 GEN. COMPRESSOR 2 号氮气发生器压缩机 NO.1 M/E L.O PUMP 1 号主机滑油泵 NO.1 M/E G/E F.O SUPPLY PUMP 1 号主机/发电机燃油供给泵 NO.1 G
38、/E M.D.O SUPPLY PUMP 1 号发电机轻油供给泵 NO.1 H.F.O TRANSFER PUMP 1 号重油驳运泵 CYL. OIL TRANSFER PUMP 气缸油驳运泵 L.O TRANSFER PUMP 滑油驳运泵 NO.2 M/E L.O PUMP 2 号主机滑油泵 NO.2 M/E&G/E F.O SUPPLY PUMP 2 号主机/发电机重油供给泵 NO.2 M/E&G/E F.O CIRC. PUMP 2 号主机/发电机重油循环泵 NO.2 G/E M.D.O SUPPLY PUMP 2 号发电机轻油供给泵 NO.2 H.F.O TRANSFER PUMP 2 号重油驳运泵 NO.2 E/R VENT FAN 2 号机舱风机 M.D.O TRANSFER PUMP 轻油驳运泵 H.F.O CIRC. PUMP FOR G/E PORT 电机港口重油循环泵 H.P.P ROOM SUPPLY FAN 货泵间供风机 PURIFIER ROOM EXH. FAN 分油机间抽风机 关键性设备操作规程关键性设备操作规程 operation procedure for critical equipm
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 富氧燃烧施工方案
- 室内艺术漆施工方案
- 2025年地理试题及答案
- 6年级下册语文园地5日积月累朗读
- 5年级下册书人教版英语书
- centos中多线程压缩命令
- 的田字格书写格式
- arcgis开始编辑的代码
- 广东减震支架施工方案
- 登山台阶开挖施工方案
- 《心力衰竭护理》课件
- 2025年中国模数转换器(ADC)行业市场前瞻与投资战略规划分析报告
- 内保单位培训
- 早产儿与低出生体重儿袋鼠式护理技术规
- 进化医疗-跨物种肿瘤基因治疗的开拓者
- 法理学复习题+答案
- 信息化系统平台试运行方案
- 《认知理论》课件
- 《田野调查方法》课件
- 2024年度宁夏回族自治区国家电网招聘之环化材料类题库检测试卷B卷附答案
- 火电工程达标投产考核标准(2024版)
评论
0/150
提交评论