![国际土木工程建筑承包合同[页52]_第1页](http://file2.renrendoc.com/fileroot_temp3/2021-6/1/aa50deb7-909f-49a0-8048-d906656b79a9/aa50deb7-909f-49a0-8048-d906656b79a91.gif)
![国际土木工程建筑承包合同[页52]_第2页](http://file2.renrendoc.com/fileroot_temp3/2021-6/1/aa50deb7-909f-49a0-8048-d906656b79a9/aa50deb7-909f-49a0-8048-d906656b79a92.gif)
![国际土木工程建筑承包合同[页52]_第3页](http://file2.renrendoc.com/fileroot_temp3/2021-6/1/aa50deb7-909f-49a0-8048-d906656b79a9/aa50deb7-909f-49a0-8048-d906656b79a93.gif)
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、国际土木工程建筑承包合同 (中英文对照)页 52国际土木工程建筑承包合同(中英文对照)国际土木工程建筑承 包合同(中英文对照)65 . 7如按上一款规定终止,承包人应迅速从工地移走所有建 筑设备,并向其转包人提供同样的转移设施。(8)if the con tract shall be term in ated as aforesaid ,the con tractor shall be paid by the employer , in sofar as such amounts or items shall not have already been covered by payme nts
2、 on acco unt made to the con tractor ,for all work executed prior to the date of term in ati on at the rates and prices provided in the con tract and in additi on65 . 8如果合同如上终止,就承包人所得的暂付款项中尚未包 括的在终止之日前已完成工作的款项,业主应按本合同所规定的价格 支付给承包人,此外还应支付:(a)the amounts payable in respect of any prelimi naryitems ,、f
3、ar as the work or servicecomprised there in has bee n carried out or performed、and a proper proportion as certified by the engineer of any such items 、the work or service comprised in which has beenpartially carried out or performed所有有关临时单据应予支付的款项,只要单据所含的工作或服 务已经完成,如此种单据所含的工作或服务只完成一部分,则只支付经工程师确认的应予支
4、付的那一部分款项。(b) the cost of materials or goods reas on ably orderedfor the works which shall have bee n delivered to the con tractor or of which the con tractor is legally liable to accept delivery , such materials or goods becoming the property of the employer upon such payme nts being made by him因工程而
5、订购的材料或货物的合理费用,包括已运交承包人的 和承包人按法律有义务接收的材料或货物,业主向承包人付款后,这些材料或货物即成为业主的财产。(c) a sum to be certified by the engineer , being the amount of any expe nditure reas on ably in curred by the con tractor in the expectati on of completi ng the whole of theworks in sofar as such expe nditure shall not have bee n
6、covered by the payme nts in this sub-clause before men ti oned经工程师确认的,承包人为完成整个工程而发生的合理费用, 只要本款上述各种费用未将此费用包括在内。(d) any additional sum payable under the provisions of sub-clauses (1), (2) and (4) of this clause .本条第1、第2和第4款所规定的追加付款。(e) the reas on ablecost of removal of con structi onalplant under sub-clause (7) of this clause and , if required by the con tractor , return thereof the con tractors main pla nt yard in his country of registration or to other destination , a
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 智慧港口自动化装卸设备智能搬运机器人市场前景预测报告
- 2025年休闲食品健康化转型与食品添加剂替代品研发报告
- 【高中语文】《为了忘却的记念》课件+统编版高二语文选择性必修中册+
- 2025年汽车零部件再制造产业市场潜力与增长动力分析报告
- 2025年金融租赁公司业务创新案例分析及风险防范策略报告
- 融合创新视角下2025年广播影视行业媒体融合的跨界营销策略分析报告
- 2025年化妆品零售行业自有品牌策略与竞争优势研究报告
- 2025年在线教育平台用户满意度提升策略与教育行业政策解读报告
- 护理员培训工作管理制度
- 不合格医用设备管理制度
- JGJ406T-2017预应力混凝土管桩技术标准附条文
- 学术英语课程知到章节答案智慧树2023年上海理工大学
- 社会保险业务申报表(申报1表)
- GB/T 18103-2013实木复合地板
- 社区工作者经典备考题库(必背300题)
- QC∕T 900-1997 汽车整车产品质量检验评定方法
- 年产10吨虾青素生产项目可行性研究报告
- 幼儿园大班绘本:《没有牙齿的大老虎》 PPT课件
- 小学科技社团活动电子版教(学)案20篇
- 黑龙江省龙东地区中考地理真题试题含答案
- PEP小学英语四年级下册单词句子复习
评论
0/150
提交评论