1、题目:君山二期工程施工组织设计一、外文原文:1. design project management1.1 choosing the planning practicechoosing a suitable planning practice is extremely important. introducing a pre-qualification process provides essential insights about efficiency, specialist knowledge and quality: three to five applicants receive p
2、reliminary design documents and the building programme. then interviews are held, reference evidence examined and the practices visited on the spot. but the key features are planning quality, knowledge of materials, degree of detail, and cad and office equipment. the ability to coordinate building a
3、nd technical planning is particularly relevant.1.2 design and authorization planningcoordination and control of the planning process and content are particularly important in this planning phase. in no circumstances should planning in china be left to the design institute alone. regular planning and
4、 coordination meetings examine the planning process in its entirety to ensure that guidelines and standards are being met. it is important to coordinate routing and to check for collision points.1.3 working plansregular coordination, control and support are also required at the final planning stage.
5、 coordinating building and technical workers within the planning team is often a weak point as well. important details and technical specifications have to be demanded. it is not usual in china to present details on a scale of 1:20 to 1:5, and these planning features have to be insisted on; a great
6、deal of convincing argument will be needed.1.4 invitation to tender and tender awardstender documents drawn up to chinese standards are less detailed than comparable western tender documents. considerable importance should be attached to detailed working drawings. drawings should be ranked before te
7、nder documents. it is not permissible to insist on specific product makes. materials must be described neutrally in terms of product. this means that the building firm is able to use inferior materials without the clients agreement. this often results in buildings with serious deficiencies in qualit
8、y and execution. to avoid these negative consequences, architects try to go beyond the standard guidelines to prevent the use of inferior quality materials. also, chinese planning and industrial standards are antiquated and do not yet meet national or international standards.as a rule, five to ten f
9、irms (general contractors or firms offering individual services) are invited to tender. often foreign firms with branches in china are invited as well. bids from such firms come out well above those of their chinese competitors.after the bids have been evaluated, negotiations are conducted with the
10、most reasonable bidders. awards are decided on the basis of reference projects, quality of execution and evaluations of special proposals. because the subsoil is so poor, the use of deep foundations on alluvial land is widespread. to gain time, the underground engineering work can be put out to earl
11、ier tender and award to specialist building firms.1.5 building and completion phasethe legislation requires using local site supervision and a quantity surveyor (see chapter b 2.2). site supervision requirements are not the same as the standard german site supervision requirements laid down in hoai,
12、 phase 8. chinese site supervision practices offer the following service pattern under the headings quality monitoring and safety management:- examining the working plans- quality control for building materials- quality control for building plant and equipment- building site safety- checking current
13、 building progress- examining the qualifications of the building site personnel- demanding and examining inventory documentsonly building sites that also convey an impression of an orderly approach can produce quality and work effectively. this includes cleanliness and safety. chinese building sites
14、 need pioneering work in this field. it does not make any sense to compel the contractor to adopt a particular working programme that runs counter to his own ideas. it is in fact advisable to make concessions in order to make best use of the available production and fitting methods. quality control
15、starts even in the planning phase. in the actual building phase, care should be taken to ensure that the required materials are really used, and that product-specific fitting requirements are met.the contractor can make alternative proposals to the tender standards. these are examined and approved o
16、n the basis of specimens and references. it has turned out to be worthwhile to build specimen rooms before the actual building phase starts, to test the guidelines for details and materials and introduce improvements to materials and details in good time. it is essential to check and approve the qua
17、lity of finish in the form of mock-ups before production begins for facades, roof areas and other critical parts of the building.1.6 documentationthe quality control process ends with the correction of faults and the start-up phase. buildings are officially accepted in china at the point of final ac
18、ceptance. the quality bureau, the fire prevention department and the environmental health office have to approve in order to ensure successful acceptance. the as-complete plans should be drawn up by the planning practice, as the building firm usually delivers these too late, and in poor quality.1.7
19、communicationit is a characteristic feature of chinese building projects that a large number of participants have to work together, under pressure from deadlines and cost factors, on the basis of differing information from various locations. this creates the necessity for a digital platform that giv
20、es those involved in the project access to up-to-date documents and the ability to communicate with the same aims in mind and to keep up with the work as it needs to be done. but the project management team should have access to central scheduling and work monitoring, including reporting. these syst
21、ems link those involved in the project, control the workflow, and distribute news, documents and information.2 planning and building costs2.1 quantity surveyingchinese quantity surveyors provide the same services as their english model. quantity surveying is the generic term for cost planning and co
22、st control. quantity surveying includes tender award and contract management, both of which are part of the cost control process. the quantity surveyor is commissioned by the client directly and assists with planning and controlling project investment. he represents the clients financial interests t
23、hroughout the entire course of the project. during the realization phase the quantity surveyor evaluates the level of work completed so that part payments and supplementary demands can be fixed, assists in warding off complaints, or evaluates and negotiates with the company over justifiable addition
24、al demands. effective cost control is carried out within the project management framework. all the costings are noted in a cost monitoring system. cost monitoring is not a passive system. precise project control means that cost changes can be identified even in the initial phase. causes and effects
25、of measures affecting costs are conveyed to the project management team at an early stage so that counter-measures can be introduced where necessary.cost reduction opportunities are largely exhausted by the end of the planning phase.the diagram makes it clear that realization decisions made in the e
26、arly planning phases crucially influence fixing the cost framework. the importance of control increases when planning is concluded and during the realization phase.despite the overwhelming volume of investment by western standards, professional cost and schedule control rarely occurs in china. moreo
27、ver, clients who are commercially successful and put a great deal of money into building projects often have no knowledge of how to implement and control planning and building work, and often rely on their experience in other industries. even though the predominant chinese enterprise culture is not
28、comparable with the western world, professional project management will be indispensable in future if building investment is to accomplish its aims.二、外文译文:1.1 选择一个切实可行的规划方式选择一个切实可行的规划方式是很重要的。采用一种资格预审的方式能够给工作效率、专业知识和产品质量提供必要的洞察力:三到五个投标人能够获得项目的初步设计文件和项目规划方案。接着进行面谈,以实证考察和现场勘探表现为依据。但是最关键的因素是单位的规划质量、具备的材
29、料知识、注重细节的程度、以及计算机辅助设计和办公设备。毕竟协调建设和技术规划的能力相当密切的。1.2设计和授权规划协调和控制规划过程及内容在规划阶段当中是相当重要的。在中国,任何情况下都不能把设计工作单独留给设计院。定期进行规划和开展协调会议以此检查整个规划过程,这样才能确保指导方针和标准真正能够起到作用。这对协调指定的工艺流程路线和检查出产生矛盾的点是很重要的。1.3工作计划在规划的最后阶段,仍然需要常规协调、控制管理、各种技术支持。协调建设过程进度和技术工人的工作往往是整个规划队伍里面的薄弱环节。对于比较重要的细节和技术规范都必须作出严格地要求。1:20到1:5这样的一个细节方面的比例在目
30、前的中国是很少见的,我们必须坚持这样的规划特点,鼓励团队成员们积极进行这方面的讨论。1.4邀请投标和投标奖励在起草的投标文件方面,中国的文件详细程度远远比不上西方国家做得好。值得考虑的一个重要的方面是,应该对工作图纸的详细程度给于足够的关注。在投标之前,应该对工程图纸的详细好坏程度进行排名。不能允许一意孤行地坚持使用特殊产品的决定。在所有列入考虑的材料当中,都要对任何一种材料进行客观中立的描述。这就是说,在文件详细程度上做得不够的话,可能建设单位在没有经过业主的同意,就可以使用劣质材料进行建设。这往往会导致建筑物在质量和使用方面存在严重的缺陷。要避免这些不良影响,建筑师需要跳出标准的指导方针的
31、限制,进行适当变通,以此来避免建设过程中使用劣等材料的行为。因为中国的很多建设规划和行业标准都显得滞后,跟不上国家标准更跟不上国际标准。设计院起草细图纸设计院出图设计院编制投标文件设计院批准投标文件设计院确定最终投标文件设计院分派投标文件估算项目造价业主接受投标业主选择投标人投标单位报价业主评价谈判、签订合同邀请投标和奖励的流程图这方面有个规定,一般邀请五到十架建设单位(传统的承包商或者是能够提供独立完整建设服务的个体团队)进行投标。当然了,国外的建设公司在中国的分支机构也会得到邀请。通常这些国外公司的报价往往会高于国内的其他竞争者。在对所有的投标进行评估后,选出几个个最合理的投标者进行详细谈
32、判。是否中标取决于他们对项目的质量评估和给出的特殊建议。因为建筑的基础很差,而在冲积土地上使用深基础是很普遍的。为了能够争取时间,地下工程部分可以让早期的且这方面的专家较多的建设单位进行建设。1.5建设和竣工阶段法律上规定,这两个阶段需要监理进行现场监督,也需要一定数量的测量人员(详见b章2.2节)。现场监督的标准不同于德国的所要求的,坐标符合hoai、相位8。中国的现场监督活动要提供以下的服务模式,正如下列标题所说的“质量监控”和“安全管理”:-检查工作计划-建筑材料的质量控制-建设生产厂房和设备的质量控制-建设施工现场的安全工作-检查控制当前的项目进度-检查施工现场工作人员的从业资格-严格
33、按要求检查相关库存文件施工现场只有建筑用地,这会给人传达一种思想:一个井然有序的方法能够生产出有质量保证的产品并且高效率工作。这也包括清洁和安全。中国的建筑行业领域需要先驱者为其注入新鲜血液。强迫承包商采用一种与自己意愿相违背的特殊方法是没有意义的。实际上,做出这方面的让步是及其明智的,这样能够使现有的生产作业方法和施工模式得到最充分的利用。项目的质量控制在规划阶段就应该开始了。在建设进行阶段,要小心谨慎细心把关,确保需要的建材是真材实料,需要的特殊部件能够合适的安装到位。对于承包商来说,他们可以提出能够替代投标标准的建议。这些建议需要审核,在承包商提供的样本和参考资料的基础上决定是否批准。事实证明,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 运营助理的年终总结
- 新生儿轻度窒息的护理
- 福建省2024八年级数学上册第12章整式的乘除12.2整式的乘法3.多项式与多项式相乘课件新版华东师大版
- 人事测评课件教学课件
- 2.1.2碳酸钠和碳酸氢钠 说课课件 高一上学期化学人教版(2019)必修第一册
- 洗地机行业现状分析报告
- 如何写年终述职报告
- 肱骨远段骨折康复治疗
- 不样的我教案反思
- 2025文旅景区蛇年新年国潮非遗年货大集主题活动策划方案-111P
- 中文分项样本a10vm.a10ve
- 电梯安装工程进度计划与措施保障方案
- 幼儿园游戏方案与案例-完整版PPT课件
- 生产安全事故风险评估报告(参考模板)
- ASME培训教程ASME规范第VIII-1卷-压力容器
- 过磅管理制度管理办法
- 绳子的故事(课堂PPT)
- 第2章 行车荷载分析-3
- 华为交换机常用配置
- 社区居家养老服务需求论文
- 110米钢桁梁顶推架设监理实施细则
评论
0/150
提交评论