下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、jv agreement template1.0 purpose.the purpose of the venture shall be to bid upon rfp (rfp number) and, if successful, to enter into and consummate that certain (specify type of services) services for (department/agency name) for the base period of the contract, and options, totaling not more than (n
2、umber) months from contract award date. 2.0project manager. (name) has been selected as the project manager for this contract and is an employee of (8(a) participant firms name). (he/she) shall be responsible for contract performance, overseeing the job-site, reporting to and implementing the instru
3、ctions of the managing director, preparing a daily written log detailing all developments and aspects of the job, and submitting such log to the managing director at his request.3.0not less than 51% of the net profits earned by the joint venture will be distributed to the 8(a) participant(s). 4.0ban
4、k accounts.the operating account (“operating account”) shall be at (bank name) bank. the operating capital account shall be established in the name of the joint venture, (joint ventures name). all receipts of the venture shall be deposited into its operating account. all checks drawn on the operatin
5、g account will require two (2) signatures, one from each joint venturer. each joint venturer may designate the person or persons who may sign on its behalf. all expenses incurred under the contract will be paid from the account.5.0 equipment. equipment, facilities and other resources will be provide
6、d as listed in exhibit _ .6.0 contract oversight. either venturer will have the right to visit the contract site to evaluate the contract performance.source of labor. the joint venture must perform at least the following percentage of work:(1) services (non-construction). 50% of the cost of the cont
7、ract incurred for personnel with its own employees;(2) supplies or products. 50% of the cost of manufacturing the supplies or products (not including the cost of materials);(3) general construction. 15% of the cost of the contract with its own employees (not including the cost of materials); and(4)
8、special trade construction. 25% of the cost of the contract with its own employees (no including the cost of materials). see 13 cfr 124.510, 13 cfr 125.6.participant must perform a significant portion of the work.negotiating 8(a) contract(name) will be responsible for negotiating the original 8(a) c
9、ontract, should negotiations be required by the (department/agency) name, and any subsequent negotiations required by the (department/agency) name.7.0 ensured performance. (8(a) participant firms name) and (partnering firms name) are obligated to ensure performance of the 8(a) contract and to comple
10、te performance despite the withdrawal of any party to the joint venture.8.0 books.accounting and other administrative records including the ventures books, and any other records relating to the joint venture shall be kept and maintained at the office of (8(a) participant firms name. each venturer sh
11、all during regular business hours have access to and may inspect and copy any and all such books and records. sba shall have authority to inspect the records of the venture at any time. 9.0 books. accounting and other administrative records including the ventures books, and any other original record
12、s relating to the joint venture shall be kept and maintained at the office of (8(a) participant firms name) after completion of the contract.10.0 quarterly financial statements showing cumulative contract receipts and expenditures (including salaries of the joint venture principals) shall be submitt
13、ed to sba not later than forty-five (45) days after each operating quarter.11.0 project-end profit and loss statements, including a statement of final profit distribution must be submitted to sba no later than 90 days after completion of the contract.sba must approve this joint venture prior to award of the subject 8(a) contract on behalf of the joint venture.subject to sba, u.s. department of (agency) will execute an 8(a) contract in the name of (8(a) participant firms name) and (partnering firms name), inc. trading as (joint venture name) joint venture.int
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《GBT 26686-2017 地面数字电视接收机通 用规范》专题研究报告
- 《GB-T 32392.4-2015信息技术 互操作性元模型框架(MFI) 第4部分:模型映射元模型》专题研究报告
- 《GB-T 8576-2010复混肥料中游离水含量的测定 真空烘箱法》专题研究报告
- 元宇宙场景信息搭建咨询协议
- 智能建筑工程师岗位招聘考试试卷及答案
- 种子行业种子电商运营专员岗位招聘考试试卷及答案
- 2026年学校教师培训工作计划(4篇)
- 2026年教师培训工作计划(3篇)
- 2025年直流传动矿井提升机合作协议书
- 2025年仪器仪表及文化、办公用机械项目发展计划
- 钢板租赁合同条款(2025版)
- 辐射性白内障的发现与研究
- 珠海市产业和招商扶持政策汇编(2025年版)
- 国开机考 答案2人力资源管理2025-06-21
- 物理●山东卷丨2024年山东省普通高中学业水平等级考试物理试卷及答案
- 提升会计职业素养的试题及答案
- 电动吸盘出租合同协议
- 胃穿孔的相关试题及答案
- 制药行业清洁生产标准
- 教育学原理知到智慧树章节测试课后答案2024年秋浙江师范大学
- 医学影像技术技士题库
评论
0/150
提交评论