下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、jv agreement template1.0 purpose.the purpose of the venture shall be to bid upon rfp (rfp number) and, if successful, to enter into and consummate that certain (specify type of services) services for (department/agency name) for the base period of the contract, and options, totaling not more than (n
2、umber) months from contract award date. 2.0project manager. (name) has been selected as the project manager for this contract and is an employee of (8(a) participant firms name). (he/she) shall be responsible for contract performance, overseeing the job-site, reporting to and implementing the instru
3、ctions of the managing director, preparing a daily written log detailing all developments and aspects of the job, and submitting such log to the managing director at his request.3.0not less than 51% of the net profits earned by the joint venture will be distributed to the 8(a) participant(s). 4.0ban
4、k accounts.the operating account (“operating account”) shall be at (bank name) bank. the operating capital account shall be established in the name of the joint venture, (joint ventures name). all receipts of the venture shall be deposited into its operating account. all checks drawn on the operatin
5、g account will require two (2) signatures, one from each joint venturer. each joint venturer may designate the person or persons who may sign on its behalf. all expenses incurred under the contract will be paid from the account.5.0 equipment. equipment, facilities and other resources will be provide
6、d as listed in exhibit _ .6.0 contract oversight. either venturer will have the right to visit the contract site to evaluate the contract performance.source of labor. the joint venture must perform at least the following percentage of work:(1) services (non-construction). 50% of the cost of the cont
7、ract incurred for personnel with its own employees;(2) supplies or products. 50% of the cost of manufacturing the supplies or products (not including the cost of materials);(3) general construction. 15% of the cost of the contract with its own employees (not including the cost of materials); and(4)
8、special trade construction. 25% of the cost of the contract with its own employees (no including the cost of materials). see 13 cfr 124.510, 13 cfr 125.6.participant must perform a significant portion of the work.negotiating 8(a) contract(name) will be responsible for negotiating the original 8(a) c
9、ontract, should negotiations be required by the (department/agency) name, and any subsequent negotiations required by the (department/agency) name.7.0 ensured performance. (8(a) participant firms name) and (partnering firms name) are obligated to ensure performance of the 8(a) contract and to comple
10、te performance despite the withdrawal of any party to the joint venture.8.0 books.accounting and other administrative records including the ventures books, and any other records relating to the joint venture shall be kept and maintained at the office of (8(a) participant firms name. each venturer sh
11、all during regular business hours have access to and may inspect and copy any and all such books and records. sba shall have authority to inspect the records of the venture at any time. 9.0 books. accounting and other administrative records including the ventures books, and any other original record
12、s relating to the joint venture shall be kept and maintained at the office of (8(a) participant firms name) after completion of the contract.10.0 quarterly financial statements showing cumulative contract receipts and expenditures (including salaries of the joint venture principals) shall be submitt
13、ed to sba not later than forty-five (45) days after each operating quarter.11.0 project-end profit and loss statements, including a statement of final profit distribution must be submitted to sba no later than 90 days after completion of the contract.sba must approve this joint venture prior to award of the subject 8(a) contract on behalf of the joint venture.subject to sba, u.s. department of (agency) will execute an 8(a) contract in the name of (8(a) participant firms name) and (partnering firms name), inc. trading as (joint venture name) joint venture.int
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年中职(客户服务实务)客户服务综合测试试题及答案
- 2025年高职(旅游管理)导游服务技能阶段测试题及答案
- 2025年大学建筑电气与智能化(电气工程理论)试题及答案
- 2025年中职(物联网技术应用)物联网通信技术试题及答案
- 2025年高职新能源汽车运营应用管理(管理技术)试题及答案
- 2026年物业客服(客户关系维护)试题及答案
- 2025年中职农资营销与服务(产品推广)模拟试题
- 2025年大学大三(产品创新设计)产品市场适配设计阶段测试题及答案
- 2025年中职(会计)财务报表分析阶段测试试题及答案
- 2025年中职物联网技术应用(物联网感知基础)试题及答案
- 车间电缆整改方案模板(3篇)
- 徐州村务管理办法
- 政协机车辆管理办法
- 食品加工助剂管理办法
- DB50∕T 1604-2024 地质灾害防治边坡工程结构可靠性设计规范
- 渝22TS02 市政排水管道附属设施标准图集 DJBT50-159
- 非现场执法培训课件
- 中国电气装备资产管理有限公司招聘笔试题库2025
- 糖尿病足的护理常规讲课件
- 2025年高考英语复习难题速递之语法填空(2025年4月)
- 2025外籍工作人员劳动合同范本
评论
0/150
提交评论