




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、外文翻译学生姓名 邓志望 学号 专业班级07级土木工程03班指导教师 职称畐I教授毕业论文成绩Building construction concrete crack of prevention and processing AbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar
2、crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure.Keyword:Concrete crack prevention processingForewordConcretes ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addi
3、tion material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, model of in the concrete existence numerous tiny and a little bit other use function not a creation to endanger.But after the concrete be subjected to lo
4、tus carry, difference in temperature etc. function, tiny crack would continuouslyofexpand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.Concrete building and Gou piece usually all take se
5、wer to make of, because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat
6、arrive peoples life and property safety.A lot of all of crash of engineeringsis because of the unsteady development of the crack with the result that.Modern age science research with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluc
7、table, also acceptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of wi
8、dth.But at under construction should as far as possible adopt a valid measure control crack creation, make the structure dont appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid of the reason be a lot of and , the asymmetry si
9、nk to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemical effect.Want differentiation to treat in the actual engineering, workout a problem according to the actual circumstance.In the concrete
10、engineering the familiar crack and the prevention1.Stem Suo crack and preventionStem the Suo crack much appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup stem Suo, and this kind of constringencyis cant
11、negative.Stem Suo crack of the creation be main is because of concrete inside outside of influence, surface more big pull should dint but creation crack.The relative .Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 mm, the flat surfac
12、e part much see in the big physical volume concrete and follow it more in thinner beam plank short to distribute.Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of the water pressure dint wou
13、ld creation the water power split crack influence concrete of loading dint etc.Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. relevant.Main prevention
14、 measure:While being to choose to use the constringencyquantity smaller cement, general low the adoption, lower the dosageof cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio
15、 the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under constructionof match ratio, use of concrete water quantity absolutecant big in match ratio design give
16、 settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is
17、 in the concrete structure of the constringency sew.2.The Su constringency crack and preventionSu constringency is the concrete isbefore condense, surface because of lose water quicker but creation of constringency.The Su constringency crack is general at dry the center breadth, both ends be in the
18、centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost in the capillary creation bigger negative press but make a concre
19、te physical volume sharplyconstringency, but at this time the strength of concrete again cant resist its constringency, therefore creation cracked.The influence concrete Su constringencyopen the main factor of crack to prevention measure:One is choose to use stem the Suo value smaller the Huo sour b
20、rine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cement and water of dosage.Threeis to sprinkle before building concrete,water basic level and template even to soak through.Four i
21、s in time to overlay the perhaps damp grass mat of the plastics thin film, protect in the concretesurface.Five is in the and block breeze facilities, protect in time.3.Sink to sink crack and preventionThe creation which sink to sink crack is because of the structure foundation soil quality not and e
22、venly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loose move etc. to cause, especially at winter, t
23、he template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment development, bigger sink to sink crack, usually of wrong, crack width
24、 usually with sink to decline quantity direct proportion relation.Crack width under the influence of temperature variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.Main prevention measure:One is rightness loosesoft soil, return to fill soil found
25、ation a construction at the upper part structure front should carry on necessityof Hang solid with reinforce.Two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even.Three is keep concrete from sprinkle infusing the fo
26、undation in the processis soak by water.Four is time that template tore down to cant be too early, and want to notice to dismantle a mold order of sequence.Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.4.Temperature crack and preventionTemperat
27、ure crack much the occurrence is in big surface or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure.Concrete after sprinkling to build, in the a creation a great deal of of water turn the kgm 3, each sign square the rice concrete will
28、 release a calories of kJ and make concrete internal thus the temperature rise to reach to 70 C or so even inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior certain of pull should dint.When pull should dint exceed the anti- of
29、concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in temperature variety more big, perhaps is a concrete to be subjected to assault of cold
30、 wave etc., will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull should dint but creation crack, this kind of crack usually just in more shallow scope o
31、f the concrete surface creation.The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave;The size bigger structure of the beam plank length, the crack run parallel with short side more;Thorough with pierce through sex of temperatur
32、e crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more airtight.Crack width the size be different, be subjected to temperature variety influence more obvious,winter compare breadth, summer more narrow.The concrete
33、temperature crack that the cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious.The emergence of the this kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete mel
34、t, antitired and anti- Shen ability etc.Main prevention measure:One is as far as possiblechooseto use low the 450 kgm 3 following.Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone anticipate class to go together with, the Chan a
35、dd powder ash from stove or efficiently reduce water etc. to come to reduce cement dosage and lower water to turn improvement concrete of mix blend to processa craft, lower sprinkle of concrete to build temperature.Six is the in addition that the Chan add a in the concrete, improvement the concrete
36、mix to match a thing of mobility, protect water, lower water to turn is the sprinkle to build can the adoption take to establish to plank etc. assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete.Eight is the temperature of big physical volume concret
37、eshould the dint relate to structure size, concrete structure size more big, temperature should dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenienceof in spread of the physical volume concrete cool off piping, cold w
38、ater perhaps cold air cool off, let up concrete of inside outside difference in temperature.Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before
39、 building concrete in the Ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, sprinkle water to protect, appropriate extension protect time, a
40、ssurance the concrete surface be slow-moving cool off.At the cold season,concrete surface should constitution measure, in order to prevent cold wave assault.14 is the allocation be a little amount in the concrete of reinforcing bar perhaps add fiber material concrete of temperature crack control at
41、certain of scope inside.5.Crack and prevention that the chemical reaction causeAlkali bones anticipating the crack that reaction crack and reinforcing bar rust eclipse cause is the most familiar in the reinforced concrete structure of because of chemical reaction but cause of crack.The concrete blen
42、d a future reunion creation some alkalescenceion, these ion with some activity the bone anticipate creation chemical reaction and absorb surroundings environment in of water but the physical volume enlarge, make concrete crisp loose, inflation open crack.In this kind of crack general emergence concr
43、ete structure usage period, once appear very difficult remediable, so should at under construction adopt valid the measure carry on prevention.Main of prevention measure:While being to choose to anticipate with the alkali activity small freestone bone.Two is the in addition which chooseto use low ly
44、e mire with low alkali or which choose to use accommodation with anticipate to repress an alkali bone to anticipate reaction.Because the concrete sprinkle to build, flap Dao bad perhaps is a reinforcing bar protection layer thinner, the rust eclipse, the reinforcing bar physical volume of the rust e
45、clipse inflation, cause concrete bulge crack, the crack of this kind type much is a crack lengthways, follow the position of reinforcing bar appear.Usually of prevent measure from the thickness of the layer.Two is a concrete class to go together with to want good.Three is a concrete to sprinkle to n
46、ote and flap Dao airtight solid.Four is a reinforcing bar surface layer Tu2 Shua antisepsis coating.Crack processingThe emergence of the crack not only would influence structure of whole with just degree, return will cause the rust eclipse of reinforcing bar, acceleration concrete of carbonization,
47、lower durable and anti- of concrete tired, anti- Shen ability.Therefore according to the property of crack and concrete circumstance we want differentiation to treat, in time processing, with assurance building of safety usage.The repair measure of the concrete crack is main to sew method, the struc
48、ture reinforce a method, concrete displacement method, electricity chemistry protection method and imitate to living from be applicable to stability and to structure loading the ability dont crack daubery cement syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint, asphalt etc. an
49、tisepsis material, at protection of in the meantime for keeping concrete from continue under the influence of various function to open crack, usually can adoption the surface in crack glue to stick glass fiber cloth etc. measure.1, infuse syrup, the Qian sew methodInfuse a syrup method main the conc
50、rete crack been applicable to request to the structure whole of repair, it is make use of pressure equipments gum knot the material pressinto the crack of concrete,gum knot the material behind and concrete formation one be whole, thus reinforce of purpose.The in common use gum knot materialmaterial.
51、The Qian sew a method is that the crack be a kind of most in common use method in, it usually is follow the crack dig slot, the Qian fill Su in the slot or rigid water material with attain closing crack of purpose.The in common use Su material common use rigid water material is the polymer cement sa
52、nd syrup.2, the structure reinforce a methodWhen the crack influence arrive concrete structure of function, will consideration adopt to reinforce a method to carry on processingto the concrete structure.The structure reinforce medium in common use main every aspect accumulate, outside the Cape depar
53、tment of the Gou piece pack type steel, adoption prepare should the dint method reinforce, glue to stick steel plate to reinforce, increase to establish fulcrum to reinforce and jet the concrete compensation reinforce.3, concrete displacement methodConcrete displacement method is processing severity
54、 damage concrete of a kind of valid method, this method be first will damage of the concrete pick and get rid of, then again displacementgo into new of concrete or other material.The in common use displacement material concrete or the cement sand syrup, polymer or change sex polymer concrete or sand
55、 syrup.4, the electricity chemistry protection methodThe electricity chemistry antisepsis is to make use of infliction electric field in lie the quality of electricity chemical effect, change concrete or reinforced concrete the environment appearance of the place, the bluntness turn reinforcing bar
56、to attain the purpose of antisepsis.Cathode protection method, chlorine salts withdrawing a method, alkalescenceto recover a method is a chemistry protection method in three kinds of in common use but valid method.The advantage of this kind of method is a protection method under the influence of env
57、ironment factor smaller, apply reinforcing bar, concrete of long-term antisepsis, since can used for crack structure already can also used for new set up structure.5, imitate to living from legal moreImitate to living from secrete a certain material towards suffering wound part auto, but make the wo
58、und part , join some and special composition(such as contain to glue knot of the liquid Xin fiber or capsule) in the concrete of the tradition the composition, at concrete inner part formation the intelligence type imitate to living from fiber can make the crack re-The crack is widespread in the con
59、crete structure existenceof a kind of phenomenon, it of emergence not only will lower the anti- Shen of building ability, influence building of usage function, and will cause the rust eclipse of reinforcing bar, the carbonization of concrete, lower the durable of material, influence building of loading ability, so want to carry on to the concrete crack earnest research, differentiation treat, adoption reasonable of the method carry on processing, and at under
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024成都师范学院辅导员招聘笔试真题
- 2025年抗肝片吸虫病药合作协议书
- 2025年空气和废气监测仪器项目合作计划书
- 2025年湖南省退役军人事务厅下属事业单位招聘考试笔试试题【答案】
- 2025年江西省农业农村厅下属事业单位招聘考试笔试试题【答案】
- 2025年教师招聘考试教育综合理论知识复习题库(300题)【答案】
- 2025年印刷品、记录媒介复制品合作协议书
- 项目投资管理制度 (一)
- 课堂教学效益年活动开展情况汇报
- 消防值班制度
- 2025江苏省惠隆资产管理限公司招聘30人易考易错模拟试题(共500题)试卷后附参考答案
- 籍贯对照表完整版
- 2022年北京公共交通控股(集团)有限公司招聘笔试试题及答案解析
- 压力管道基础知识(管理类)
- 气体灭火系统验收表1
- 新北师大版六年级上册数学全册教学课件
- DB1309T 256-2021 榆三节叶蜂综合防治技术规程
- 土木工程概论全套课件完整版电子教案最新板
- 超星尔雅学习通《声光影的内心感动电影视听语言(四川大学)》章节测试答案
- 燃气工程计价规则及定额应用
- 上教社深圳版小学英语1-6年级单词汇总
评论
0/150
提交评论