




已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
ABAQUS中预应力Truss单元的两种实现方法例题:100 m长钢缆水平放置从x = 0到x = 100。两端固定。无初始拉力,计算下垂量。截面;A = 0.01539 m2,Density:r=7800 kg/m3, g = 9.8 m/s2,E=2.1e+11 N/m2Analytical solution of maximum displacement (u2) at x = 50m :U2_max= -(3*r*g*L4)/(64*E)(1/3) = -1.194944005 m方法一.沿truss element加沿长度方向初始拉应力(see job-1.inp)此文件中使用了initial condition, type = stress方法加初始拉应力。因工程上无此初应力,更好的方法是使用降温法。算完后再升温。用降温法。算完后再升温。NOTE:降温法施加预应力(激活钢绞线)。温度=-力/(膨胀系数*弹模*钢绞线面积)1、第一步,在truss单元中施加一个初始应力,让计算处于初始平衡状态;初始应力设置过小,可能不收敛,应多次试算,找到一个合理的应力值。一般情况下,这个初始值对最终值的影响不大,可以忽略。2、第二步,施加truss单元的自重荷载,打开非线性开关(nlgeom=YES)考虑几何非线性问题;3、本例中初始值采用0.1Mpa。自重作用下缆索的拉应力约为80Mpa。最大位移为-1.195 m,与理论计算值吻合得很好。*HeadingCable appling gravity load with initail stressThe maximum Analytical displacement without initail stress (at x = 50 m) U2 = -1.194944005 meter* Method 1. Using * initial condition,type = stress method*Preprint, echo=NO, model=NO, history=NO, contact=NO*Node 1, 0., 0. 101, 100., 0.*NGEN, NSET = NALL1, 101, 1*Element, type=T2D21, 1, 2*ELGEN, elset = ELALL 1, 100, 1*ELSET,ELSET=EL_OUT1, 51, 100*Solid Section, elset=ELALL, material=steel 0.01539,*Nset, nset=Left1,*Nset, nset=right101,*Nset, nset=mid51,* MATERIALS*Material, name=steel *Density7800.,*Elastic2.1e+11, 0.3*initial condition, type = stress* Note: the solution will not converge as the initial stress 100,000 N/m2ELALL, 100000*BoundaryLeft, 1, 2Right, 1,2*Step, name=Step-0, inc=1000Initial stress equilibrium*Static1, 1., 1e-05, 1.*Output, field, variable=PRESELECT*Output, history, variable=PRESELECT*Node print, nset = mid, freq = 1000U,*EL PRINT, ELSET=EL_OUT, freq = 1000S*END STEP* -* STEP: Step-1*Step, name=Step-1, nlgeom=YES, inc=1000Apply gravity load*Static0.01, 1., 1e-05, 1.* Name: GRAVITY-1 Type: Gravity*DloadELALL, GRAV, 9.8, 0., -1.* OUTPUT REQUESTS*Restart, write, number interval=1, time marks=NO*Output, field, variable=PRESELECT*Output, history, variable=PRESELECT*Node print, nset = mid, freq = 1000U,*EL PRINT, ELSET=EL_OUT, freq = 1000S*End Step方法二.使用STABILIZE parameter on the *STATIC.(see job-2.inp)“stabilization”在结构上附加artificial viscous damping(粘滞阻尼),使得计算结果to go beyond the instability point。但计算结果必须验证,并必须保证ALLSD比内能ALLIE小很多。NOTE:1.第一步用*Static, stabilize=2E-10。笫二步不用stabilize (相当于*Static, stabilize=0)。2.使用nlgeom=YES in the step to apply the gravity load.3.最终拉应力= 8E7 N/m2与方法一相等。4.The maximum displacement (at node 51) equals the analytical result.5.Check the ALLSD and ALLIE. The ALLIE isgreaterthan ALLSD. (See figure 1)6.The deformation shape of the cable can be examined by CAE. It may need to set the deformation scale factor to a large number (10 1000).7.使用此法必须极端谨慎。稍微不慎,结果会完全不对。For example,用*Static, stabilize=2E-4 (default value of the stabilize parameter)重算此题。其结果如下;.Check the ALLSD and ALLIE. The ALLIE islessthan ALLSD. (See figure 2)The deformation shape with deformation scale factor 1000 is shown in figure 3. In the figure, only the first and last elements are deformed. The maximum deformation value is not correct.使用stabilize parameter学问很多,一般是越小越好。因为stabilize parameter是artificial value,无法确定理论上的最佳值。我是用试错法。从开始default value (2.0e-4)往下减(2.E-6, 2.0E-8,.),直到不收敛(2.0E-12).经过验证结果(see the note 4, 5, and 6),我决定在计算中使用2.0E-10。*HeadingCable apply gravity load using stabilize parameterThe maximum Analytical displacement without initail stress (at x = 50 m) U2 = 1.194944005 meter* Method 2. Using *Static, stabilize method*Preprint, echo=NO, model=NO, history=NO, contact=NO*Node 1, 0., 0. 101, 100., 0.*NGEN, NSET = NALL1, 101, 1*Element, type=T2D21, 1, 2*ELGEN, elset = ELALL 1, 100, 1*ELSET,ELSET=EL_OUT1, 51, 100*Solid Section, elset=ELALL, material=steel0.01539,*Nset, nset=Left1,*Nset, nset=right101,*Nset, nset=mid51,* MATERIALS*Material, name=Steel*Density7800.,*Elastic2.1e+11, 0.3*BoundaryLeft, 1, 2Right, 1,2* STEP: Step-1*Step, name=Step-1, nlgeom=YES, inc=1000Apply gravity load* the default value of stabilize value is 2.0E-4*Static, stabilize=2E-4*Static, stabilize=2E-100.01, 1., 1e-05, 1.* Name: GRAVITY-1 Type: Gravity*DloadELALL, GRAV, 9.8, 0., -1.* OUTPUT REQUESTS*Restart, write, number interval=1, time marks=NO*Output, field, variable=PRESELECT*
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2030年中国盆景行业发展趋势规划分析报告
- 柳州城市职业学院《城乡规划原理C》2023-2024学年第二学期期末试卷
- 山东体育学院《有机化学I2》2023-2024学年第二学期期末试卷
- 广州城市理工学院《交换原理与NGN》2023-2024学年第二学期期末试卷
- 2025年海南省安全员考试题库附答案
- 辽宁工程技术大学《领导科学》2023-2024学年第二学期期末试卷
- 山东商业职业技术学院《生物化学与分子生物学(含遗传学)》2023-2024学年第二学期期末试卷
- 郑州城市职业学院《英语高级视听说》2023-2024学年第二学期期末试卷
- 德宏师范高等专科学校《20世纪西方文学》2023-2024学年第二学期期末试卷
- 湛江科技学院《土木工程施工技术》2023-2024学年第二学期期末试卷
- 小升初、小学生满分优秀作文汇编100篇
- 次声波在临床医学及麻醉中的作用 次声波在临床麻醉中的作用
- 加盟招商方案PPT模板
- 中石油HSE培训试题集(共33页)
- 2022年云南省中考数学试题及答案解析
- 喷(烤)漆房VOCs治理设施日常运行台账
- TS16949五大工具:SPC
- 五年级下册-综合实践教案
- 贵州出版社小学五年级下册综合实践活动教案全册
- [方案]隐框玻璃幕墙施工方案
- 设备安装检验批表格
评论
0/150
提交评论