




已阅读5页,还剩57页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
本英文版为内部资料,仅供参考,以中文版为准。The Chinese version of standards has precedence to their English translations which are only for internal reference.中国石油化工总公司SINOPEC 石油化工装置基础设计(初步设计)内 容 规 定Basic Design (Preliminary Design) Definition for Petrochemical PlantSHSG-033-981998-06-29发布Published on June 29. 19981998-07-01实施Implemented As of July 1, 1998中国石油化工总公司 发布ISSUED BY SINOPEC SINOPECBasic Design (Preliminary Design) Definition for Petrochemical PlantSHSG-033-98Compiled by: SINOPEC Beijing Petrochemical Engineering Co.SINOPEC Beijing Design Institute Assisted by: SINOPEC Shanghai Jinshan Petrochemical Engineering CoApproved by: SINOPECImplemented as of: July 1, 19981998BeijingSINOPEC DOCUMENT SINOPEC 1998 Jian Zi No. 257Notice on Printing and Issuing Basic Design (Preliminary Design) Definition for Petrochemical Plant June 29,1998Each Unit Directly under SINOPEC:Now it is approved to issue the Basic Design (Preliminary Design) Definition for Petrochemical Plant (SHSG-033-98) and which comes into force from July 1, 1998. The former Basic Design Definition for Petrochemical Plant (Temporary) (SHSG-033-88) is abolished at the same time.The definition is under the jurisdiction of the Engineering Construction Department. Any questions and comments occurred during the execution shall be timely fed back. SINOPEC Contents1 General 2 Outline3 Process4 Equipment5 General Plan and Transportation6 Plant Layout 7 Piping8 Instrumentation9 Electrical10 Telecommunication11 Civil Work12 Heating, Ventilation and Air Conditioning13 Laboratory and Analysis14 Water Supply and Drainage and Fire Fighting15 Special Subject of the Fire Fighting Design16 Special Subject of Environmental Protection17 Special Subject of Labor Safety and Sanitation18 Budgetary Estimation1 General1.0.1 The purpose of this Basic Design (Preliminary Design) Definition for Petrochemical Plant is compiled to improve the quality of petrochemical engineering design and unify the content and extent of the regulations of basic design document for petrochemical plant. Hereinafter referred as this definition .1.0.2 This definition is suitable for the basic design of the newly built, expanded and revamped petrochemical plants. The basic design for upstream units of chemical fiber plant such as polymer unit and pelletization unit shall in principle follow this definition. For the basic design of utilities and auxiliaries, this definition may also be referred to.1.0.3 The basic design documents shall be compiled with following the feasibility study report, overall design, process design package and basic design information.1.0.4 The extent of basic design documents should meet the requirements for review, ordering of equipment, and detail design made by competent authorities and users.1.0.5 This definition specifies the general requirement for the content of basic design for the petrochemical plant. Users special requirements should be discussed when signing a Contract, if any.1.0.6 This definition doesnt define currently the from of drawings and tables in the basic design documents. Each design institute should compile those referring to its own regulations.1.0.7 This definition is not considered as the basis for design institute to define its internal split of specialty, but may be considered as a reference for the compilation of chapters or sections of design documents. 2 Outline2.0.1Outline means the general description to the basic design of the plant, including general information, products and by-products, main raw materials, production methods and the use of energy, process control, plant location and adjacent conditions, utilities and auxiliary facilities, major technical and economical index, existing problems and suggestions.2.0.2The following key points should be described in the outline, including the construction scale of plant, nature, build-up basis and design basis, guide lines and policies implemented in the design, composition of the plant, design scope and split, annual operation hours, shifts and staffing of the plant, etc. 1) The construction scale of the plant should list the design production capacity for main products or processing raw material amount; and the phased project should list construction scale of each phase.2) The nature of the plant should describe if it is newly built, expanded or revamped (technically revamped).3) The construction basis and design basis should list the name, number of following documents, and the name of approval Unit for documents including feasibility study report and its approval document; environmental impact report (table) and its approval document; the pre-evaluation report in labor, safety and sanitation and its relative approval document; design contract, process design package, etc. for the construction project. For projects with imported technology, the name and number of technical import contract should also be listed. 4) The guidelines and policies implemented in the design should be described, (including the relative national policies and guide lines, and the relative rules and regulations of the construction administration department).5) Describe the composition of the plant, design scope and split. The following table 2. 0.2-1 should be filled as the plant is composed of the units (main items):Table 2.0.2-1List of Units (main items) Units (main items) No.Name of Units (main items)Responsible Design UnitRemark6) It needs to describe the operation hours in one year and operation shifts of the plant, and list the operator members in the following table 2.0.2-2: Table 2.0.2-2List of StaffingNoPost NameAdministratorTechnical PersonOperatorAssistantOtherSub-totalRemarkTotal2.0.3Describe the name, main specifications, output, storage and transportation requirements, transportation methods and destination of all products and byproducts.The warehouse capacities (storage period) for the products also need to be described if which included in the construction project. 2.0.4The name, main specifications and estimated annual consumption of the raw material used for the plant need to be defined as well as the supply source and supply (transportation) method of raw material.Where there is raw material storage warehouse included in the construction project, the storage capacity (storage period) and type of warehousing for the products should be defined. 2.0.5Briefly describe the production methods and the source of technique, and also describe the production process and energy saving methods.2.0.6Briefly describe the automatic control level and the selection of main instrumentation system used for the plant.2.0.7Describe the location of each unit within the battery limit, and the distance and relative position with the adjacent units or facilities.2.0.8Describe the specification or parameter, necessary quantity and source of electric, steam, cold, water, nitrogen, instrument air, compression air and fuel, etc. required for the plant.Introduce the condition reliance for the maintenance of equipment, instruments, electrical equipment, and buildings (structures). 2.0.9 The main technical and economic index of the plant design is as follows. See table 2.0.9.Table 2.0.9Main Technical and Economic IndexNoDescriptionValue & UnitRemark1Design capacity2Consumption index, including:(1) Raw material;(2) Main auxiliary material and catalyst;(3) Fresh water;(4) Circulation cooling water;(5) Electric;(6) Steam;(7) Fuel3Coverage area of plant4Total floorage area of the plant5Drainage amount of wastes 6Transportation capacityIncluding: Carry- in to the plant;Take -out from the plant;7Total staffing8Total energy consumption9Total sets of process equipment, including:(1) Vessel;(2) Heat exchanger;(3) Industrial furnace;(4) Compressor and pump;(5) MachineryIndicate the number of the imported sets from abroad 10Total investment2.0.10 Describe the existing problems and suggestion of solutions3Process3.0.1The basic design documents of the process include: process design basis, process description, list of conditions within battery limits, piping list, list of process equipment, process flow diagram (PFD), utilities flow diagram (UFD), piping and instrumentation flow drawing (PID). If there is the process design package documents, the basic design documents for process section could be simplified appropriately.3.0.2The following contents should be included in the process basic design:1) Plant capacity should include annual production capacity and hourly capacity or raw material treatment capacity, main production lines, yearly operation ratio (including operation hours, continuous or interrupted production) and product plan.2) Plant composition and their name;3) For the property and technical specification of raw material, products and byproducts, should describe generally the physical property, components, unit, index, analysis methods and (or) standard number, etc. for the different materials respectively. For the polymer products, it should be listed out the property, unit, test methods and/or standard No., and the index of products of each brand.4) For the property and technical specification of catalysts and chemicals, should describe generally the physical property, components, unit, index, analysis methods and/or standard No., etc for different materials respectively.5) For the consumption amount of raw material, catalyst, and chemicals and the output of products and byproducts, should describe the material name, unit, quantity (according to consumption or output per tonnage of product, per hour and per year). For the solvents gradually consumed or the catalyst, absorbent, and neutralizing agent gradually degraded in the period of use, if periodical makeup is necessary, then indicate the makeup interval time and makeup quantity, and convert into consumption per tonnage of product. For the catalyst, solvent and dry agent, etc. which are initially filled or periodically replaced, the filling quantity for one time and the interval time for replacement must be indicated, and convert into consumption per tonnage of product.6) Materials and energy specification for the utilities should be described with their state, temperature, pressure and specifications respectively.7) For the utility materials, energy consumption rate and composite energy consumption shall indicate consumption rate and hourly consumption (including normal value and peak value). 3.0.3The following contents should be included in the process description: 1. Production methods, process lines (define the applied process lines and basis), process characteristics (describe the process characteristics of the plant from the aspects of process, equipment, auto-control, operation, and safety, etc.) and the function of each part of the plant.2. Brief description of process flow: describe the sequence of stream through the process equipment and the destination of resultants; main operation technical condition such as temperature, pressure, flow ratio, and main control plan, etc.; the feeding quantity for one time and the period where the operation is interval; the normal operating condition and standby operating condition situation where the operation is continuous or interval; the recovery and use of byproducts and treatment plan for wastes.3. Safety and Sanitation, including:A) Analysis on hazard and harm of the main stream in the process, including:- The fire and explosive stream: the type, quantity, property and service conditions used in the plant.- The toxic stream: the type, quantity, toxicity and service conditions used in the plant.- The corrosion stream: the type, quantity, modality and service conditions used in the plant.- Others: such as burn due to high temperature, dust, falling things, and radioactive materials, etc.B) Safety and sanitary methods in the design according to the production characteristics, including:- Selection of process lines, equipment material;- Devices for pressure relief, anti-explosion, and alarm;- Fire inspection and alarming devices;- Devices for the extinguisher, fire fighting with water, steam, foam, and chemicals, etc.;- Leakage inspection and alarm devices for the flammable gas;- Measures for alarming and shutdown interlock of the production control and the devices for emergency shutdown;- Devices for the ventilation, de-dust, temperature decreasing, and noise removing;- Emergency shower, eye-washer, special labor protection articles and the relevant emergency medical facilities;3.0.4The table of conditions within battery limit should be respectively listed according to raw material, chemicals, products, byproducts, and utilities materials. The contents filled into the condition table within the battery limits should be included: item, name, in and out, state, transportation method, flow (kg/hr.), pipe diameter, temperature (), pressure (Mpa(G) ), etc. 3.0.5The contents should be filled into in the piping table, including: line number, nominal diameter, piping grade, PID drawing number, the beginning and end of line, material name, material state, operation pressure (Mpa(G) ), operation temperature (), pipe class, requirement of heat isolation, and tracing type, etc.3.0.6The contents are included in the process equipment table as follows: item number of process equipment, equipment name, sets (operated and standby), main operation conditions, technical specification, main material and weight, etc.3.0.7The complete production process should be in the Process flow diagram (PFD). The details are as follows: main process equipment (not necessary to draw up the standby equipment), main process piping, operation conditions, control methods, and material data, etc.3.0.8Utilities flow diagram (UFD) should indicate the main equipment requiring and producing materials, the routing of main utility materials, control plan, flow, and technical parameter, etc.3.0.9The following contents are included in the piping and instrument diagram (PID):1) Equipment- All equipment (including standby equipment) with item number and their main specification;- Preliminary scope of supply of the manufacturer who supplies the whole set of machine;- Nozzles of all equipment- Appropriately indicate the internals of non-defined-type equipment, such as tray type, tray number connected to the relative in/out pipes, baffler, defroster, heating or cooling coils, etc.- Indicate the installation height and relative height of equipment if process required.- The driven patterns of rotary equipment such as pump, compressor and blower, etc.- The usage of old equipment.2) Piping- All process and utilities piping connected to the equipment (including that for the start up, shut down and emergency treatment), and mark on the piping and indicate the flow direction with arrow on the pipe. - All valves and its types (except instrument valves).- Mark the dividing line on the piping if the pipe class changed.- Two-phase flow, easy vibration marked on the two-phase flow piping if easily vibrated; flow by gravity marked on the piping if any with special requirement; gradient and liquid sealing height marked on the piping if any; package shape not allowed to exist marked on the piping if required.- Venting, draining out, flushing and washing joints provided for start up or test run.- Tracing piping and jacket pipe with steam, hot water or others and its insulation requirement.- All piping attachments, such as, compensator, flexible hoses, filter, sight glass, trap, limited orifice, blind, removable nipple, and other non-standard fittings.- Number, position, type and structure of sampling points.- Number all relief devices, such as relief valve, explosion diaphragm, breather valve, and clearly explain the design requirement.- Indicate the type and specification of reducers; for revamped or expanded plants, indicate the connecting point to existed equipment or piping.3) Instrument - All on-line instruments, including measurement meters, recorders, regulator, analyzer, etc. Number all instruments; - All control valves;- Interlock relationship;- Instruments supplied with machine need to be marked on the PID.4) Notes to PID- Note to equipment is to describe some special requirements of equipment layout; catalyst and chemicals, and the space for packing loading and unloading. - Note to the piping is to indicate some special requirements in process and piping.- Note to instruments is to indicate some special requirements in instrument installation.3.0.10The following contents should be included in the Piping and instrument diagram for utilities:- Equipment concerned with utilities, i.e. to be used for or supplying the materials (including standby equipment). - All utilities piping, pipe fittings, valves parts, etc. for main pipe, header, branch piping, and in or out of equipment, and needed to make a mark on these piping. - All instruments in the utilities piping except those indicated in process piping and instrument diagram. 4. Equipment4.1Equipment design description4.1.1Equipment (including vessels, heat exchangers, industrial furnaces, compressors and pumps, machinery) design description should generally include: main featured operation and design characteristic parameters and process medium characteristics necessary for understan
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 脊髓损伤病人护理查房
- 塔里木职业技术学院《中华射艺》2023-2024学年第一学期期末试卷
- 宁夏回族自治区中学卫市第五中学2025届初三第二次诊断性考试语文试题含解析
- 辽宁装备制造职业技术学院《生物组学》2023-2024学年第二学期期末试卷
- 景德镇陶瓷职业技术学院《基础医学实验(一)》2023-2024学年第一学期期末试卷
- 上海欧华职业技术学院《国际结算与贸易融资》2023-2024学年第二学期期末试卷
- 云南科技信息职业学院《药物分析》2023-2024学年第一学期期末试卷
- 山西卫生健康职业学院《高级生物信息学》2023-2024学年第二学期期末试卷
- 秦皇岛市重点中学2025届高三下学期研七考试化学试题含解析
- 铜川职业技术学院《花纸设计与排版》2023-2024学年第二学期期末试卷
- 保险信息服务合同范本
- 老年人康乐活动-老年节庆活动组织策划
- 预防接种服务提质行动方案2-4-10
- 绿化带改停车位施工方案
- 绿化苗木组织供应及售后服务方案
- 2023-2024学年浙江省环大罗山联盟高一下学期4月期中物理试题(解析版)
- 合用变压器协议
- 护理人员岗位绩效考核评价标准
- 2024年郑州轨道工程职业学院单招职业适应性测试题库学生专用
- 2024年山西省太原市中考二模地理试卷
- 《通信原理》樊昌信曹丽娜编著第六版课件
评论
0/150
提交评论