




已阅读5页,还剩70页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1,Module und Variations_E,Modules and variations New graphics guidelines Design proposals Roland Berger Hamburg, November 2001,2,Module und Variations_E,Contents Page,A. Standard slides 3 B. Lists (1) Factors, no specific number 7 C. Lists (2) Factors, specific number 13 D. Matrix Factors, comparisons 24 E. Process (1) Factors, steps 35 F. Process (2) Factors, impact 49 G. Process (3) Factors, interlinked 67 Annex: Nine key changes compared to the old standards 73,3,Module und Variations_E,A. Standard slides,4,Module und Variations_E,Methodological competence,Key projects,Industry competence,Professional experience,Languages,Education,Consultant profile: first name, last name,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Position: xxxxxxxxxxxxxxxxxxxxxxxx,German xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Born: xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,Nationality: xxxxxxxxxxxxxxxxxxxxx,Updated: mm/year,5,Module und Variations_E,Organizational chart,6,Module und Variations_E,Organizational chart (including headcount),7,Module und Variations_E,B. Lists (1) Factors, no specific number,8,Module und Variations_E,Lists horizontal (variations),Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,1,2,3,4,9,Module und Variations_E,Lists vertical (variations),1,2,3,4,10,Module und Variations_E,Schedule,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A.,B.,C.,1,2,11,Module und Variations_E,Sets of guidelines,2,3,4,5,Guidelines 1,Guidelines 2,Guidelines 3,Guidelines 4,Guidelines 5,Comments 1,Comments 2,Comments 3,Comments 4,Comments 5,1,12,Module und Variations_E,13,Module und Variations_E,C. Lists (2) Factors, specific number,14,Module und Variations_E,Pyramid (3 or 4 levels),15,Module und Variations_E,Pyramid (5 levels/centered),16,Module und Variations_E,3 factors (interwoven),1,2,3,17,Module und Variations_E,Common ground,18,Module und Variations_E,4 factors (1),19,Module und Variations_E,4 factors (2),20,Module und Variations_E,4 factors (3),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,21,Module und Variations_E,1、24号,所有小的多功厅,华厅,总体费用,1。6万 2、帆厅(搭建,5000去掉) 3、最大的费用,23-25号,搭建:原,6万,3.5万 大草,2万 颁奖,1。5万 少:二万五 4、比较小,午餐,24,26,净价310(280+15%),22,Module und Variations_E,4 factors (3b dynamic),1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,Four dynamic factors,23,Module und Variations_E,6 factors (variation),24,Module und Variations_E,D. Matrix Factors, comparisons,25,Module und Variations_E,Matrix/table (Horizontal/vertical comparison of data variations),1,2,3,4,26,Module und Variations_E,Special types of matrix opportunities/threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,1,2,3,4,27,Module und Variations_E,Special types of matrix pros and cons,1,2,3,28,Module und Variations_E,Special types of matrix controversy,1,2,3,4,29,Module und Variations_E,Special types of matrix conflict/tension (1),30,Module und Variations_E,Special types of matrix conflict/tension (2),31,Module und Variations_E,Special types of matrix bottom up/top down (1),BOTTOM UP,TOP DOWN,.,.,32,Module und Variations_E,Special types of matrix bottom up/top down (2),.,.,BOTTOM,UP,TOP,DOWN,1,2,33,Module und Variations_E,Special types of matrix equilibrium,34,Module und Variations_E,Special types of matrix imbalance,35,Module und Variations_E,E. Process (1) Factors, steps,36,Module und Variations_E,Processes,1,2,3,37,Module und Variations_E,Process/phases,1,2,3,4,5,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,1,2,3,4,38,Module und Variations_E,Cycles (1) (color presentation),39,Module und Variations_E,Cycles (2),40,Module und Variations_E,Spirals (orthogonal),1,2,41,Module und Variations_E,Hurdles,42,Module und Variations_E,Resistance/obstacles,1,2,5,7,3,4,6,43,Module und Variations_E,Filters,1,2,4,5,3,6,44,Module und Variations_E,Change of mindset/direction,1,2,3,4,45,Module und Variations_E,Nodes/interfaces,1,4,3,7,5,6,8,9,2,46,Module und Variations_E,Pressure,1,2,47,Module und Variations_E,Increase/decrease,1,2,3,4,5,6,7,8,48,Module und Variations_E,Various types of brackets (to be used instead of block arrows),1,2,3,4,5,6,7,8,9,10,11,49,Module und Variations_E,F. Process 2 Factors, impact,50,Module und Variations_E,Consequences (1),.,.,.,.,.,.,51,Module und Variations_E,Consequences (1a),.,.,.,.,.,.,52,Module und Variations_E,Consequences (2),53,Module und Variations_E,Consequences (3),.,.,.,.,54,Module und Variations_E,Consequences (4),.,.,.,.,1,2,55,Module und Variations_E,Impact (3 factors),QUALITY,TIME,COST,56,Module und Variations_E,Impact (4 and 6 factors),57,Module und Variations_E,Impact (4 factors),Factor 3,Factor 2,Factor 4,Factor 1,Generic description of the 4 factors,58,Module und Variations_E,Impact (5 factors),Factor 3,Factor 2,Factor 4,Factor 5,Generic description of the 5 factors,Factor 1,59,Module und Variations_E,Impact (6 factors),Factor 2,Generic description of the 6 factors,Factor 3,Factor 1,Factor 5,Factor 4,Factor 6,60,Module und Variations_E,Impact (7 factors),Factor 3,Generic description of the 7 factors,Factor 2,Factor 6,Factor 4,Factor 5,Factor 7,Factor 1,61,Module und Variations_E,Impact (8 factors),Factor 3,Generic description of the 8 factors,Factor 2,Factor 6,Factor 7,Factor 4,Factor 5,Factor 1,Factor 8,62,Module und Variations_E,6 success factors,Impact and result (1),63,Module und Variations_E,Impact and result (2),5 success factors,64,Module und Variations_E,Vision,Vision,65,Module und Variations_E,Action/reaction,66,Module und Variations_E,Value chain,Customer,Supplier,Development,Production,Sales,Distribution,Company,67,Module und Variations_E,G. Process 3 Factors, interlinked,68,Module und Variations_E,Action/reaction (1),69,Module und Variations_E,Action/reaction (2) (transparent color presentation),70,Module und Variations_E,Interaction,1,2,3,71,Module und Variations_E,Jigsaw puzzle,72,Module und Variations_E,Spiral,73,Module und Variations_E,Annex: Nine key changes compared to the old standards,74,Module und Variations_E,Do not use block arrows,Use variations instead,1,2,3,4,1,2,3,4,BACKUP,New Content design Key changes regarding lean, linear, literal“,Do not use shading or borders,Instead, use unframed colored shapes in shades of key blue, for emphasis only,Do not use ovals,Instead, use AutoShapes with corners completely rounded off,Do not use stickers with lines,Instead, use upper case stickers (13 point), (key blue shade 1), positioned in the header area,Do not put numbers in circles,Instead,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 通信行业安全生产
- 讲师培训班课程
- 商丘蓝球场施工方案
- 吉林工业职业技术学院《中国现代文学名家解读》2023-2024学年第二学期期末试卷
- 浙江科技学院《大学生职业素养与就业指导》2023-2024学年第二学期期末试卷
- 郑州工商学院《大型数据库应用实训》2023-2024学年第二学期期末试卷
- 山西中医药大学《外国文学上》2023-2024学年第二学期期末试卷
- 新疆天山职业技术大学《工程质量事故分析》2023-2024学年第一学期期末试卷
- 2025至2031年中国木篮行业投资前景及策略咨询研究报告
- 武汉设计工程学院《误差理论与数据处理》2023-2024学年第一学期期末试卷
- 排水沟铸铁篦子规格
- 中学学校各项安全资料汇编
- 部编版 八年级下册语文 第五单元复习课件
- 新修订版《未成年人保护法》亮点解读课件
- 六年级语文下册阅读及参考答案(12篇)
- 消防月九小场所消防安全检查表
- 个人教师述职报告PPT模板下载
- 家鸽的解剖课件
- GB 7101-2022食品安全国家标准饮料
- GB/T 5750.10-2006生活饮用水标准检验方法消毒副产物指标
- GB/T 21255-2007机动车测速仪
评论
0/150
提交评论