平昌县教育文化体育产业园“二馆二中心”建设项目物有所值(VFM)评价报告四川智库策划咨询有限公司二〇一六年八月
目录TOC\o"1-2"\h\u第一章项目基础信息 附件6:项目全周期财务费用测算分析表借款总额 48,000.00 借款利率 8.33%项目建设期还款期合计2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年期初借款余额48,000.0044,800.0041,600.0038,400.0035,200.0032,000.0028,800.0025,600.0022,400.0019,200.0016,000.0012,800.009,600.006,400.003,200.00本期还款额3,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.003,200.0048,000.00本年应付利息3,998.403,731.843,465.283,198.722,932.162,665.602,399.042,132.481,865.921,599.361,332.801,066.24799.68533.12266.5631,987.20本年还本付息额7,198.406,931.846,665.286,398.726,132.165,865.605,599.045,332.485,065.924,799.364,532.804,266.243,999.683,733.123,466.5679,987.20期末借款余额44,800.0041,600.0038,400.0035,200.0032,000.0028,800.0025,600.0022,400.0019,200.0016,000.0012,800.009,600.006,400.003,200.00-备注:在政府传统采购模式下,全部投资额将采用银行贷款的方式筹集,贷款利率为8.33%(商业银行长期基准利率上浮70%),贷款期限为15年,采用等额本金的方式,从运营期开始还本。
附件7:项目维护成本测算表项目2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计工资及福利费180.00180.00180.00180.00180.00180.00180.00180.00180.00180.00180.00物业成本188.00188.00188.00188.00188.00188.00188.00188.00188.00188.00188.00设备维修费116.00116.00116.00116.00116.00116.00116.00116.00116.00116.00116.00运营杂费15.0015.0015.0015.0015.0015.0015.0015.0015.0015.0015.00互联网平台运维费25.0025.0025.0025.0025.0025.0025.0025.0025.0025.0025.00合计-524.00524.00524.00524.00524.00524.00524.00524.00524.00524.00524.005,764.00备注: 1、本项目包括人员工资、保险及福利费,年人工成本为180万元; 2、物业成本包括安保费用、保洁费用、绿化费用合计年物业成本为188万元; 3、维修费包括设备维修和建筑维修,建筑维修按固定资产原值的0.2%提取; 4、运营杂费主要为办公费、电话费等管理费用,合计15万; 5、互联网平台搭建费主要包括网站的建设、微博、微信的推广费等,预计年成本为25万元; 6、以上数据由委托人提供。
附件8:初始PSC计算表项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计123456789101112131415建设成本19,687.757,470.757,470.7513,370.7548,000.00资本性收益-建设净成本19,687.757,470.757,470.7513,370.7548,000.00财务费用3,998.403,731.843,465.283,198.722,932.162,665.602,399.042,132.481,865.921,599.361,332.801,066.24799.68533.12266.5631,987.20维护成本--524.00524.00524.00524.00524.00524.00524.00524.00524.00524.00524.005,764.00第三方收入200.00200.00200.00200.00200.00200.00200.00200.00200.00200.00200.002,200.00运营维护净成本324.00324.00324.00324.00324.00324.00324.00324.00324.00324.00324.003,564.00初始PSC23,686.1511,202.5910,936.0316,569.473,256.162,989.602,723.042,456.482,189.921,923.361,656.801,390.241,123.68857.12590.5683,551.20备注:初始PSC=(建设成本-资本性收益)+(运营成本-第三方收入)
附件9:竞争性中立调整值测算表各项税金2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计123456789101112131415增值税进项2,165.65821.78821.781,470.7820.6420.6420.6420.6420.6420.6420.6420.6420.6420.6420.64销项--712.50744.36777.79812.85849.63888.21928.68971.131,015.671,062.391,111.39应交增值税-2,165.65-2,987.44-3,809.22-5,280.00-4,588.14-3,864.42-3,107.27-2,315.07-1,486.08-618.51289.53950.49995.031,041.751,090.75实际缴纳增值税289.53950.49995.031,041.751,090.754,367.55城建税14.4847.5249.7552.0954.54218.38教育费附加8.6928.5129.8531.2532.72131.03地方教育附加费5.7919.0119.9020.8321.8287.35合计318.481,045.541,094.531,145.921,199.834,804.31备注1:本项目按照文化产业6%的税率征收增值税。备注2:项目公司无建设资质,一般采用发包方式建设,取得特许经营权所支付的建设费用,增值税税率为11%。备注3:运营期内所发生的人工成本,不作为进项抵扣。备注4:本项目涉及的增值税税率以税务局最终认定的结果为准。备注5:以上金额按不含税处理。
附件10:风险承担成本测算表项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计123456789101112131415可转移风险160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.002,400.00可分担风险32.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.00480.00不可转移风险3.333.333.333.333.333.333.333.333.333.333.3336.68风险承担成本合计192.00192.00192.00192.00195.33195.33195.33195.33195.33195.33195.33195.33195.33195.33195.332,916.68备注: 风险承担成本按照比例法测算 1、可转移风险=建设成本*风险比例5%,政府承担自留风险比例为10%; 2、可分担风险=建设成本*风险比例1%,社会资本方和政府各承担50%; 3、不可转移风险=维护成本*风险比例7%,全部由政府方承担。
附件11:PSC值计算表
项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计折现年限123456789101112131415初始PSC23,686.1511,202.5910,936.0316,569.473,256.162,989.602,723.042,456.482,189.921,923.361,656.801,390.241,123.68857.12590.5683,551.20竞争性中立调整值318.481,045.541,094.531,145.921,199.834,804.31风险承担成本192.00192.00192.00192.00195.33195.33195.33195.33195.33195.33195.33195.33195.33195.33195.332,916.68合计23,878.1511,394.5911,128.0316,761.473,451.493,184.932,918.372,651.812,385.252,118.692,170.612,631.122,413.552,198.381,985.7291,272.19折现率4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%现值22,762.7710,354.949,640.3313,842.362,717.252,390.272,087.911,808.591,550.801,313.151,282.481,481.951,295.911,125.24968.9274,622.88备注: 1、PSC值是以下三项成本的全生命周期现值之和: (一)参照项目的建设和运营维护净成本; (二)竞争性中立调整值; (三)项目全部风险成本。 2、依据财政部《政府和社会资本合作项目财政承受能力论证指引》(财金[2015]21号)第十七条:“年度折现率应考虑财政补贴支出发生年份,并参照同期地方政府债券收益率合理确定。” 结合本项目实际,由于本项目地方政府并未发债,折现系数参考国债收益率、银行长期贷款基准利率,行业折现率等因素综合确定折现系数为4.9%。
附件12:政府运营补贴计算表项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计折现年限123456789101112131415年均建设成本4,309.094,309.094,309.094,309.094,309.094,309.094,309.094,309.094,309.094,309.094,309.0947,400.00合理利润率8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%4,653.824,653.824,653.824,653.824,653.824,653.824,653.824,653.824,653.824,653.824,653.8251,192.00折现率4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%应补贴的建设成本5,911.356,201.016,504.866,823.607,157.957,508.697,876.628,262.578,667.449,092.149,537.6683,543.89年维护成本524.00524.00524.00524.00524.00524.00524.00524.00524.00524.00524.005,764.00合理利润率8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%8.00%应补贴的运营成本565.92565.92565.92565.92565.92565.92565.92565.92565.92565.92565.926,225.12社会资本获得的收入6,477.276,766.937,070.787,389.527,723.878,074.618,442.548,828.499,233.369,658.0610,103.5889,769.01第三方收入--200.00200.00200.00200.00200.00200.00200.00200.00200.00200.00200.002,200.00政府运营补贴6,277.276,566.936,870.787,189.527,523.877,874.618,242.548,628.499,033.369,458.069,903.5887,569.01备注: 1、本项目采用可行性缺口补助模式,政府承担部分付费责任。 当年运营补贴支出数额=项目全部建设成本×(1+合理利润率)×(1+年度折现率)n/财政运营补贴周期+年度运营成本×(1+合理利润率)-当年使用者付费金额 2、社会资本方获得的收入=应补贴的建设成本+应补贴的运营成本 3、年度折现率应考虑财政补贴支出发生年份,并参照同期地方政府债券收益率合理确定。结合本项目实际,由于本项目地方政府并未发债,折现系数参考国债收益率。银行长期贷款基准利率,行业折现率等因素综合确定折现系数为4.9%。 4、通过现金流对比分析综合确定合理利润率为8%,详细见现金流分析表。
附件13:政府自留风险测算表项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计123456789101112131415可转移风险160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.00160.002,400.00政府承担的可转移风险16.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.00240.00可分担风险32.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.0032.00480.00政府应承担的可分担风险16.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.0016.00240.00不可转移风险3.333.333.333.333.333.333.333.333.333.333.3336.68政府自留风险32.0032.0032.0032.0035.3335.3335.3335.3335.3335.3335.3335.3335.3335.3335.33516.68备注: 1、可转移风险=建设成本*风险比例5%,政府承担的自留风险比例为10%; 2、可分担风险=建设成本*风险比例1%,社会资本方和政府各承担50%; 3、不可转移风险=维护成本*风险比例7%,全部由政府方承担。
附件14:PPP值计算表项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计折现年限123456789101112131415股权支出600.00600.00运营补贴6,277.276,566.936,870.787,189.527,523.877,874.618,242.548,628.499,033.369,458.069,903.5887,569.01风险承担32.0032.0032.0032.0035.3335.3335.3335.3335.3335.3335.3335.3335.3335.3335.33516.68配套投入-财政支出责任632.0032.0032.0032.006,312.616,602.266,906.117,224.857,559.217,909.958,277.878,663.839,068.699,493.409,938.9188,685.69折现率4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%4.90%现值602.4829.0827.7226.434,969.714,954.964,940.894,927.484,914.704,902.514,890.904,879.824,869.264,859.204,849.6154,644.75说明: 1、根据财金[2015]167号文第二十七条: “PPP值可等同于PPP项目全生命周期内股权投资、运营补贴、风险承担和配套投入等各项财政支出责任的现值, 参照《政府和社会资本合作项目财政承受能力论证指引》(财金〔2015〕21号)及有关规定测算。 2、依据财政部《政府和社会资本合作项目财政承受能力论证指引》(财金[2015]21号)第十七条:“年度折现率应考虑财政补贴支出发生年份,并参照同期地方政府债券收益率合理确定。” 结合本项目实际,由于本项目地方政府并未发债,折现系数参考国债收益率、银行长期贷款基准利率,行业折现率等因素综合确定折现系数为4.9%。
附件15:项目现金流分析表项目名称2016年2017年2018年2019年2020年2021年2022年2023年2024年2025年2026年2027年2028年2029年2030年合计现金流入项目收益--6,477.276,766.937,070.787,389.527,723.878,074.618,442.548,828.499,233.369,658.0610,103.5889,769.01现金流出建设投资19,087.757,470.757,470.7513,370.7547,400.00运营成本--524.00524.00524.00524.00524.00524.00524.00524.00524.00524.00524.005,764.00财务费用-税金支出318.481,045.541,094.531,145.921,199.834,804.31税前现金净流量-19,087.75-7,470.75-7,470.75-13,370.755,953.276,242.936,546.786,865.527,199.877,550.617,600.067,258.957,614.837,988.148,379.7531,800.70折现率4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%现值-18,261.56-6,838.02-6,542.04-11,201.804,771.684,787.264,802.964,818.784,834.734,850.794,671.224,268.454,283.904,299.404,314.967,860.70调整所得税397.41469.82545.79625.47709.06796.74881.49961.451,061.551,166.561,276.728,892.06税后现金净流量-19,087.75-7,470.75-7,470.75-13,370.755,555.865,773.116,000.996,240.056,490.816,753.876,718.576,297.506,553.276,821.587,103.0322,908.64折现率4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%4.52%现值-18,261.56-6,838.02-6,542.04-11,201.804,453.144,426.984,402.554,379.784,358.594,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- DB32/ 4576-2023南四湖流域(江苏区域)水污染物综合排放标准
- DB31/T 997-2016城市道路交通状态指数评价指标体系
- DB31/T 329.6-2019重点单位重要部位安全技术防范系统要求第6部分:中小学、幼儿园、托育机构
- DB31/T 1364-2022检验检测机构能力验证技术规范
- DB31/T 1300-2021跆拳道场所运营服务规范
- DB31/T 1213-2020金属热处理回火工序单位产品能源消耗限额
- DB31/T 1173-2019咖啡厅(馆)等级划分与评定
- DB31/ 1098-2018畜禽养殖业污染物排放标准
- 2025电子产品采购合同
- 自动扶梯在使用过程中的能耗分析与节能措施考核试卷
- 2025至2030年中国智能学习机行业投资前景及策略咨询研究报告
- (高清版)DG∕TJ 08-7-2021 建筑工程交通设计及停车库(场)设置标准
- 教育咨询保密协议书
- 无房无车离婚协议书
- 南师附中高三数学备忘录及答案详解
- 2024年湖北省中考地理生物试卷(含答案)
- 巴蜀文化(课堂PPT)课件
- 质量部组织架构
- 工学结合一体化课程教学设计的编写(课堂PPT)
- 电气装置安装工程接地装置施工及验收规范——50169-2006
- 水电站自动化运行专业术语
评论
0/150
提交评论