




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Slide
1©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Lecture
2.4
Core
System
–
Control
&
Communications
and
Wayside
Equipment
RailTEC@Illinois
High
Speed
Rail
EngineeringTC
Kao,
Ph.D.,
P.E.Director
&Professor-
High
Speed
Rail
SystemsRailroad
Transportation&
Engineering
Center(RailTEC)Slide
2©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedControl
&
Communication
System
RailTEC@IllinoisSlide
3©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedControl
&Communication
RailTEC@Illinois
Depot
control
room
DepotSlide
4©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedControl
Centers
RailTEC@IllinoisSlide
5©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Control
Centers
RailTEC@Illinois•
Operation
Control
Center
(Centralized
Traffic
Control,
CTC)•
Station
Control
Room
(Local
Control)•
Depot
Control
Room
(Local
Control)Slide
6©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedTypical
Arrangement
of
CTC
Center
RailTEC@IllinoisSlide
7©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedTHSRC
seating
plan
RailTEC@IllinoisSlide
8©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Functions
of
CTC
RailTEC@Illinois•
Route
control•
Traffic
coordination•
Rolling
stock
management•
Passenger
information
serviceSlide
9©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
THSRC
Organization
RailTEC@Illinois•
Chief
Controller,
supported
by:
–
Timetable
Controller
–
Train
Controller
(3
each)
–
Train
Crew
&
Trainset
Utilization
Controller
–
Facility
Controller
–
Power
Controller
–
Passenger
Services
Controller•
Mimic
Board,
Universal
Console,
Communications,
Alarms•
Incident
Control
RoomSlide
10©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedCommunication
systems
RailTEC@IllinoisSlide
11©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Communication
sub-systems
RailTEC@Illinois1.
Data
transmission2.
Telephones3.
Radio4.
Public
address
system
(PA)5.
Closed
circuit
television
(CCTV)6.
Time
distribution7.
Passenger
information
system
(PIS)8.
Supervisory
control
and
data
acquisition9.
Plant
monitoring
&controlSlide
12©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedData
Transmission
backbone
RailTEC@Illinois©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedCCTV
–
Station
coverage
RailTEC@IllinoisPlatformsStation
Control
RoomTraction
Buildings
Slide
13Portals/Emergency
ExitsSelectedImagesto
OCC
Fiber
Optic
SystemSlide
14©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedPA-
station
coverage
RailTEC@IllinoisSlide
15©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedWayside
disaster
warning
system
RailTEC@IllinoisSlide
16©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Disasters
RailTEC@Illinois•
Earthquake•
Strong
wind•
Heavy
rainfall•
Flood•
Landslide•
Rock
fall•
Avalanche•
Vehicular
intrusionSlide
17©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Disaster
prevention
RailTEC@Illinois•
Strengthen
infrastructure•
Installing
protection
measures•
Installing
disaster
warning
systems•
Operation
of
procedures•
TrainingSlide
18©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedProtective
Systems
RailTEC@IllinoisSlide
19©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedDisaster
Warning
Systems
RailTEC@IllinoisSlide
20©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
THSRC
Disaster
Warning
Systems
RailTEC@Illinois•
Earthquake
–
51
(11
Main
+
40
Sub)•
Strong
Wind
–
21•
Heavy
Rain
–
18•
Flood
–
42•
Landslide
–
60•
Rock
Fall
–
96•
Intrusion
of
Vehicles
–
34Slide
21©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
ReservedThank
you
for
your
attention
RailTEC@IllinoisSlide
22©
2013
University
of
Illinois
at
Urbana-Champaign.
All
Rights
Reserved
Midterm
Exam
RailTEC@Illinois1.
Purposes
of
exams:
a.
To
assist
students
in
learning
b.
To
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中药配方颗粒行业标准及市场竞争格局深度研究报告
- 热爱劳动主题班会活动方案(模板)
- 海洋生态保护与修复政策在海洋保护区建设中的应用报告
- 小学体育教学设计方案(模板)
- 法制教育实践活动方案(模板)
- 健康脱贫大排查工作部署与实施
- 护理骨干个人工作总结
- 发热病人护理个案汇报
- 2025建筑工程设计合同模板
- 2025年直播电商行业主播影响力与社群营销策略研究报告
- 品质管理培训资料
- 成都国资委采购管理办法
- 2025年物业管理师考试试卷及答案
- 面向信息意识培养的高中信息技术大单元教学设计与实施
- 林业生物技术课件
- 印章管理规定培训
- 服务外包合同服务外包协议
- 定额〔2025〕1号文-关于发布2018版电力建设工程概预算定额2024年度价格水平调整的通知
- 2018年最新房屋买卖合同(适用个人)(精品模板)
- 三年级数学《重量单位的换算口算题(共60道)》专题训练
- 《普通混凝土配合比设计规程》JGJ55-2011
评论
0/150
提交评论