内容课件成果_第1页
内容课件成果_第2页
内容课件成果_第3页
已阅读5页,还剩4页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Drafted Checked Reviewed Approved Modification-BFANGCHENGGANGNUCLEARPOWER PLANT PHASE I (21000MW)文件编DOC. LMA-220VDCPOWERSUPPLYSYSTEM MANUAL CHAPTER 6 CONTROL工程Project文件类Document子项Sub-Item设计阶EngineeringSBDocument A: B:C:深圳中广核工程设计有限公司 NationalAgradeengineeringCertificationNO:NationalAgradeengineeringC

2、ertificationNO:内部编码Internal CP0905-DE-GN-This document is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permission of CNPDC 本文件之产权属于中广核工程设文文件种类LMA-220VDCLMA-220VDCPOWERSUPPLYSYSTEMMANUALCHAPTER6B版本记REVISION版日状编Drafted校Checked审Reviewed批Approve

3、d修改说Modification-AFirstFANGCHENGGANGNUCLEARPOWER PLANT PHASE I (21000MW)LMA-220VDCPOWERSYSTEMMANUALCHAPTER6 文件修改记版日章页修改范围及依AB2010-2011-8-FirstLMA-220VDCLMA-220VDCPOWERSUPPLYSYSTEMMANUALCHAPTER6B HYPERLINK l _TOC_250008 HYPERLINK l _TOC_250007 CONTROL HYPERLINK l _TOC_250006 LOGIC HYPERLINK l _TOC_25

4、0005 ANALOG HYPERLINK l _TOC_250004 COMPUTERIZEDCONTROLANDINFORMATIONAVAILABLETOTHE HYPERLINK l _TOC_250003 CONVENTIONALCONTROLANDINFORMATIONAVAILABLETOTHE HYPERLINK l _TOC_250002 HYPERLINK l _TOC_250001 POWERSUPPLYFAILURE HYPERLINK l _TOC_250000 LMA-220VDCLMA-220VDCPOWERSUPPLYSYSTEMMANUALCHAPTER6Re

5、vControl ManualcontrolsareprovidedforsystemThe lists of control and instrumentation components are given in the charger and DC switchboard operation and maintenance manuals.Logic SeeAnalogSeeComputerizedcontrolandinformationavailabletotheComputerizedalarm See appendix.Computerizedcontrolandinformati

6、on See appendix.ConventionalcontrolandinformationavailabletotheConventionalalarm Not applicable.Conventionalcontrolandinformation Not applicable.Operating Aftertheinitialstartup,nonormaloperationisrequired. The following are adjusted on initial startup:groundfaultdetectoralarmvoltagesensingrelaycurr

7、entsensingrelayThissystemisnormallyalwaysinOperating When the “switchboard fault” alarm appears, the operator shall locally determine the nature of the fault and perform the appropriate intervention.PowersupplyfailureLossof48VDCcontrolpowerKICTrippingofthetransformersupplybreakerbytheautomaticdevice

8、220V AC switchboard-mounted annunciator light operation. 6.7.2LossofLLE380VACpowersupplycausesnonoperationofLMAswitchboard. Loss of LNE 220V AC power supply causes non operation of the portable signal generator used for ground fault location.Lossof220VAC(on003JA)causesnonoperationofthegroundfaultloc

9、ation. Recovery of 48V DC restores KIC inputs, annuciator light operation and transformer supply breaker tripping ability by the automatic device circuit.RecoveryofLNE220VACrestoresoperationoftheportablesignalgenerator. Recovery of 380VAC restores operation of LMA switchboard.LMA-220VDCLMA-220VDCPOWERSUPPLYSYSTEMMANUALCHAPTER6Rev6.4.1ComputerizedIDLCD001XKGROUNDY-A-OUTGO.BREAKERY-A-XLMAOVERCURRENTY-A-X

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论