1、The stage of the project costmanagementAbstractProject cost management is the basic contents to determine reasonable and effective control of the project cost. Described the current stage of the project cost management situation on the strengthening of the various stages of construction cost managem
2、ent of the importance of and raised a number of key initiatives.Keywords: cost of the construction project cost management status investment decision phase of the design phase of the implementation phase of the cost management in a market economy,Even under the WTO and Chinas accession to the world
3、community, Chinas construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the super three is still widespread and that
4、 eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decisi
5、on stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projects have a reasonab
6、le control on the scope and cost of the approved limits.Engineering and cost management work of the current status of project cost management system was formed in the 1950s, 1980s perfect together. Performance of the country and directly involved in the management of economic activities. Provisions
7、in the design stage to different estimates or budget preparation as well as government; Nothing relevant departments to formulate a budget, content, methods and approval, the budget will provide the fixed cost of equipment and materials and fixed price of the budget preparation, approval, management
8、 authority, and so on.With the historical process, after recovery, reform and development, formed a relatively complete budget estimate of quota management system. However, as the socialist market economic development, the systems many problems have also exposed. Generally speaking, the budget estim
9、ate is based on direct participation in the management of national economic activity as a precondition. enterprise is not the actual economic entities. Due to the characteristics of the planned economy, and, at the time under the conditions of productivity, will inevitably become a shortage in the e
10、conomy.In severe shortage of commodities under the conditions, as long as a certain level of investment, will be certain outputs. In this environment, the project planning and technical argumentation there can be no economic analysis. State control of the project cost constitute key factors equipmen
11、t and materials prices, wages and taxes of artificial distribution. In this relatively stable economic environment, the budget estimate for the system approved project cost, help the government to carry out investment plans to play a major role.As the socialist market economic system established, re
12、quires us to predict project investment and control. In recent years, international investment project developed to the requirements of prior pre-control and in the middle of control. China, the traditional practice in an objective light on the cause decision-making, implementation heavy, light the
13、economy and technology,First, the consequences of victimization,Due to the technical personnel of the project technical and economic concepts and a weak awareness of cost control, cost management makes the quality difficult to raise. Project Cost control is difficult to achieve long-term goals.Secon
14、d, the various stages of the project management view of the above circumstances, My first academia in the 1980s made the whole process of cost management and control concept, building departments will study the feasibility of projects and the budgets and final accounts to two extended at the request
15、 of the corresponding regulations put our cost management concepts and methods referred to a new height.Our task now is to be modern and cost management in line with Chinas national conditions of the market economy system goal, learn from the advanced experience of the developed countries, and estab
16、lish sound market economic laws of project cost management system, efforts to increase the project cost levels. An investment decision-making phase of the project cost management construction project investment decision-making stage is proposed project proposals; conduct a feasibility study to deter
17、mine investment estimation and the final preparation of design task. At this stage, the projects technical and economic decision-making, of the construction project cost of the project after the completion of the economic benefits have a decisive influence, The construction cost is an important stag
18、e control.Chinas current stage of the project cost for the project management for the purpose of clearing price, and focusing only on the construction process of cost control, neglected before the start of the project investment decision-making stage of cost control. Investment decision-making phase
19、 of investment projects is estimated an important basis for decision-making. It has a direct impact on national economic and financial analysis of the results of the reliability and accuracy. Because of this phase is the preliminary work of projects, the information can not be fully, comparable work
20、s more or less that information accumulated relatively small, estimated inadequate and unscientific. Makes project cost management and cost workers is difficult at this stage do something.The various stages of the project cost control in the decision-making phase project cost control. Right project
21、planning phase of the cost, many owners have the wrong understanding that the lower the cost the better. Cost control is not a unilateral issue, and should be a number of factors, a combination of practical, comprehensive consideration. The construction project investment decision-making stage, the
22、projects technical and economic decision-making, Cost of the project after the completion of the project and the economic benefits, with a decisive role in project cost control is an important stage, rationally define and control the direction of the project cost of accurate positioning and building
23、 Optimization guiding role.In the decision-making phase of the most important is to do a good job feasibility study, the work is done well, returns on investment and can form a good proportion. Otherwise, invest more, less effective, resulting in loss of control and waste of investment.At present, s
24、ome of the projects planned the owners of departure from the subjective desires of a feasibility study on the lack of scientific proof. Feasibility Study untrue, false or engineering functions obtaining the approval of their superiors, actually put into the feasibility study will be awarded in the s
25、tudy for the project after the smooth functioning buried a lot of hidden problems, lead to insufficient follow-up funds for the project and had to extend the time limit so that the project could not have planned the use of cost-effective, even become hopeless completion of the beard works.Therefore,
26、 in order to phase in the investment decision-making effectively control construction costs, we must do the following aspects:Implementation of the construction project and corporate accountability, Construction of the project from planning to implementation of the entire process and the use of the
27、funds to repay responsibilities to the people. in addition to establishing a legal system and the project supervision matching mechanism by the departments in charge of the industry and supervision departments for setting up a monitoring group to oversee the use of funds.A realistic approach to mark
28、et analysis, to avoid the blindness of the project decision-making, reduces and reduces investment risk. Fully consider building projects in the future market competitiveness, design task more scientific and reliability.Capital financing must have a formal commitment document, the parties must do in
29、vestment funds in place, and funds must have documents to ensure that the project can be approved after the scheduled implementation. To the various loan conditions should be carefully analyzed to minimize the burden of interest and repayment pressure.To strengthen the engineering geology, hydrology
30、, geology and land, water, electricity, transport, environmental projects such as external conditions for the work of depth to make the investment estimate there are sufficient grounds.Taking extensive investigation and research, comparison of similar projects, seriously functional analysis, multi-p
31、rogram comparison and choice. After full technical appraisal and economic evaluation, and the final technologically advanced, functional and reliable. Reasonable economic projects, thus calculate a more accurate and realistic estimation of the amount of investment, so that the project cost from the start positioning in a more reasonable level.The design phase of the project cost control for a long time, Chinas building control very effective, - investment projects is not uncommon, this will affect owner
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 教育领域的安全管理创新与实践
- 科技助力乳腺疾病早期发现与干预
- 2025年度个人与企业租车合作保障协议3篇
- 2025版个人住宅电梯公寓租赁管理合同
- 2025年度个人贷款合同解除条件合同范本3篇
- 2025年度个人住房抵押贷款延期还款合同3篇
- 2025年度个人土地租赁合同范本7篇
- 学前儿童科技美术教育的政策支持与实施策略
- 2025年新型环保橱柜销售服务合同范本4篇
- 珠海广东珠海市公安局交通警察支队金湾大队招聘辅警2人笔试历年参考题库附带答案详解
- 游戏综合YY频道设计模板
- 高中数学知识点全总结(电子版)
- 小学科学项目化作业的设计与实施研究
- GB/T 10322.7-2004铁矿石粒度分布的筛分测定
- 2023新译林版新教材高中英语必修一重点词组归纳总结
- 苏教版四年级数学下册第3单元第2课时“常见的数量关系”教案
- 弘扬中华传统文化课件
- 基于协同过滤算法的电影推荐系统设计
- 消防应急预案流程图
- 《数据科学与大数据技术导论》完整版课件(全)
- 人教统编版高中语文必修下册第六单元(单元总结)
评论
0/150
提交评论