1、TABLE OF CONTENTS 目录1GENERAL 概述31.11.21.3Pure目的3Responsibility职责3References and drawings参考文件31.3.11.3.21.3.3List of Equipment 设备. 3Engineering Drawings工程图纸5Electrical Completion Inspection Test Record 电气完工测试. 72345SYSTEM DESCRIPTION系统描述8SCOPE 范围8PRE-REQUISITIES 前提条件8EXECUTION 执行95.15.25.35.4Preparat
2、ion checks 预先检查9Safety precautions安全保护措施9Fieldnel Deployment部署10mising by Vendors Service Represenive供应商检查106COMMISING PROCEDURES 调试程序106.16.2Voltage of Outgoing Feeder Breaker 分电箱断路器输出电压11Check Emergency Lights 测试应急照明1178TABLES 表格11TEST ACCEPTANCE 测试验收29Pakge 2 of 291GENERAL 概述1.1Pure 目的The pure of
3、 this procedure is to give clear instructions for the activities to be carried out tocomplete the commising of the described system.这个程序的目的是为了给予工作明确的指示,完成所述系统的调试。1.2Responsibility 职责Any updates/revis of thiswill be the responsibility of the Commising Team.任何更新/文件的修改都是调试团队的义务。Any deviations from this
4、 procedure will have to beed.程序任何的偏差都需In case of major changes下来。he work describedhis procedure(e.g. reduced scope of operatingtests to be performed), a reviof the procedure is required.假如发生变化(例如:减少操作测试),这个程序的工作必须修改程序版本。1.3References and drawings 参考文件1.3.1List of Equipment 设备Pakge 3 of 29No.Descript
5、ion 描述Location 位置1480V Laundryanel(4LP) 480V 洗衣间配电板(4LP)Laundry Room(110)(110)2480V Galleyanel(4GP) 480V 厨房间配电板(4GP)Galley AHU(341)厨房空调间(341)3480V Workshopanel(4WP)机修间 480V 配电板(4WP)Mechanical Workshop机修间4480V Electrical Workshopanel(4ETLP) 480V 电工间配电板(4ETLP)Electrical Workshop电工间5230V Galleyanel(2GP
6、) 230V 厨房设备配电板(2GP)Galley AHU(341)厨房空调间(341)6230V Lighting Panel(1L) 230V 照明分电箱(1L)Air Compressor Room D空压机室(下)7230V Lighting Panel(2L) 230V 照明分电箱(2L)Electrical Workshop电工间8230V Lighting Panel(3L) 230V 照明分电箱(3L)Main Deck Cable Trunk(107)主甲板电缆通道(107)9230V Lighting Panel(4-PL) 230V 照明分电箱(4-PL)Change R
7、oom(109)更衣间(109)10230V Lighting Panel(4-SL) 230V 照明分电箱(4-SL)Man Change Room(101)男更衣间(101)11230V Lighting Panel(5-PL) 230V 照明分电箱(5-PL)Quarter 2nd Level Fr.15.5 Port Innassage生活楼 2 层#15.5 左内走道12230V Lighting Panel(5-SL) 230V 照明分电箱(5-SL)Quarter 2nd Level Fr.15.5 STRD InnassagePakge 4 of 2913230V Lighti
8、ng Panel(6-PL) 230V 照明分电箱(6-PL)Quarter 3rd Level TV/Cinema Room(322)生活楼 3 层放映室(322)14230V Lighting Panel(6-SL) 230V 照明分电箱(6-SL)Quarter 3rd Level Dry Store(339)生活楼 3 层干货库(339)15230V Lighting Panel(7-PL) 230V 照明分电箱(7-PL)Quarter 4th Level Recreation/TV Room(422)生活楼 4 层室(422)16230V Lighting Panel(7-SL)
9、230V 照明分电箱(7-SL)Quarter 4th Level Conference Room(454)生活楼 4 层会议室(454)17230V Lighting Panel(8L) 230V 照明分电箱(8L)Quarters Roof Top Radio Room(503)生活区顶楼无线电室(503)18230V Emergency Lighting Panel(1EL) 230V 应急照明分电箱(1EL)Mechanical Workshop机修间19230V Emergency Lighting Panel(2EL) 230V 应急照明分电箱(2EL)Air Compressor
10、 Room U空压机室(上)20230V Emergency Lighting Panel (3EL)230V 应急照明分电箱(3EL)Main Deck Cable Trunk(114)主甲板电缆通道(114)21230V Emergency Lighting Panel(4EL) 230V 应急照明分电箱(4EL)Quarter 2nd Level Store (230)生活楼 2 层储物间(230)22230V Emergency Lighting Panel(5EL) 230V 应急照明分电箱(5EL)Quarter 4th Level Game Room(424)生活楼 4 层室(4
11、24)23230V Emergency Lighting Panel(6EL) 230V 应急照明分电箱(6EL)Quarters Roof Top Radio Room(503)生活区顶楼无线电室(503)24230V Generaler Distributor(2-1P) 230V 总用分电箱(2-1P)Quarters Roof Top Radio Room(503)生活区顶楼无线电室(503)25230V Auxiliaryer Distributor(2-4P) 230V 辅助电源分电箱(2-4P)Machinery Deck Transformer Room机械甲板变压器间2623
12、0V Auxiliaryer Distributor(2-5P) 230V 辅助电源分电箱(2-5P)Machinery Deck Transformer Room机械甲板变压器间27Local Instrument Room Drill Floor Lighting Panel(LIR/LP)本地仪表间钻台照明配电盘(LIR/LP)Drill Floor Local Instrument RM钻台本地仪表间生活楼 2 层#15.5 右内走道1.3.2Engineering Drawings 工程图纸Pakge 5 of 29No.Drawing No. 图纸号Description 描述Re
13、mark备注1HP6001-E612-01480V Main Switchboard #1 & MaCC #1 Single Line Diagram480V 主配电板#1 及主马达控制中心#1 单线图2HP6001-E612-02480V Main Switchboard #2 & MaCC #2 Single Line Diagram480V 主配电板#2 及主马达控制中心#2 单线图3HP6001-E612-11480V Laudryanel Single Line Diagram 480V 洗衣间配电板单线图30AC230V AC Reheater Distributor 2(2-3P
14、) #2 230V 空调电加热分电箱(2-3P)Quarters 3rd Level AHU Room(306)生活楼 3 层空调机间(306)31230V Radio Equipmenter Distributor Box(RPDB- 01)230V 无线电设备分电箱(RPDB-01)Quarters Roof Top Radio Room(503)生活区顶楼无线电室(503)32No.1 Fire Der Controler Distributor(1FDP) #1 防火风闸控制电源分电箱(1FDP)Quarters 3rd Level AHU Room(324)生活楼 3 层空调机间(3
15、24)33No.2 Fire Der Controler Distributor(2FDP) #2 防火风闸控制电源分电箱(2FDP)Quarters 3rd Level AHU Room(306)生活楼 3 层空调机间(306)34No.3 Fire Der Controler Distributor(3FDP) #3 防火风闸控制电源分电箱(3FDP)Machinery Deck Engine Room机械甲板机舱35No.4 Fire Der Controler Distributor(4FDP) #4 防火风闸控制电源分电箱(4FDP)Mezzanine Deck Electrical
16、 Workshop中间甲板电工间36No.1er Distributor Box for FWD Leg Chock(1CHOK)#1 艏部桩腿锁紧装置分电箱(1CHOK)Mezzanine Deck MCC Room中间甲板马达控制间37No.2er Distributor Box for Port Leg Chock(2CHOK)#2腿锁紧装置分电箱(2CHOK)Mezzanine Deck MCC Room Port中间甲板马达控制间 左38No.3er Distributor Box for Stbd Leg Chock(3CHOK)#3 右桩腿锁紧装置分电箱(3CHOK)Mezzan
17、ine Deck MCC Room Stbd中间甲板马达控制间 右28Drill Floor Emergency Lighting Panel(DR/ELP)钻台应急照明配电盘(DR/ELP)Drill Floor Local Instrument RM钻台本地仪表间29AC230V AC Reheater Distributor 1(2-2P) #1 230V 空调电加热分电箱(2-2P)Quarters 3rd Level AHU Room(324)生活楼 3 层空调机间(324)Pakge 6 of 294HP6001-E612-12480V Galleyanel Single Line
18、 Diagram 480V 厨房间配电板单线图5HP6001-E612-13480V Workshopanel Single Line Diagram机修间 480V 配电板单线图6HP6001-E612-14480V Electrical Workshopanel Single Line Diagram 480V 电工间配电板单线图7HP6001-E613-01230V Main Switchboard #1 Single Line Diagram 230V 主配电板#1 单线图8HP6001-E613-02230V Main Switchboard #2 Single Line Diagr
19、am 230V 主配电板#2 单线图9HP6001-E613-03230V Emergency Switchboard System Diagram 230V 应急配电板系统图10HP6001-E613-04230V Galleyanel GP Single Line Diagram 230V 厨房设备配电板单线图11HP6001-E613-05230V Lighting Panel 1L Electrical System Diagram(Machinery Deck)230V 照明分电箱 1L 电气系统图(机械甲板)12HP6001-E613-06230V Lighting Panel 2
20、L Electrical System Diagram(Mezzanine Deck)230V 照明分电箱 2L 电气系统图(中间甲板)13HP6001-E613-07230V Lighting Panel 3L Electrical System Diagram(Main Deck)230V 照明分电箱 3L 电气系统图(主甲板)14HP6001-E613-08230V Lighting Panel 4L Electrical System Diagram(Quarter Main Deck)230V 照明分电箱 4L 电气系统图(生活楼主甲板)15HP6001-E613-09230V Li
21、ghting Panel 5L Electrical System Diagram(Quarter 2nd Level)230V 照明分电箱 5L 电气系统图(生活楼 2 层)16HP6001-E613-10230V Lighting Panel 6L Electrical System Diagram(Quarter 3rd Level)230V 照明分电箱 6L 电气系统图(生活楼 3 层)17HP6001-E613-11230V Lighting Panel 7L Electrical System Diagram(Quarter 4th Level)230V 照明分电箱 7L 电气系统
22、图(生活楼 4 层)18HP6001-E613-12230V Lighting Panel 8L Electrical System Diagram(Quarters Roof&Helideck)230V 照明分电箱 8L 电气系统图(生活楼顶甲板&直升机甲板)19HP6001-E613-14230V Emergency Lighting Panel 1EL Electrical System Diagram(Machinery Deck)230V 应急照明分电箱 1EL 电气系统图(机械甲板)20HP6001-E613-15230V Emergency Lighting Panel 2EL
23、Electrical System Diagram(Mezzanine Deck)230V 应急照明分电箱 2EL 电气系统图(中间甲板)1.3.3Electrical Completion Inspection Test Record 电气完工测试Pakge 7 of 29Item项目Description 描述Initial 初始NameDate 日期ECReview Electrical Inspection Reports For:检查一下电气报验:21HP6001-E613-16230V Emergency Lighting Panel 3EL Electrical System D
24、iagram(Main Deck)230V 应急照明分电箱 3EL 电气系统图(主甲板)22HP6001-E613-17230V Emergency Lighting Panel 4EL Electrical System Diagram(Quarter Main Deck & 2nd Level)230V 应急照明分电箱 4EL 电气系统图(生活楼主甲板和 2层)23HP6001-E613-18230V Emergency Lighting Panel 5EL Electrical System Diagram(Quarter 3rd & 4th Level)230V 应急照明分电箱 5EL
25、 电气系统图(生活楼 3 层和 4 层)24HP6001-E613-19230V Emergency Lighting Panel 6EL Electrical System Diagram(Quarter Roof & Helideck)230V 应急照明分电箱 6EL 电气系统图(生活楼顶甲板&直升机甲板)25HP6001-E613-23230V Generaler Distributor Electrical System Diagram 230V 总用分电箱电气系统图26HP6001-E613-24230V Auxiliaryer Distributor Electrical Syst
26、em Diagram 230V 辅助电源分电箱电气系统图27HP6001-E631-01Lighting Layout Machinery Deck照明布置图 机械甲板28HP6001-E631-02Lighting Layout Mezzanine Deck照明布置图 中间甲板29HP6001-E631-03Lighting Layout Main Deck照明布置图 主甲板30HP6001-E631-06Lighting Layout Quarters Main Deck照明布置图 生活楼主甲板31HP6001-E631-07Lighting Layout Quarters 2nd Lev
27、el照明布置图 生活楼 2 层32HP6001-E631-08Lighting Layout Quarters 3rd Level照明布置图 生活楼 3 层33HP6001-E631-09Lighting Layout Quarters 4th Level照明布置图 生活楼 4 层34HP6001-E631-10Lighting Layout Quarters Roof & Helideck照明布置图 生活楼顶甲板&直升机甲板35HP6001-E760- 004Normal Lighting System One Line Diagram正常照明单线图36HP6001-E760- 005Eme
28、rgency Lighting System One Line Diagram应急照明系统单线图2SYSTEM DESCRIPTION 系统描述Allanels includes 480V Galleyanel, 230V Galleyanel, 480V LaundryerPanel, 480V Workshopanel, 480V Electrical Workshopanel, 230V Lighting Panels &Emergency Lighting Panels, 230V General 230V AC Reheater Distributors, Fire D Leg Ch
29、ock.anels, mentioned above, areer Distributor, 230V Auxiliaryer Distributor, AC er Distributor Boxes forer Controler Distributors,d respectively by 480V Main Switchboard #1, 230VMain Switchboard #1, 230V Emergency Switchboard.er goesoanels from MainCircuit Breaker and is distributed ands from
30、outgoing circuit breakers.When switchboard working, close Main Circuit Breaker anderoanel. Then closeoutgoing circuit breakers, the outgoing circuits ared. Open one outgoing circuit breaker, theoutgoing circuit is out of er.er. And open the Main Circuit Breaker, all out going circuits are out of电气分电
31、箱包括 480V 与 230V 厨房间分电箱、480V 洗衣间分电箱、480V 机修间分电箱、480V电工间分电箱、230V 正常照明与应急照明分电箱、230V 总用与辅助分电箱、230V 空调电加热分电箱、230V 无线电设备分电箱、防火风闸控制电源分电箱、桩腿锁紧装置分电箱。上述分电箱分别由 480V 主配电板#1 与#2、230V 主配电板#1 与#2、230V 应急配电板供电。电源由分电箱主断路器进入分电箱,由分电箱对电源进行分配,自子断路器分配给相应的负载。当配电板正常供电时,闭合主断路器,电源进入分电箱,再闭合子断路器,就为对应回路供电;断开某一子断路器,对应回路失电;断开主断路器
32、,所有回路失电。3SCOPE 范围This procedure will measure some critical da for better service.o check whether electricalanel work normally这个程序将测量一些关键数据,测试分电箱能否正常工作。4PRE-REQUISITIES 前提条件All the equipment shall be properly installed.所有设备应正常安装。All the electrical control panel and cables shall be properly installed
33、and connected.所有电器控制板和电缆应正确安装和连接。All the instruments and equipment shall be properly installed and calibrated.所有仪器和设备应正确安装和校准。The following is required for sucsful commising of the system:下面是为了完成系统调试所需的设备:Two-way radio sets 对讲机 Infrared thermometer 点温枪 Digital multimeter 数字万用表 Megger tester 绝缘表Low o
34、hm meter 指针式欧姆表Insulation tester 绝缘测试器Clammeter 钳形电流表Pakge 8 of 29Cable Connection电缆接线Equipment Check设备安装检查Note: All test instruments shall bear evidence of calibration within 12 months of test注意:所有测试仪器应当有在 12 个月的测试工作中有过校准的证明。5EXECUTION 执行5.1Preparation checks 预先检查5.2Safety precautions 安全保护措施Pakge 9
35、 of 29ItemDescriptionInitialNameDateaAll activities shall be based onernationally recognized safety standards.所有操作均应遵守国际认可的安全标准。bAll accidents and events resulting in harm to people can be prevented.所有可能导致的事故均可以避免。ItemDescriptionInitialNameDate1Verify each panel has been wired as per engineering dra
36、wings and accepted by ABS/Owner.确认所有配电板均按照各工程图纸接线,并已通过 ABS 或船东报验。2Verify aller circuits have been megger checked, as per Mechanical Completion checklist and accepted by ABS/Owner.确认所有供电回路已经按照机械完整性检查进行绝缘检测,并通过 ABS 或船东报验。3Verify alits are securely mounted.确认所有设备安装牢靠。4Verify all earthing pos are proper
37、ly secured.确认所有接地点接地牢靠。5Visually inspect and manually close and trip each circuit breaker to check its mechanical operation. Correct any defects before proceeding.观察断路器是否有缺陷。手动闭合、断开每个断路器,确认其机械性能。 缺陷,必须在调试开始前解决。6Verify the trip setting of each breaker has been set correctly.确认每个断路器断开功能正确设定。7Ensure al
38、l nesary safety devirequired for the test are functioning satisfactorily.确保所有必要的满足工作要求。8Check circuit breaker list is attached in each panel and nameplates are provided.确认分电箱断路器与实物一一对应,并且有对应的铭牌。5.3Fieldnel Deployment部署5.4mising by Vendors Service Represenive 供应商检查For Fuel Oil Purifier, the following
39、 checks and inspections shall be carried out by the Vendors servicerepresenive对于燃油分油机,供应商服务代表应该核实和检查以下内容6COMMISING PROCEDURES 调试程序nel are to vacate from the electricalAll non-essentialanel during the testing.在分电箱调试过程中,所有无关应。The following tests shall be performed and the results shall be recorded wit
40、h the following remarks:进行下文测试,并用以下标志:“OK” for satisfactory equipment performance “OK” 表示满足要求“NA” for “not applicable” “NA” 表示不适用“UN” for unsatisfactory equipment performance “UN” 表示不满足要求Pakge 10 of 29ItemDescriptionInitialNameDateaAll the mechanical components of the system are installed to vendors
41、 specification系统所有的机械按照规格安装bAll the electrical components of the system are installed to vendors specification系统所有的电气按照规格安装cVendors service engineer to verifyt the system is ready and safe to be start up and commised供应商工程师确保系统可以安全的开始调试内容ItemDescriptionInitialNameDateaEnsure requirednel are sioned at
42、 Switchboard Room.确保相关在配电板间。bEnsure requirednel are sioned where electricalanels are located.确保相关在各个分电箱所在舱室。cEnsure there are safetyon site.确保安全在场。cIt must always be rememberedt no job is so important or urgentt it cannot be done safely.没有工作比安全更重要。dWear insulatings and insulated tools.穿戴绝缘用品,使用绝缘工具。
43、6.1Voltage of Outgoing Feeder Breaker 分电箱断路器输出电压Check the voltage at every outgoing feeder breaker of allanels and voltage within specifications.Fill in general resultsable A for respective panels.检测分电箱断路器输出电压,将结果填入表 A。6.2Check Emergency Lights 测试应急照明De-energise the Normal Lighting Panels. Verify th
44、e “Emergency Lights” are in operation and accordingto respective areas in lighting arrangement drawings. Fill in relevant results areas.able A for respective断开正常照明分电箱输入电源,根据照明布置图,检查应急照明分电箱是否正常工作,将结果填入表 A。7TABLES 表格Table A1: 480V Laundryanel(4LP) 480V 洗衣间分电箱(4LP)Table A2: 480V Galleyanel(4GP) 480V 厨房
45、间配电板(4GP)Table A3: 480V Workshopanel(4WP) 机修间 480V 配电板(4WP)Pakge 11 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14WP-Q01NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14GP-Q01NA24GP-Q02NA34GP-Q03NA44GP-Q04NA54GP-Q05NA64GP-Q06NA74GP-Q07NA84GP-Q08NA94GP-Q09NA1
46、04GP-Q10NA114GP-Q11NA124GP-Q12NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14LP-Q01NA24LP-Q02NA34LP-Q03NA44LP-Q04NA54LP-Q05NA64LP-Q06NA74LP-Q07NA84LP-Q08NA94LP-Q09NA104LP-Q10NATable A4: 480V Electrical Workshopanel(4ETLP) 480V 电工间配电板(4ETLP)Table A5:230V Galleyanel(2GP) 230V 厨房设备配
47、电板(2GP)Pakge 12 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M12GP-Q01NA22GP-Q02NA32GP-Q03NA42GP-Q04NA52GP-Q05NA62GP-Q06NA72GP-Q07NA82GP-Q08NA92GP-Q09NA102GP-Q10NA112GP-Q11NA122GP-Q12NA132GP-Q13NA142GP-Q14NA152GP-Q15NA162GP-Q16NA172GP-Q17NA182GP-Q18NA192GP-Q19NA202GP-Q20NA212GP
48、-Q21NA222GP-Q22NA232GP-Q23NA242GP-Q24NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14ETLP-Q01NA24ETLP-Q02NA34ETLP-Q03NA44ETLP-Q04NA54ETLP-Q05NA24WP-Q02NA34WP-Q03NA44WP-Q04NA54WP-Q05NA64WP-Q06NA74WP-Q07NA84WP-Q08NA94WP-Q09NA104WP-Q10NA114WP-Q11NA124WP-Q12NATable A6: 230V Lighting P
49、anel (1L) 230V 照明分电箱(1L)Table A7: 230V Lighting Panel(2L) 230V 照明分电箱(2L)Pakge 13 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M12L-Q01NA22L-Q02NA32L-Q03NA42L-Q04NA52L-Q05NA62L-Q06NA72L-Q07NA82L-Q08NA92L-Q09NA102L-Q10NA112L-Q11NA122L-Q12NA132L-Q13NA142L-Q14NA152L-Q15NAS/No.Panel
50、 No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M11L-Q01NA21L-Q02NA31L-Q03NA41L-Q04NA51L-Q05NA61L-Q06NA71L-Q07NA81L-Q08NA91L-Q09NA101L-Q10NA111L-Q11NA121L-Q12NA131L-Q13NA141L-Q14NA151L-Q15NA161L-Q16NA171L-Q17NA181L-Q18NA191L-Q19NA201L-Q20NA211L-Q21NA252GP-Q25NA262GP-Q26NA272GP-Q27NA282GP-Q28NATa
51、ble A8: 230V Lighting Panel (3L) 230V 照明分电箱(3L)Pakge 14 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M13L-Q01NA23L-Q02NA33L-Q03NA43L-Q04NA53L-Q05NA63L-Q06NA73L-Q07NA83L-Q08NA93L-Q09NA103L-Q10NA113L-Q11NA123L-Q12NA133L-Q13NA143L-Q14NA153L-Q15NA163L-Q16NA173L-Q17NA183L-Q18NA193L-
52、Q19NA203L-Q20NA213L-Q21NA223L-Q22NA233L-Q23NA243L-Q24NA253L-Q25NA263L-Q26NA273L-Q27NA283L-Q28NA293L-Q29NA303L-Q30NA313L-Q31NA323L-Q32NA333L-Q33NA343L-Q34NA353L-Q35NA162L-Q16NA172L-Q17NA182L-Q18NA192L-Q19NA202L-Q20NA212L-Q21NA222L-Q22NA232L-Q23NA242L-Q24NA252L-Q25NATable A9: 230V Lighting Panel (4-PL
53、) 230V 照明分电箱(4-PL)Table A10: 230V Lighting Panel (4-SL) 230V 照明分电箱(4-SL)Table A11: 230V Lighting Panel (5-PL) 230V 照明分电箱(5-PL)Pakge 15 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M15-PL-Q01NA25-PL-Q02NA35-PL-Q03NA45-PL-Q04NA55-PL-Q05NA65-PL-Q06NA75-PL-Q07NA85-PL-Q08NA95-PL-Q09
54、NA105-PL-Q10NA115-PL-Q11NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14-SL-Q01NA24-SL-Q02NA34-SL-Q03NA44-SL-Q04NA54-SL-Q05NA64-SL-Q06NA74-SL-Q07NA84-SL-Q08NA94-SL-Q09NA104-SL-Q10NA114-SL-Q11NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M14-PL-Q01NA24-PL-Q02NA34-
55、PL-Q03NA44-PL-Q04NA54-PL-Q05NA64-PL-Q06NA74-PL-Q07NA84-PL-Q08NA94-PL-Q09NA104-PL-Q10NA114-PL-Q11NA363L-Q36NA373L-Q37NATable A12: 230V Lighting Panel (5-SL) 230V 照明分电箱(5-SL)Table A13: 230V Lighting Panel (6-PL) 230V 照明分电箱(6-PL)Table A14: 230V Lighting Panel (6-SL) 230V 照明分电箱(6-SL)Pakge 16 of 29S/No.P
56、anel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M16-SL-Q01NA26-SL-Q02NA36-SL-Q03NA46-SL-Q04NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M16-PL-Q01NA26-PL-Q02NA36-PL-Q03NA46-PL-Q04NA56-PL-Q05NA66-PL-Q06NA76-PL-Q07NA86-PL-Q08NA96-PL-Q09NA106-PL-Q10NA116-PL-Q11NA126-PL-Q12NA1
57、36-PL-Q13NA146-PL-Q14NA156-PL-Q15NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M15-SL-Q01NA25-SL-Q02NA35-SL-Q03NA45-SL-Q04NA55-SL-Q05NA65-SL-Q06NA75-SL-Q07NA85-SL-Q08NA95-SL-Q09NA105-SL-Q10NA115-SL-Q11NA125-SL-Q12NA135-SL-Q13NA145-SL-Q14NA125-PL-Q12NA135-PL-Q13NA145-PL-Q14NATable A
58、15: 230V Lighting Panel (7-PL) 230V 照明分电箱(7-PL)Table A16: 230V Lighting Panel (7-SL) 230V 照明分电箱(7-SL)Pakge 17 of 29S/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M17-SL-Q01NA27-SL-Q02NA37-SL-Q03NA47-SL-Q04NA57-SL-Q05NAS/No.Panel No.Refer 6.1/VoltRefer 6.2Installed (AT)Insulation/M17-P
59、L-Q01NA27-PL-Q02NA37-PL-Q03NA47-PL-Q04NA57-PL-Q05NA67-PL-Q06NA77-PL-Q07NA87-PL-Q08NA97-PL-Q09NA107-PL-Q10NA117-PL-Q11NA127-PL-Q12NA137-PL-Q13NA147-PL-Q14NA157-PL-Q15NA167-PL-Q16NA177-PL-Q17NA187-PL-Q18NA197-PL-Q19NA207-PL-Q20NA217-PL-Q21NA227-PL-Q22NA56-SL-Q05NA66-SL-Q06NA76-SL-Q07NA86-SL-Q08NA96-SL
60、-Q09NA106-SL-Q10NA116-SL-Q11NA126-SL-Q12NA136-SL-Q13NA146-SL-Q14NA156-SL-Q15NA166-SL-Q16NA176-SL-Q17NATable A17: 230V Lighting Panel (8L) 230V 照明分电箱(8L)Table A18: 230V Emergency Lighting Panel (1EL) 230V 应急照明分电箱(1EL)Table A19: 230V Emergency Lighting Panel (2EL) 230V 应急照明分电箱(2EL)Pakge 18 of 29S/No.P
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 肺癌合并结核护理查房
- 4.2 资源跨区域调配 第1课时 课件高二地理人教版(2019)选择性必修2
- 儿童猩红热的护理
- 人教版九年级物理16.1电压教学设计
- 幼儿园教师培训简报
- 育儿嫂培训课程
- 急性肾小球肾炎临床路径
- 2023-2024学年辽宁省大连市高一(上)期末地理试卷
- 全等三角形判定二(SSS)(提高)巩固练习
- 湖北商贸学院《抽样技术》2023-2024学年第一学期期末试卷
- 山西省灵丘县山西省刁泉银铜矿业有限公司银、铜矿资源开发利用、地质环境保护与土地复垦方案附件
- 2021年全国普通高等学校体育单招真题英语(含答案解析)
- 物业项目全生命周期个关键节点清单
- 公司装修许可证
- CQI-12涂装系统评审
- 信用管理师(三级)理论考试题库(300题)
- 弯沉值计算表格-你懂得
- 2023全球电动汽车展望(英文)-国际能源署
- 吸收光谱法的浅析
- WS/T 406-2012临床血液学检验常规项目分析质量要求
- 2021-卒中后呼吸系统感染气道管理专家指导意见
评论
0/150
提交评论