1、会计学1工程(gngchng)管理专业英语合同管理第一页,共13页。Unit 6 Contract Management of Construction Projects 6.1 Types of AgreementsLump-sum agreement (stipulated sum, fixed price)Unit-price agreementCost-plus-fee agreement6.2 The parties of ContractRights and responsibility of the Owner 第1页/共13页第二页,共13页。Words and Express

2、ionsincorporatepromulgateclausestipulateRegardless of In placeTakeoffAt riskBe responsible forv.包括,包含v.公布,颁布n.条款,款项v.规定,讲明不管在合适的位置n.开始(kish),起始量冒险对负责第2页/共13页第三页,共13页。Words and Expressionsunit-price agreementlump-sum agreementcost-plus-fee agreementPercentage fee agreementFixed fee agreementFixed fee

3、 with a bonus and penalty agreementRepresentative of ownerDrawings and specification单价合同总价合同成本加费用(fi yong)合同费用(fi yong)百分比合同固定费用(fi yong)合同固定费用(fi yong)加奖罚合同业主代表图纸规范第3页/共13页第四页,共13页。Unit 6 Contract Management of Construction Projects 6.1 Types of Agreements The owner-contractor agreement formalizes

4、the construction contract. It incorporates, by reference, all other contract documents. The owner selects the type of agreement that will be signed: It may be a standard form of agreement such as those promulgated by the American Institute of Architects (AIA) or by other professional or trade organi

5、zations.第4页/共13页第五页,共13页。Unit 6 Contract Management of Construction Projects 6.1 Types of Agreements The agreement generally includes a description of the project and contract sum. Other clauses pertaining to alternates accepted, completion date, bonus and penalty clauses, and any other items that s

6、hould be amplified are included. No contract should be signed until the attorney for all parties check it. Each partys attorney will normally give attention only to matters that pertain to his or her clients welfare. All contractors should employ the services of an attorney who understands the nuanc

7、es of the construction industry and property law. 第5页/共13页第六页,共13页。Unit 6 Contract Management of Construction Projects 6.1 Types of Agreements Types of agreements generally used are follows: 1. Lump-sum agreement (stipulated sum, fixed price) 2. Unit-price agreement 3. Cost-plus-fee agreement第6页/共13

8、页第七页,共13页。Analysis on sentence structureIf the original work is already in place, then the cost of change order includes not only the cost of the new work but also the cost of removing the work that has already been completed.译文:如果(rgu)原先的工作已经完成,那么由于变更命令引起的费用不仅包括新工作的费用,还包括移除已完成工作的费用。第7页/共13页第八页,共13页

9、。6.2 The Parties of ContractRights and responsibility of the Owner the owner may be authorized to award other contracts in connection with the work, to require contract bonds from the contractor, to approve the surety proposed, to retain a specified portion of the contractors periodic payments, to m

10、ake changes in the work, to carry out portions of the work in case of contractor default or neglect, to withhold payments from the contractor for adequate reason, and to terminate the contract for cause. 第8页/共13页第九页,共13页。6.2 Parties of ContractRights and responsibility of the Owner The right of the

11、owner to inspect the work as it proceeds, to direct the contractor to expedite the work, to use completed portions of the project before contract termination, and to make payment deductions for uncompleted or faulty work are common construction contract provisions. 第9页/共13页第十页,共13页。Analysis on sente

12、nce structureEven though the owner enjoys certain rights with respect to the conduct of work, it cannot issue direct instructions as to method or procedure, unreasonably interfere with construction operations, or otherwise unduly assume the functions of directing and controlling the work.译文:尽管(jn gu

13、n)业主享有关于工程建设的某些权利,但是业主也不能就施工的具体方法和程序直接发出指令,不能不合理地干涉建设的具体操作,也不能不恰当地行使指挥和控制方面的职能。第10页/共13页第十一页,共13页。ExercisesPut the following English into Chinese:Because of the very nature and risks with the lump-sum price, it is important that the contractor be able to accurately understand the scope of the project work required at time of bidding.第11页/共13页第十二页,共13页。ExercisesPut the following English into Chinese:Ad

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论