1、Site Specific Safety PlanList Project name and Location1. INTRODUCTIONa) Name of organization/company) is committed to the health and safety of our employees.b) Company name has a SAFETY & HEALTH MANUAL, which is a crucial partof this sites specific safety plan. (Every Superintendent should have a c
2、opy or has access to one at anytime)c)The health and safety of our employees, our subcontractors, vendors and the general public is the first consideration in the operation of our business, andin particular, this project:(insert project name here)d) It is our goal to establish and maintain safety po
3、licies and practices which are in full compliance with all applicable federal, state and local laws, regulations and guidance, especially those issued by Federal OSHA2. HEALTH AND SAFETY DOCUMENTSa) Contract Documentsb) Work-SAFE Program Parts I, II, and III & IVc) All Federal, State and Local Healt
4、h & Safety requirements3. EMERGENCY NUMBERSa) Owner s specific requirementsb) Medical Emergency Facility-(for self perform only-Subcontractors required toFacilitate their own plan):(name of the nearest facility)Address:(physical address, city, state and zip code)Telephone ( (area code) and phone num
5、ber)c)Occupational Health Care Services(for non life threatening during availablehours):Address: (physical address, city, state and zip codeTelephone: (area code) and phone numberd) Superintendent sNumber: Mobile numberJobsite Trailer numbere) Local Police Dept.: _f) Local Fire Dept.: _g) Miss Dig (
6、 if applicable)h) Hazmat (for chemical spills and/or toxic releases)4. EMERGENCY and FIRST AID PROTOCOLa) Each contractor will provide first aid stations, well marked and available to site personnel during all working shifts.b) One person holding a valid first aid and CPR certificate will be respons
7、ible for the proper use and maintenance of the first aid station.1/27/20201 of 6Site Specific Safety PlanList Project name and Locationc)Each contractor will responsible for their own emergency plan.d)There will be a minimum of one ( site wide) known person per site with a valid CPR/First Aid certif
8、ication.e) Emergency procedures are as follows:Callfor all emergenciesEvacuation signals and meeting placeFire mustering point issignal isall clearTornado shelter issignal isall clearHazardous chemical mustering pointsignal isall clear is5. PROJECT ORGANINZATIONAL CHART & CONTACT INFORMATION Insert
9、project organization chart and staffing requirements for this siteAt the time of this publication, an organizational chart and staffing requirements havenot beendetermined.Upononsetof (companiesname ) mobilizingon-siteandperforming their scopes of work a staffing chart will be made available which w
10、ill include the following:Owner and/or Owner Representative:(name and phone number)Your Company Site Representative: (name and phone number)Your Company Safety Representative: (name and phone number)On-site Subcontractorsperson who is responsiblefor overall project;(name and phone number)On-siteSubc
11、ontractorsthat is responsiblefor safety on this project:(name and phone number)Subcontractors Main office:(name and phone number)All competent Persons for Hazardous Operations6. SPECIAL NEEDS of THE CUSTOMERd) Shift times (e.g. 1 st shift, 2 nd shift, etc.)e) Weekend workf) Restricted Areasg) Smokin
12、g Areash) Children s presence onor near the sitei) Handicapped people on or near the sitej) Other public Safety concerns7. PROTECTION of the GENERAL PUBLICa) Walkways, Sidewalks, Parking Lots cleared and accessibleb) Barricades, Flashing Barrels,DANGER“ DO NOT ENTER” postingsc) Project signaged) (An
13、y other protection not mentioned needs to be added here)1/27/20202 of 6Site Specific Safety PlanList Project name and Location8. PROTECTION of SITE WORK PERSONNELa) Work-SAFE Orientation Part I and Jobsite/New Hire Safety Orientationb) Work-SAFE Parts II, III and IVc) MSDSsand Chemical Inventory Loc
14、ationd) Job Board Locatione) REACH Board Locationf) Hardhats, Safety glasses with side shields, ear plugs, construction-worthyfootwear, gloves, face shields, Safety Vests, and all applicable Personal Protection Equipmentg) Any other specialized training that may be specific to this site but not limi
15、ted to the following;Excavation Confined space Scaffold erection Critical Rigging Lock Out/ Tag Out9. PROJECT SAFETY SITE DRAWINGa) Site Drawing highlightingb) Hazardous areasExcavation areasDemolition areasTrenching areas, etc.c) Emergency exit routesd) First Aid statione) Employee parkingf) Employ
16、ee breaks areas, etc.g) Job Boardh) Reach Board10. SPECIAL PROJECT HAZARDSThis is determined and discussed on a daily basis as the project progresses and the circumstances, project site etc., develops and changes.All Contractors/Subcontractors and/or supervisor must review and document the plan for
17、performing the work task to the employee prior to hazardous operation beginning . (This is not a an inclusive list, each supervisor must use common sense when determining the degree of hazard associate with the task). Note: Pre-Task Planning and Pre-Construction Forms to be utilized (enclosed herein
18、)a) Excavation / Trenching/ Caissonsb) Crane lifts and rigging operations1/27/20203 of 6Site Specific Safety PlanList Project name and Locationc) Confined Spaced) Steel Erection/ working from heightse) Roof Top Work-penetrations, roofing installation and or repair etc.f) Working on or around high te
19、nsion wiresg) Demolitionh) Traffic Controli) Scaffolds / Ariel lift workj) Working on or around energized equipment or systemsk) Use of chemical materialsl) Cutting and capping utilitiesm) Working on or around substationsn) Working on or around pitso) Any respirator type activitiesp) Any use of tar,
20、 asphalt kettle or tankers11. SITE SIGNAGE REQUIREMENTSProject Sign will detail specific information regarding ownership, architectural firm, contractor, etc.a) Any Hazardous chemicalsb) Confined Spacec) Overhead Wiresd) DANGER DO NOT ENTERe) DANGER HARD HATS REQUIREDf) DANGER EYE AND EAR PROTECTION
21、 REQUIREDg) MSDS for this are locatedh) First Aid stationi) Job Board complete with all the following current Federal and State postings:j) Right-to-Know postings-One complete set for the site office/Gang boxNote: Failure to comply with Right-To-Know, Hazardous Materials Communications regulations m
22、ay result in a fine up to $10,0000 per violationOSHA and/or MIOSHA 300 Log (to be posted a minimum from February 1 until April 30)Project Safety Site DrawingEmergency ProcedureEmergency Phone NumbersSafety progress(if applicable ) man hours verses accidentsk) REACH Board (if applicable )l) First Aid
23、 Stations1/27/20204 of 6Site Specific Safety PlanList Project name and Location12. EMPLOYEE ORIENTATIONa) Drug screening per Work-SAFE and/or Owner requirementsb) Work-SAFE Part I & Jobsite / New Hire Safety Orientationc) Documentation of equipment certificationsd) Documentation of First Aid and CPR
24、 certifications13. SAFETY MEETINGSa) Weekly Tool Box Talks will be held with employees everyNote:Subcontractors are required to complete their own Tool Box Talks every.b) Progress meetings will be held everywith Safety as the first topic.Any and all problems will be listed and a method for correctiv
25、e action will be determined and implemented as a result of the meeting.c)Superintendents should walk the project site everywith allcontractors completing a site inspection of all areas.14. PROJECT SAFETY DOCUMENTATIONNote: all safety related documents will be kept at the job site until the end of th
26、e project and then will be stored in accordance with the (company name) record storage policies.a) A completed OSHA/MIOSHA 300A “ Summaryof work Related Injuries and Illness for” each contractor/subcontractor (to be collected at the end of the project)b) A safety and Health Plan from each Contractor/Subcontractorc)A site safety plan for each site and for each contractor/subcontractor(ifapplicable)d)All complet
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 医保档案管理制度之日常考核
- 小提琴陪练制度规范标准
- 幼儿园学籍管理规范制度
- 法医检查室制度规范标准
- 档案室必要规章制度
- 巡察办相关保密制度规范
- 物业办公室档案管理制度
- 为何要规范企业加班制度
- 酒吧歌手值班制度规范标准
- 教师每日上下班制度规范
- 2025插班生法学考试真题及答案
- 室内设计方案讲解思路
- 建筑垃圾消纳处置方案(3篇)
- SMETA确保员工合法工作权的核查程序-SEDEX验厂专用文件
- 2025年云南省公职招录考试(省情时政)历年参考题库含答案详解(5套)
- 银行客户分层管理课件
- 药品技术转移管理制度
- 拼多多公司绩效管理制度
- 儿科急诊管理制度
- 《2024 3621-T-339 车载显示终端技术要求及试验方法》知识培训
- 风控准入人员管理制度
评论
0/150
提交评论