




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 高新技术企业力 科 电 气 圆型侧式悬臂堆料机电控系统使用说明书大连力科技术工程有限公司(本企业通过ISO9001认证) 高新技术企业力 科 电 气 圆型桥式刮板取料机电控系统使用说明书大连力科技术工程有限公司 High & New Technological Enterprise Electric Control System For Round Size-SideCantilever Material Piling MachineOPERATION MANUALDalian Like Technology Co., Ltd(This enterprise has passed I
2、SO9001authentication) High & New Technological Enterprise Electric Control System For the RoundSize-Bridge Scraper FeederOPERATION MANUALDalian Like Technology Co.,Ltd Electrical Operation Manual For Bridge Scraper Feeder Protection&Faults Total 7 Pages No.6 The whole machine is installed pe
3、rfect protection program, warning and display system. 6.1 Heat Protection for Motor All motor are provided with heat protection. If the motor is overload, the sound annunciator will send out sound and light alarm. 6.2 Other Faults PLC determines the following cases as machine faults: 1. The 299 degr
4、ee stroke limit switch activate. 2. The rake has been exceed front or back limit. 3. Emergency stops. 4. The lubricate oil level is lower than the limit. 5. The inverter faults occur. 6. Middle control machine stops. 7. Rake or scraper coupling over-load. 8. Scraper chain broken. Note:The PLC stops
5、the machine when the faults in this chapter or chapter 6.1 appears. 6.3 Alarm There is also alarm display in the program,and the PLC does not stop the machine. Note:The operator can examine the faults or alarm point by enterring into the message picture when the cases in chapter 6.1 or 6.2 appears.
6、Electrical operation manual For the Bridge type Scraper Feeder Maintenance&Inspection Total 7 Pages No.7 During the daily and periodic maintenance or inspection,Besides the above mentioned points of safety, requirements, regulations, functions etc.,The following must also be included: 1. Inspect
7、 motor frequently. Carry out maintenance according to relative specifications. Before starting motor, manually inspect the loading conditions. 2. Check the cabinets, cases and electrical elements regularly. Pay attention at any moment that dust and foreign material shall not enter into the cabinets
8、and cases. Blow and clean once every shift. 3. The thermal-overload relays have been calibrated before leaving factor or during debugging. customer shall not adjust 4. Pay attention to the temperature, humidity and environment in console. Cabinets shall be dry because the touch screen and PLC, etc. are
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 珍惜时间的发言稿
- 家长会历史老师发言稿
- 中小学体育教师队伍现状分析
- 人工智能辅助摄影创作与个性化教学策略
- 工业旅游的创新模式分析
- 2025年节能、高效干燥设备项目合作计划书
- 课题申报书研究框架
- 品牌授权代理合同范例
- 商贸长期合同范本
- 咨询合同范本蓝本
- PySide学习教程
- Adobe-Illustrator-(Ai)基础教程
- 钢栈桥计算书(excel版)
- 租赁合同审批表
- 事业单位综合基础知识考试题库 综合基础知识考试题库.doc
- 岩石坚固性和稳定性分级表
- 译林初中英语教材目录
- 律师事务所函[]第号
- 物业交付后工程维修工作机制
- 农作物病虫害专业化统防统治管理办法
- 新形势下如何做一名合格的乡镇干部之我见
评论
0/150
提交评论