![外加电流阴极保护装置中英文版_第1页](http://file3.renrendoc.com/fileroot_temp3/2022-2/28/b1ed068b-f355-4555-ab81-70ec6af1e7fb/b1ed068b-f355-4555-ab81-70ec6af1e7fb1.gif)
![外加电流阴极保护装置中英文版_第2页](http://file3.renrendoc.com/fileroot_temp3/2022-2/28/b1ed068b-f355-4555-ab81-70ec6af1e7fb/b1ed068b-f355-4555-ab81-70ec6af1e7fb2.gif)
![外加电流阴极保护装置中英文版_第3页](http://file3.renrendoc.com/fileroot_temp3/2022-2/28/b1ed068b-f355-4555-ab81-70ec6af1e7fb/b1ed068b-f355-4555-ab81-70ec6af1e7fb3.gif)
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、EQUIPMENT OF ICCP SYSTEM外加电流阴极保护装置1.0 MAIN PERFORMANCES/ 主要参数1.1 Acreage defend 保护面积10034.41.2 Use-life of the Anod# 阳极使用寿命 1015years1.3 Power system 电源电制AC 440M60Hz,3 62.0 AUTOMATIC POWER SUPPLY/ 恒电位仪SF-300-4002.1 Type/ 型号2.2 Quantity/ 数量1 set台2.3 Input/ 输入AC 440V 60H乙 3 62.4 Output/ 输出DC 16V, 0400
2、A2.5 Dimensions/尺 寸L815 W615>< H1420mm2.6 Weight/ 重量 200kg3.0 ANODE/ 阳极3.1 Quantity/ 数量sets3.2 Output Current/ 输出电流02003.3 Dimensions/尺 寸474 X200mm3.4 Weight/ 重量60kg4.0 REFERENCE ELECTRODE/参比电极4.1 Quantity/ 数量sets4.2 Material/ 类型Ag-AgC I银-氯化银4.3 Weight/ 重量 20 kg5.0Potential defend保 护电位-0.826.0
3、 Rudder Earthing /舵接地270mm >2m 420X 460>20mm 1sets7.0 Anode Shield 阳极屏蔽层 1 组 <2 桶)20 Kg 8.0Propeller Earthing 猝由接地装置电极安装说明Electrode Installation Instructions1.0 阳极安装说明 Anode Installation Instructions1.1 定位 Orientation 辅助阳极安装在船体的两侧,其安装位置须满足以下条件。Auxiliary anode is installed at two ends of the
4、 hull, and the installation locations should meet the following requirements:1.1.1 辅助阳极需安装在轻水线以下,一般与推进器轴平行的位置,特殊情况可上下调整。Auxiliary anode should be installed under the light water line 。 generally the location should be parallel with the propeller shaft which could be adjusted upwards or downwards und
5、er special circumstances.1.1.2 辅助阳极在船体的横向位置应该是:两只安装于近艉部。具体位置可由安装项目师现场指 导。The horizontal location of the auxiliary anode on the hull should be: two should be installed near the stern . The detailed location can be on-site instructed by installation engineer.1.1.3 阳极安装位置其船体钢板外侧比较平坦。The external hull p
6、late installing the anode should be relatively flat.1.1.4 阳极安装位置其船舱内侧有一定空间,易于安装和维修。The cabin inner installing the anode should have certain space to facilitate the installation and maintenance.1.1.5 左舷与右舷两侧安装的阳极应该对称的。The anodes installed at port side and starboard side should be symmetrical.1.2 开孔 H
7、ole opening1.2.1 在确定的位置上用气焊开孔,其孔直径与阳极结构图中尺寸相符。Open the hole at determined location by gas welding, with the hole diameter identical with the dimensions in anode structure diagram.1.2.2 开好孔后应将其清理干净。同时将阳极总成的阳极及绝缘底座拆下 。The opened holes should be cleared, while the anode and the anode assembly remove th
8、e insulating base.1.3密封套焊接 Welding the watertight wrap将阳极结构图中的密封套 “9与安装底板组成一体 )”按结构图焊接 , 在焊接前需将其位置摆正,密封套 “9要”与船体垂直,安装底板 “7与”船体紧贴并焊接 密封套体在舱内)。The anode structure diagram of the sealed set of "9 (Composed of one floor with the installation>"according to welding chart, Need to be in place
9、before welding straighten, Seal sets of "9" with the vertical hull, Install floor "7" and the ship close and welding(Seal sets of body in the cabin>.1.4 水密罩焊接 Welding the watertight gland将阳极结构图中水密罩 “16按”结构图焊接在密封套的外圈。The anode chart watertight cover"16" by welding the
10、 outer ring in the gland.1.5 阳极安装 AnodeInstallation1.5.1将阳极按结构图进行安装, <舱外有人)将阳极接线柱从密封套孔伸入舱内,在舱内将阳极的 接线柱定位并将密封橡皮塞、绝缘套“15”水密压盖等按正确安装方式装上。并用万用电表测试阳极与船体的绝缘度,正常情况为不导通。一切正常后,在船体外壳用固定螺丝将阳极 绝缘底座 “4与”安装底板 “7固”定,同时在舱内将水密罩压盖拧紧。The anode according to the installation diagram, (Outside the cabin has the human&
11、gt;Anode terminal will reach into the cabin from a hole sealed cover, In the cabin to the anode of the terminal positioning and sealing rubber plug, insulated cover, "15" watertight gland, etc. installed on the correct installation. Test with a multimeter and the hull of the isolation of t
12、he anode, normally for non-conduction. All normal, in the hull shell insulator with screws to the anode base, "4" and install the floor "7" fixed, while the cabin will be watertight enclosures gland tightened. 1.5.2将舱外的阳极固定螺丝用环氧树脂<或胶水)封掉。Seals the cabin outside anode anchor sc
13、rew with the epoxy resins(or glue>.1.5.3接线: 将阳极线接上,并拧紧螺母。Wire connection: connect the anode wires and tight the nuts.1.5.4检查: 检查阳极与钢板的绝缘度,紧固螺丝是否松动,水密是否可靠,确认一切正常后, 将阳极待用。Inspection: check the insulation degree between the anode and the plate。 check whether the fastening screws are loose, whether t
14、he watertight is reliable. The anode will be ready for use after all are confirmed to be normal.1.6 涂装阳极屏蔽层 Anode shield paint2在阳极安装好后,在阳极四周涂装阳极屏蔽层,屏蔽层的面积为:3.14m(2000mm,其厚度为:阳极四周围应达2.0mm ,最远的部分为1mm,在涂装前应将涂刷部位除锈出白达Sa21/2。阳极屏蔽层为甲、乙两组份分装,使用时将甲、乙两组份1:1混合搅拌均匀后涂刷。After installing the anode, the anode surr
15、ounding should be coated with anode shield paint, with the2shield paint area of 3.14 m( 2000mm。the thickness should be: the anode surrounding should be1/22.0mm, and utmost parts should be 1mm 。 the rust at coating parts should be removed until Sa2 . The anode shield paint is sub-packed in A and B tw
16、o groups。 mix A and B two groups in 1:1 uniformly before use and coating.1.7 检验 Test阳极安装好后,需进行检验,内容有:The following items should be tested after the anode is installation:a) 绝缘实验:在无水无雾条件下,其绝缘度1MQ,若有雾,用万用电表测不导通即可。Insulation test: under waterproof and fog proof condition, the insulation degree should b
17、e 1MQ 。 If fog, it should be unconnected when measured with avometer.b) 耐压实验:接入压缩空气,压力0.5MPa,历时15分钟无变化为合格。Anti-pressure test:Connect the compressed air, no changes in 15 minutes will be qualified with the pressure of 0.5MPa。2.0 参比电极安装 Reference Electrode Installation2.1 定位 Orientation按照设计要求确定参比电极在船体
18、的具体安装位置。Determine the detailed installation location of reference electrode in the hull according to the design requirements.2.2 开孔 Hole opening在确定的位置开孔,孔的直径为91mm,开好孔后,应将其清理干净。91mm. The ope ned hole should beOpen the hole at determined location with the hole diameter ofcleared.2.3 焊接安装底板 Welding the
19、 installation backplane 将“参比电极结构图”中的底座法兰“3”按结构图焊接 <需两面焊接),在焊接前需将其位置摆 正,要与船体垂直。Weld the mounting flange “3”in the reference electrode structure diagram in accordance with the structure diagram (both sides should be welded>, the location should be vertical with the hull and it should be correctl
20、y located before welding.2.4 安装参比电极 Reference Electrode Installation 将参比电极总成按结构图将进行安装,将参比电极体从舱内伸入安装底板孔中,用螺丝将 水密罩法兰与安装底板固定。The reference electrode assemblyshould be installed according to the structure diagram, insert the reference electrode through the cabin into the hole on installation backplane,
21、and then fix the watertight enclosure flange with the installation backplane with the screws.2.5 接线 Wire connection 先将参比电极线接上,并拧紧螺母。Connect the reference electrode wires and tight the nuts.2.6 检查:检查参比电极与钢板的绝缘度,紧固螺丝是否松动,水密是否可靠,确认一切正常后 ,将参比电极待用。Inspection: check the insulation degree between the refer
22、ence electrode and the plate。 check whether the fastening screws are loose, whether the watertight is reliable. The reference electrode will be ready for use after all are confirmed to be normal.2.7 检验 Test 参比电极安装好后,需进行检验,内容有:The following items should be tested after the reference electrode is inst
23、allation:a) 绝缘实验:用万用电表测定参比电极电缆与船体钢板之间的电阻,若显示不导通即为合 格。Insulation test: measure the resistance between the reference electrode cable and hull plate with avometer, if unconnected, it will be qualified.b)耐压实验:接入压缩空气,压力0.5MPa,历时15分钟无变化为合格。Anti-pressure test :Connect the compressed air, no changes in 15 m
24、inutes will be qualified with the pressure of 0.5MPa 。外加电流阴极保护装置实验程序及方法Test procedures and methods of ICCP1.0 实验前的准备 Preparation before the test 装置在运行实验前,必须对装置的安装及接线进行严格检查,其检查内容有:Before the device operation test, the device installation and wire connection should be strictly inspected, including:1.1
25、 阳极检查: Anode Inspection 在船舶下水前,检查阳极与船体钢板是否绝缘,正常情况应该绝缘不导通,如果发现导通须 找原因进行处理,同时检查水密安装是否可靠,安装是否牢固,在船舶下水后应再次检查水 密情况。Before the ship launching, the insulation between the anode and the hull plate should be checked 。 under normal circumstances, it should be insulated without connection 。 if connected, find
26、the reasons for treatment。 at the same time check whether the watertight installation is reliable and whether the installation is fastened 。 re-check the watertight situation after the ship launching.1.2 参比电极检查: 主要检查水密情况。Inspection of reference electrode: mainly check the watertight situation.1.3 恒电
27、仪检查: 检查恒电位仪安装是否牢固,设备在安装中是否被损坏。Inspection of potentiostat: check whether the potentiostat installation is solid and whether the equipment is damaged during the installation.1.4 接线检查: Wire connection inspection:检查恒电位仪 AC 进线,联接是否正确,牢固。Check whether the potentiostat AC line and connection are correct an
28、d firm. 阳极线检查:检查阳极线两端是否正确联接。Anode wire inspection: check whether two ends of anode wire are correctly connected. 阴极线:接地线是否正确接地。Cathode wire: check whether the grounding wire is correctly grounded. 参比电极线:参比电极线是否接线正确,参比电极接线是否接好。Reference electrode wire: check whether the reference electrode wire is co
29、rrectly connected andwhether the reference wire connection is well connected.2.0 运行实验 Operation test2.1 在检查无误后才可以启动恒电位仪,进入运行实验状态。Start the potentiostat to enter the operation test state if the inspection is normal.“功能选择 ”开关 K2 置 “手控”位置,并将 W1、W2、W3 电位器由逆时针方向旋转后回转二 圈。Place the “FUNCTION SELECTION ” sw
30、itch K2 should be set at “ Manual control ” position, and W1, W and W3 potentiometer should be anti-clockwise rotated before two circles back-rotation.2.2 开机实验 Boot-strap test2.2.1 手控实验 Manual control test置 电源开关” K于 “ON,数字显示表点亮,选择电位测量开关K3置于给定电位档,顺时针旋转 手控”电位器W1,使输出电压、电流逐渐上升。Place the “ power switch ,
31、 K1 on “ ON, , the digital display meter will light up, sepleocttetnhteial measurement switch K3 on the given potential grade, rotate in clockwise way the“ manual copotentiometer W1 to keep the output voltage and current rising gradually.2.2.2 自动控制实验 Automatic control test若上述正常,将开关 K2置 恒电位”位置,K3调到给定
32、位置上,顺时针调节恒电位的电位器W2,使电位逐渐上升至所设的保护电位 -0.82V 。观察参比电位跟综给定电位值。若参比电极跟踪 测定的电位值与设定电位值基本一致,即为正常<注:在本设备中,采用Ag-AgCl 参比电极,其电位已转化显示为正值)。If the above are normal, set switch K2 at potentiostatic , position and K3 to given position。 clockwise adjust the potentiometer W2 of the potentiostat to increase the potent
33、ial to the set protection potential -0.82V. Observe the given potential value by tracking reference potential. If the measured potential value tracking by reference electrode is basically identical with the preset potential value, namely, normal. (Note: For this device, the potential has been changed to negative value using Ag- AgCl reference electrode is used, the potential has been changed to display positive val
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 时尚买手店翻新居间合同
- 图书馆基础装修合同
- 橡胶制品采购居间合同范本
- 乐器维修店简易装修合同
- 教育机构厂房装修合同
- 保健用品居间合同
- 面包砖重新铺施工方案
- 门店招牌工程施工方案
- 溧水区单位保洁方案
- 在村里承包鱼塘合同范本
- 慢性肾衰竭的护理课件
- 2024-2025学年河南省郑州市高二上期期末考试数学试卷(含答案)
- 2024-2025学年天津市河东区高一上学期期末质量检测数学试卷(含答案)
- 信永中和笔试题库及答案
- 甲流乙流培训课件
- 儿科学川崎病说课
- 2025《省建设工程档案移交合同书(责任书)》
- 2025年云南农垦集团总部春季社会招聘(9人)管理单位笔试遴选500模拟题附带答案详解
- 《石油钻井基本知识》课件
- 2024新沪教版英语(五四学制)七年级上单词默写单
- 电力两票培训
评论
0/150
提交评论