




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Page 1Supplier TrainingGP-5December, 2001 EditionPage 2Supplier TrainingPurpose:Train Supplier personnel on changes to GP-5/GQTSProcess:Explanation of GP-5 enhancements and screen shots of GQTS enhancementsProduct:Understanding of process and system enhancementsPage 3Supplier TrainingOverview of cha
2、nges made to the procedureOverview of PRR System Changes in GQTSDescription of GM SupplyPower GP-5 folderWhat does this GP-5 Training Include?Page 4Supplier TrainingChanges to GP-5Control and Rework CompanyA company approved by General Motors to perform controlled shipping level 2 inspections or oth
3、er work necessary to ensure product quality. This company performs directly under the responsibility of the supplier.Line AccumulationsLine accumulations are defined as unavoidable discrepancies or singlecases of commodities where only initial response is needed. These PRRs will be issued on a month
4、ly basis per part or part group.Definitions added to GP-5Page 5Supplier TrainingQuality Performance Reports Monthly 6 panel charts that graphically display the data contained in GQTS. Charts display the following:Major Disruptions (Spills, Downtime, Stockouts)PRRsDiscrepant PartsPPMSourcing MetricsS
5、upplier evaluation system that ranks each supplier manufacturing location in terms of overall quality in one of three categories: green, yellow or red. The ranking criteria are based on the historical commodityperformance. (Example Enhanced Metric Bid List)Changes to GP-5Definitions added to GP-5Pag
6、e 6Supplier TrainingChanges to GP-5Packaging PRRs (section 4.2.2)Packaging PRR s are now defined as packaging issues that cause part/specification nonconformity, or effect salability of the part. Examples: Damaged part or material that was inadequately secured in the container Container was inadequa
7、tely secured in the carrier vehicle and caused part/material damage Container design and/or fabrication was inadequate and caused part/material damage Container that has been damaged by improper handling and caused part/material damage Mixed pallets built incorrectly and caused part/material damage
8、Parts not packaged to specification for servicePage 7Supplier TrainingChanges to GP-5Line Accumulation PRRs (section 4.3) The Line accumulation PRR should be entered in the system only after the full impact and the monthly quantity is available to the issuer. When it is appropriate for the plant, th
9、e PRR may be issued with the first occurrence of the discrepant part. Regular adjustments of the volume will then be made during the month. For awareness purposes, the issuer should indicate the possibility of adjustments when issuing the PRR.Page 8Supplier TrainingChanges to GP-5Problem Location an
10、d Direct Run Indicator (section 4.3.2) Issuer must indicate on the PRR where the problem was found. (Phase drop down box) Issuer must indicate on the PRR if the issue affects Direct Run Rate. (Direct Run Rate check box)Page 9Supplier TrainingChanges to GP-5Quantity Checked (section 4.3.6.2) The “1%
11、or 30 pieces” requirement replaced by the following wording:“The quantity checked MUST be of a statistically significant size to represent the percentage defective within the batch.”Page 10Supplier TrainingChanges to GP-5Quantities for Label Issues (section 4.3.6.4) For parts shipped in bulk such as
12、 fasteners, labels, etc. (that are received in large quantities at manufacturing locations) mislabel problems will be counted using the following escalation process.First labeling offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the suppli
13、er (Quantity nonconforming and estimated quantity nonconforming = 1) Second offense (at a particular Duns location, in last 15 months) Issuer counts only one quantity discrepant against the supplier (Quantity nonconforming and estimated quantity nonconforming = 1) The supplier will also be placed on
14、 Controlled Shipping Level 1.Third offense (at a particular Duns location, in last 15 months) Issuer counts all parts against the supplier. The supplier will also be placed on Controlled Shipping Level 2. Page 11Supplier TrainingChanges to GP-5Quantities for Label Issues (example - section 8.4)A PRR
15、 is written to a supplier for mislabeling a pallet of ten boxes of screws, each box containing 1,000 screws.If this is the suppliers first labeling offense:Quantity Checked:1000Quantity Nonconforming: 1Quantity Suspect:1000Est. Quantity Nonconforming: 1If this is the suppliers second labeling offens
16、e:Quantity Checked:1000Quantity Nonconforming: 1Quantity Suspect:1000Est. Quantity Nonconforming: 1If this is the suppliers third labeling offense:Quantity Checked:1000Quantity Nonconforming:1000Quantity Suspect:1000Est. Quantity Nonconforming:1000Page 12Supplier TrainingChanges to GP-5PRR Closure (
17、section 4.3.8) A PRR is considered closed after the customer has moved the PRR from an “Open or “Rejected” status to an Approved status. A new status field is being added to GQTS.Page 13Supplier TrainingChanges to GP-5Timeliness of Final Response (section 4.4.5) Suppliers will be measured on the tim
18、eliness of their final response. The following timestamps will be captured in the database only Implemented date Approved dateGM will use the timestamps to calculate the following metrics: Time to Implementation (Implementation date - Issue date) Time to Closure (Approved Date - Issue date)Page 14Su
19、pplier TrainingChanges to GP-5General Updates New Business Hold added to procedure (section 6.0) Issues that affect multiple plants counted as only one major disruptionPage 15Supplier TrainingPRR System Changes in GQTS This field indicates whether the PRR has an impact on the Direct Run Rate. An unc
20、hecked value indicates that the PRR does not impact the Direct Run Rate of the plant. A checked value indicates that the PRR impacts the Direct Run Rate of the plant. This field will default to unchecked.Page 16Supplier TrainingPRR System Changes in GQTSThis will automatically classify the PRR Recor
21、d as both “Problem Identified” and “Implemented”. Secondary Nonconformance is set as “Line Accumulation - Only Initial Response Required”Supplier has entered only the Initial response In Step 1: Initial Response, the Conforming Material Date field is set to the first day of the month following the c
22、urrent month. This field is set to this default value even if the supplier user had previously input a date to this field.In Step 3: Problem Identification and Action Plan, the following fields will be set (if the user entered a value for one of these fields, the user entered value will not be chang
23、ed):Root Cause drop list field to the value Other.Corrective Action Implementation Date field to current system date.Date Changes to FMEA will be Complete field to current system date.Date Changes to Process Control Plan will be Complete field to current system date.In Step 4: Implementation Process
24、, text “Not Required” will be placed in the Institutionalized text area.Line Accumulation PRRsPage 17Supplier TrainingPRR System Changes in GQTSSelect a category Phase box will no longer default to “ Production” Default will be “Select a Category” User must make a selection that represents where the problem was found.Page 18Supplier TrainingPRR System Changes in GQTSCustomer Response added as Step 5 on Supplier Response page. - Radio button added for Status - Default value is Open - Field can be updated at any time by a GM user ID with PRR upda
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 【正版授权】 IEC 63119-1:2025 RLV EN Information exchange for electric vehicle charging roaming service - Part 1: General
- 单位工会知识课件
- 河南17年数学试卷
- 中国智慧商城建设市场竞争格局及投资战略规划报告
- 中国硅能蓄电池行业市场深度研究及投资战略规划建议报告
- 健康科普知识培训课件
- 中国建材机械行业发展趋势及投资前景预测报告
- 年产400台套矿山机械设备项目可行性研究报告模版
- 2025年中国超声波流量计行业市场调查研究及投资潜力预测报告
- 营运车辆gps管理办法
- 普及心理健康
- 脊髓损伤的护理课件
- 海尔冰箱BCD-210DCX使用说明书
- 生物膜技术革新:MBBR与IFAS工艺中功能性生物膜挂膜驯化的深入探讨
- 全国工会系统经审业务技能大赛知识题(附答案)
- 2023年国家烟草专卖局笔试真题
- 心肺复苏课件
- 2025至2030全球及中国企业文件共享和同步(EFSS)行业产业运行态势及投资规划深度研究报告
- 2025年新高考1卷(新课标Ⅰ卷)英语试卷
- 河北省沧州市2023-2024学年七年级下学期期末数学试题(冀教版)
- 金属与石材幕墙工程技术规范-JGJ133-2013含条文说
评论
0/150
提交评论