




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、asmchapter 6asmbond stick on ball(bsob)/bond ball on stitch(bbos)/ tail breakasm1.0) bond stick on ball(bsob)1.1) descriptionthis bonding process is specially developed by asm to handle multi-die(mcm) bonding application. in the conventional approach, if one is trying to connect the gold wire from o
2、ne die to the another, a capillary mark of second bond will be evident on top of the die which may damage the die. the bsob process will solve this problem by bonding a ball onto the dies surface first, followed by bonding another wire where the second bonds wedge will be landing on top of this bond
3、ed ball(figure 1).asmdie 1die 2bond ball2nd bond(wedge)1st bond figure 1 : bond stick on ball(bsob)asm2.0) bond ball on stitch(bbos)/ security bond2.1) descriptionthis process is also known as security bond. it bonds a ball on top of the wedge of the normal connection wire.this process is mainly use
4、d to secure the second bond sticking capability.(figure 2)die 1leadbond ball2nd bond(wedge)1st bond figure 2 : bond ball on stitch (bbos)asm3.1) free air ball (fab 2)is aligned to the center of the bond pad on device 2.device 1device 2fab 23.0 standoff ball control bonding sequenceasm3.2) capillary
5、descends and bonds ball to bond pad.device 1device 2w/clamp opencapillaryapplication of 1st bond stand off ball parameter to form ball thickness and ball sizeduring stand off bonding , sob parameters are applied .asm3.3) capillary rises to loop base to clear ball.device 1device 2w/clamp opencapillar
6、y rises to set loop baseloop basecontact pt.loop base is the distance between the capillary tip and contact point.recommended setting = 2asm3.4) capillary move to programme ball offset. ball offset can be programmed towards or away from the first bond. + ve towards 2nd bond - ve away 2nd bond device
7、 1device 2w/clamp openactual ball offset = setting x 10umif ball offset setting = 22then actual loop base =220umrecommended setting = - ve 35asm3.5) capillary descends and forms stitch bond on top of the ball.device 1device 2w/clamp open*ball thicknesssob parameter (stand off ball parameter)capillar
8、y descends to set ball thickness (amt. z movement above the ball height)contact pt.* ball thickness is the distance between the capillary tip and contact point recommended setting = 2 asm3.6) capillary moves horizontally for a scrub distance to weaken the wire at ball neck.device 1device 2w/clamp op
9、enscrub one direction away from ballactual scrub distance = setting x 0.8 umif scrub distance setting = 10then actual scrub distance = 8 um capillary move to set scrub distance one direction only - away from the ball recommended setting = 8asm3.7) capillary rises to tail heightdevice 1device 2w/clam
10、p closecapillary moves to set tail length (amount z movement above the bump before the wire clamp closes)recommended setting = 35asm3.8) capillary rises and tears the wire, as bh ascend to fire level.device 1device 2w/c closeasm3.9) efo fires to form free air ball. cycle repeats until all “standoff
11、ball” are placed.device 1device 2bond ballfabasm3.10) after placing all standoff balls. the machine continue to bond wires. 2nd bond(wedge)1st bond device1device2device1bond ballasmbump ball formation for bsob/bbosmotion bo lb bt scnormallbbobtscrubflatlbbobtscrub=0conelbbobt=lbscrub=0 lb bo bt lb b
12、othe bump ball formation process is almost like bonding a normal wire, including 1st bond, looping and 2nd bond parameters.asm4.0) parameter definition in stand off ball control menu4.1) loop basethis parameter determines the loop level of the bondhead which should be sufficient to avoid the ball.ra
13、nge: loop base 0 5setting : 24.2) ball offsetthis setting controls the distance of the table move in order to offset the capillary from the standoff ball.negative value can be moved towards to the first bond.positive value can be moved away from the first bond.range: ball offset - 40 20setting : - v
14、e 35 asm4.4) scrub distancethis setting controls the capillary moves horizontally with a scrub amplitude to weaken the wire at neck. it is always away from thefirst bond.range: scrub dist 4 12setting : 84.5) tail lengththis setting controls the length of the tail where the bondhead rises to the pres
15、et height before the wire clamp is closed. range : tail length 30 40setting : 354.3) ball thicknessthis parameter refer to the ball thickness which controls the level of the bondhead as it descends to the top of the ballrange: ball thickness 0 5setting : 2asm4.6) time base 1/2this setting controls t
16、he bond time applied to the standoff ball control only. time 1 for the 1st bond and time 2 for the 2nd bond.4.7) power base 1/2this setting controls the ultrasonic power applied to the standoff ball control only. power 1 for the 1st bond and time 2 for the 2nd bond.4.8) force base 1/2this setting co
17、ntrols the bonding force applied to the standoff ball control only. force 1 for the 1st bond and force 2 for the 2nd bond.asm4.9) standby power 1/2this setting controls the power activated when the bonding head reach the search level, to the moment the bond head contacts the bond surface. with the v
18、ibration, before contact take place. bond head will clean up the pad surface and remove water vapor on the pad. this parameter used for the standoff ball control only.4.10) contact time 1/2refer to the contact time 1/2 definition in bond parameter menu. but this parameter will be affected on the sta
19、ndoff ball control only.asm4.11) contact power 1/2refer to the contact power 1/2 definition in bond parameter menu. but this parameter will be affected on the standoff ball control only.4.12) contact force 1/2refer to the contact force 1/2 definition in bond parameter menu. but this parameter will b
20、e affected on the standoff ball control only.asmfigure 4 : standoff ball control parameter display(page 2)5.0 bsob wire parametersasm5.1) wire offset in -menuthis is the offset parameter that is required to ensure maximum contact area between the stitch bond and ball. it is always away from the firs
21、t bond.range: wire offset 10 30 recommended setting = 255.2) second bond search speedthis parameter controls the impact for stitch on ball. range: search speed 2 32 256recommended setting = 322nd bond wedgestand off ballcapillary position during stitch bondasm5.3) time base 1/2this setting controls the bond time applied to the device. time 1 for the 1st bond and time 2 for the 2nd bond. 5.4) power base 1/2this setting controls the ultrasonic power applied to the device. power 1 for the 1st bond and time 2 for the 2nd bond.5.5) force base 1/2this setting controls the bonding force applied to
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 深圳市二手房装修工程施工合同
- 跨国(非独占)品牌授权合作合同专业版
- 劳动合同判例解析:合同纠纷与法律适用
- 实习生实习与就业合同书
- 反担保责任合同模板
- 购销合同的反担保书
- 全球商标使用权转让合同
- 实习人员合同范本
- 终止建筑工程合同协议书
- 企业学徒工用工合同范本
- 开学安全第一课主题班会课件
- 一年级珍惜粮食主题班会学习教案
- 新版《医疗器械经营质量管理规范》(2024)培训试题及答案
- 2025年人教版数学五年级下册教学计划(含进度表)
- 海岸动力学英文课件Coastal Hydrodynamics-复习
- 碳足迹研究-洞察分析
- DB11-T 1191.3-2024 实验室危险化学品安全管理要求 第3部分:科研单位
- 硬质岩层组合切割开挖技术
- 2024解析:第二章声现象-讲核心(解析版)
- 2024年考研管理类综合能力(199)真题及解析完整版
- 2025年初级社会工作者综合能力全国考试题库(含答案)
评论
0/150
提交评论