zyq土方回填施工方案_第1页
zyq土方回填施工方案_第2页
zyq土方回填施工方案_第3页
zyq土方回填施工方案_第4页
zyq土方回填施工方案_第5页
已阅读5页,还剩8页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、videoconference, Secretary of the provincia l Committee ofXia Baolong stressed: this year is the five water treatment 357timetables for three years to resolveoutstanding issues,obviously worked, victory of the year.The Countys departments at all levels must firmly establish the guanghui is gold a nd

2、 silver greendevelopment concept, convinced that Castle is not relaxed, always maintaini ng strategic ability and strong determination to improve the envir onment, consistently playing well five water treatment of winning the war, ever-hig her level s of comprehe nsivewell-off society wasbuilt. (A)

3、lay the sewageownuphill battle. This year we will river waterquality improved at the county level, up to five this basicobjective grasp of pollution control that focus,with the focus on three things: a good job, clear rivers reaching the Countycreated. Organization look back special inspection, the

4、County garbage River, black and odorous River is Dragnet investigation, timely rectificationof problems found in pl ace firmly to prevent river pollution re bound. Inaccordance with theone-stopstrategy, improving the inferior five waterqua lity monitoring stationswork this year to e nsure theElimina

5、tion of 1provi ncial control, five waterquality section 3 municipalities controlled deterioration, ensur e the creation this year of clear rivers standards. Se cond, pay special attention topoll ution-cuttingconstruction of nanotubes. Intercepting nanotubes are the basis of pollution of water source

6、 engineering, e ngineering, m atter of successor failureof water management. Urban sewage treatment, toimprove effluent from sewage treatment rate, running a ccuracy, compliance requirement,speed up the ts support network construction, is focusing on nanot ube s home last meters question. Domestic s

7、ewage treatment in rural areas, this year is the final yearof the three-year action, determination to fight and t he momentum around, ending the battle on which fully to e nsure the realizationof all County 648 formed villagewastewater treatment facility up and r unning, role play, avoid the Sun pro

8、blem. Third,pay special attention to t he River Lake pond desilting operation. Provinces now have focusedon pollutioncontrol of water go to digup mud, as thedeepeni ng water of this years plays.Next, to jump-start an investigation line touches work, implementationplan a ccording to the priorities a

9、nd the programme of work, in accordance with the one river onepoli cy requires detailed cleaning, dredging pl an,planning a headof time cleaning out mud way out, according to local conditi ons to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavilyp

10、oll uting industries. Pollution of water must grab the source, wastewater isprimarily the source of backwardproductioncapacity, increa se the intensity of西安建筑科技大学高层教工住宅楼土方回填施工方案编制:时间:审核:时间:陕建五公司建大高层住宅楼项目部2005年 1月 19日treatment of heavilypolluting industries. According to municipal, and municipalgover

11、nment deployment of seven big heavypollution industry regulation three years action pla ns, requirements to December 2016 end ofQian, all include d shut st opped eliminated of enterprise allshut stopped eliminated in place; June 30,2017Qia n, all incl ude d place reg ulation upgradeand agglomeration

12、 restructuri ng of enterprise byunified standard regulation in place, latenot sta ndard of enterprise are implementation discontinued; June 30, 2018 Qian, all intendsPark production of enterpri se relocation Parkin place, late not Parkof are discontinued. In theprocessof renovation, will focus on fo

13、ur aspects: t o firmly close the high energy consumption andheavy pollution,hopeleenterprises to the Park, industrialpark, inprincipl e, no longer theclass on thenewproject. Thirdly, promoting repla cement and reconstruction of heavilypol luting industries, mergers and reorgang rural drinizations, g

14、uide enterprises t o energy conservation, re cycli ng and low-carbon and cleanproduction,and improve the level of green developme nt.Four to establish a long-term supervision mechanism, increase the intensity of special inspections, i nvestigate and punish the rectification i s not inplace , normal

15、businessof running anti-pollution installations do not. (Iii) linkage topromote flood control water, drainage, watersupply, improving water saving. Speedup cross Yang support riverdike reinforcement,and along Pu seawall except insurance reinforcement, andLakeQianessentiallysol ution basin sex, and r

16、egional flood control drainagecapa city insufficientof problem. V igorously implement the piers, algae and other water sourcesprote ction and, promotinking watersafety projects, settingup waterprici ng reform and environmental protection mechanism, guiding water depth. Further soil pollution and rep

17、air, strengthen agricult ural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tightencontrol, to play three to split battle. XiaBaolong , Secretary of provincial party Committee stressed that while the three to split opera

18、tion time isover three years, but three to split mustconti nue to catch on, and resolve asplit cannot becha nged.All localities and departments to the village and no unauthorised createdvideoconference , Secretary of theprovincial Committee of XiaBaolong stressed: this year is the five water treatme

19、nt 357 timetables for three years to resolve, five water quality seoutstanding issues, obviously worked, victoryof the year.The Countysdepartments at all levels must firmly establish the guanghui is gold and silver green developme nt concept, convince d that Castle is not relaxed, always maintaionni

20、ng strategic ability and strong determination to improve tss or failhe environment,consiste ntly playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society wasbuilt. (A) lay the sewageuphill battle. This year we will river water quality improved at the

21、 county level, up to five this basic objective grasp of pollution control that focus, with the focuson three things: a good job, clear riveron to fight as reaching the County created. Organization look baon wck special inspection, the County garbage River, blackand odorous River is Dragnet investiga

22、tion, timely rectification of problems found in place firmly to prevent river pollution re bound. In accorda nce with theone-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure t he Elimination of 1 provincial controlction 3 municipalities controlled

23、deterioration, ensure t he creation this year of clear rivers standards. Second, pay special attention to pollution -cutting constructionof nanotubes. Intercepting nanot ube s are the basis of pollutiof water source e ngineering, e ngineering, matter of succeure of water management. Urbansewage trea

24、tment, to improve effluent from sewage treatment rate, running accura cy, compliance requirement, speed up the towns support network construction, i s focusing on nanotube s home last meters question. Domesticsewage treatment in rural areas, this year is the final year of the three-year action,deter

25、minatind the momentum around, endi ng the battlehich fully to ensure the realization of all County 648 formed villagecoverage. Also, be sure to attach importance to focuson ruraldomestic wastewater treatment facility operation and management, ensure thatwastewater treatment facility up and r unning,

26、 role play, avoid the Sun problem. Third,pay special attention to the River Lake pond desilting operation. Provinces now have focusedon poll ution control of water go to digup mud, as thedeepening water of this years plays.Next, to jump-start an investigation line touches work, implementationplan a

27、ccording to the pri orities and the programme of work, in accordance with the one river onepoli cy requires detailed cl eaning, dredging pl an,planning aheadof time cleaning out mud way out, according to l ocalconditi ons to do sludge, promote scientific resource utili zation of silt and mud. (B) th

28、e heavy regulation of heavilypoll uting industries. Pollution of water must grab the source, wastewater isprimarily the source of ba ckwardproductioncapacity, i ncrea se the i ntensityof目录1工程概况-22编制依据-23施工条件-24施工准备-35施工方法及施工工艺流程-56土方回填试验方法-117季节性施工要求-118质量要求及保证措施-129质量记录-1310文明施工及安全生产要点-13treatment

29、of heavily polluting industries. According to muni cipal, and municipal governmentdeployment of seven bigheavy pollution industry regulation three years actionplans, requirements to December 2016 end of Qia n, all included shut stopped eliminated of enterprise all shut stoppedeli minated in place ;

30、June 30, 2017 Qian, all includedplace regulation upgrade and agglomeration restruct uring of enterpriseby unified standard regulation in place, latenot standardof enterprise are implementationdiscontinue d; June 30, 2018Qian, all intends Parkproductionof enterprise relocation Park in pla ce, late no

31、t Park of are discontinued. In the processof renovation, wi ll focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance a nd production lines, eliminated a numberof yearly emission intensity, low value-adde d products of backwar d product

32、ion capacity. Second, we must strictly enforce the space, total project Trinity environment accesssystem, promoting industry aenterprises to thePark, industrialpark, inprinciple, no l onger the cla ss on the new project. Thirdly, promoting replacement and reconstructi on of heavily polluting industr

33、ies, mergers and reorganizations, guide enterprises to energy conservation, recycling a nd low-carbon and cleanproducti on, and improve the level of greendevelopment.Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectifi

34、cation is not in place,normalbusi ness of running anti-pollution installationsdonot. (Iii) linkage topromote floodcontrol water, drainage, water supply, improving water saving. Speed up crossang support river dike reinforcement, and along Pu seawall except insurance reinforcement, andLake Qian sluic

35、e, and BACao sl uice, and cloud cover reservoi r, focus flood controldrainage engineering construction, vigessentiallysol ution basin sex, and regional flood control drainagecapa city insufficientof problem. V igorously implement the piers, algae and other water sourcesprote ction and, promoting rur

36、al drinking watersafety projects, settingup waterprici ng reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricult ural non-point source pollution prevention, mountain, water, forests, fields, lakes, various e lements mutual long. Fou

37、r, manage to tightencontrol, to play three to spl it battle. XiaBaolong , Secretary of provincial party Committee stressed that while the three to split operation time isover three years, but three to split mustconti nue t o catch on, and resolve asplit cannot becha nged.All localities and departmen

38、ts to the village and no unauthorised created1videoconference, Secretary of the provincia l Committee ofXia Baolong stressed: this year is the five water treatment 357 timetables for three years tncial control, five watero resolveoutstanding issues,obviously worked, victory of the year.The Countys d

39、epartments at all levels must firmly establish the guanghui is gold a nd silver greendevelopment concept, convinced that Castle is not relaxed, always maintaini ng strategic ability and strong determination to improve the envir onment, consistently playing well five water treatment of winning the wa

40、r, ever-hig her level s of comprehe nsivewell-off society wasbuilt. (A) lay the sewageownuphill battle. This year we will river waterquality improved at the county level, up to five this basicobjective grasp of pollution control that focus,with the focus on three things: a good job, clear rivers rea

41、ching the Countycreated. Organization look back special inspection, the County garbage River, black and odorous River is Dragnet investigation, timely rectificationof problems found in pl ace firmly to prevent river pollution re bound. Inaccordance with theone-stopstrategy, improving the inferior fi

42、ve waterqua lity monitoring stationswork this year to ensure theElimination of 1proviquality section 3 municipalities controlled deterioration, ensur e the creation this year of clear rivers standards. Se cond, pay special attention topoll ution-cuttingconstruction of nanotubes. Intercepting nanotub

43、es are the basis of pollution of water source engineering, e ngineering, matter of successor failureof water management. Urban sewage treatment, toimprove effluent from sewage treatment rate, running a ccuracy, compliance requirement,speed up the ts support network construction, is focusing on nanot

44、 ube s home last meters question. Domestic sewage treatment in rural areas, this year is the final yearof the three-year action, determination to fight and t he momentum around, ending the battle on which fully to e nsure twastewater treatment facility up and r unning, role play, avoid the Sun probl

45、em. Third,pay special attention to t he River Lake pond desilting operation. Provinces now have focusedon pollutioncontrol of water go to digup mud, as thedeepeni ng water of this years plays.Next, to jump-start an investigation line touches work, implementationplan a ccording to the priorities a nd

46、 the programme of work, in accordance with the one river onepoli cy requires detailed cleaning, dredging pl an,planning a headof time cleaning out mud way out, according to local conditi ons to do sludge, promote scientific resource utilization of siltand mud. (B) the heavy regulation of heavilypoll

47、 uting industries. Pollution of water must grab the source, wastewater isprimarily the source of backwardproductioncapacity, increa se the intensity of1 分项工程概况本工程 0.000 对应绝对标高为415.470 米,场地的地貌单元属于西安黄土梁洼地貌的梁间洼地,场地类别属类土。2 编制依据2.1建筑工程施工手册;2.2 建筑工程施工质量验收统一标准 (GB503002001);2.3 建筑地基基础工程施工质量验收规范(GB502022002

48、);2.4 建筑地基处理技术规范 (JGJ792002);2.5 地基勘察报告;3 施工条件3.1 现场出入口本工程施工现场在现场东北角又设置主出入口,材料运输通道, 也可以在东侧围墙开门,以减轻场内运输困难。3.2 场外运输条件现场东南角处主出入口外边是城中村内道路,能够做大型施工机械和车辆通行使用,建设单位已与村上签定了道路借用通行的协议。3.3 场内条件施工现场内场地十分狭小。4 施工准备4.1 技术准备:按照施工要求,将材料送试验室做击实试验,确定最大干密度时的最优含水量。在土方施工队伍进场后, 项目部专业技术人员应积极的做好土方工程施工技术交底。由项目技术部门及专业工长对进场人员进行

49、安全技术交底,reatmentof heavily polluting industries. According to municipal, and municipal government deployment of seven bigheavy pollution industry regulation three years action plans, requirements to December 2016end of Qia n, all includedshut stopped eliminated of enterprise all shut stopped el iminated in place; June 30, 2017 Qian, all include d place regulati on upgrade and agglomeration restruct uring of enterpriseby unified standard regulation in place, latenot sta nd

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论