1、Quality Assurance Surveillance Plan For MedlinePlus And MedlinePlus en espa?ol Development and SupportDate May 14, 2007Reviewed:Reviewed:QAPCContracting Officer41. PURPOSEThis Quality Assurance Surveillance Plan (QASP) provides a standard of surveillance for MedlinePlus and MedlinePlus en espao?l de

2、velopment and support services and a systematic approach for conducting surveillance over the performance aspects of the effort. The QASP is for the use of government Quality Assurance (QA) personnel to insure standards of the contract are being met. For the purposes of this effort the QA is the Gov

3、ernment Project Officer or her representative.The QASP provides a systematic method to evaluate the services that the Contractor is required to furnish, but not the details of how the Contractor accomplishes the work. This plan uses inspection as the primary evaluation criteria. This surveillance as

4、sures the Government that the Contractosr performance is acceptable. The termAny noncompliance with contract performance is deemed “ sub par “ sub par ” refers to a support service that does not meet the standard of performance specified in the contract. The Contractor not the Government is responsi

5、ble for management and quality control actions to meet the terms of the contract. The methods of surveillance recognize that unforeseen and uncontrollable problems do occur. Effective management and use of a quality control plan will allow the Contractor to operate within the specified surveillance

6、requirements. QA s are expected to be objective, fair, and ecnotnisnist evaluating Contractor s performance against the standards.2. PROCEDURES2.1 Quality Assurance ScheduleThe Contractor s performe awnilcl be evaluated every six months following the exercise of the first option year. (The first twe

7、lve months of the contract is considered an introductory period, during which the Contractor is not required to meet the performance standard.) If the Cotnractor s performadnucreing the base effort is considered satisfactory, than the Government intends to award an option for 12 additional months.2.

8、2 SurveillanceIn accordance with the Statement of Work the Senior Contractor reviewer (SCR) will submit the completed topic reviews to the Government Project Office (QA). The QA will inspect task performance by sampling 10-15% of the topic reviews to determine the accuracy of the topic reviews. The

9、QA will also randomly inspect site records, topic reviews and other work for adherence to proscribed procedures.All surveillance inspections made by the QA will be recorded on a Government or locally devised form. Documentation will record the Contractor s pastperformance. The completed form(s) beco

10、mes the official Government record of the Contractor s performance.When surveillance detects unacceptable service, the QA will record the information on the checklist and request the Contractor to verify via email the unacceptable service. The Contractor will be required to resubmit the corrected to

11、pic review pages. The results will be recorded on the checklist.3. Method of SurveillanceSamplingThe Project Officer (QA) or representative will sample 10-15% of the completed topic reviews every two weeks.Random inspections to verify adherence to proscribed procedures may occur at any time.3. UNACC

12、EPTABLE PERFORMANCEWhen performance is deemed unacceptable, the QA will so inform the Contractor s Senior Contractor Reviewer, explain why, and request confirmation from the SCR via email. By submitting the email confirmation, the SCR is only acknowledging notification of unacceptable performance, n

13、ot admitting fault. Disputes in surveillance should be referred to the Contracting Officer.The QA will notify the Contracting Officer of sub par performance. If any services do not conform to contract requirements, the Government may require the Contractor to reperform the contract requirements at n

14、o increased cost to the Government. When sub-par performance cannot be corrected by re-performance the Government may:? Require the Contractor to take action necessary to ensure future performance conforms to contract requirements.? Reduce the contract price to reflect the reduced value of the servi

15、ces performed.If the Contractor fails to promptly re-perform the services, or to take the necessary action to ensure that future performance conforms to contract requirements, the Government may:By separate con tract or otherwise, perform the services and charge to the Con tractor any cost in curred

16、 by the Gover nment that is directly related to the performa nee of such service or:o Issue a Cure Noticeo Issue Show Cause Noticeo Termin ated the con tract for Convenienceo Termin ate the con tract for Default4. SURVEILLANCE GUIDEThe QASP Surveilla nee Guide defi nes the performa nee objective and shows the pertinent porti on of the Performa nee Work Stateme nt, the Performa nee Threshold and the Gover nment s Method of Surveilla nee for this eon tract.Performa neeObjectivePerforma nee ThresholdMethod of Surveilla neeTopic Review pages submitted by the Senior Con trac

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论