ProE中的装配关系建模(英文论文)_第1页
ProE中的装配关系建模(英文论文)_第2页
ProE中的装配关系建模(英文论文)_第3页
ProE中的装配关系建模(英文论文)_第4页
ProE中的装配关系建模(英文论文)_第5页
已阅读5页,还剩18页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、mechanical cad / cam reportpro / e with the modeling of the assembly relationshipcollege:mechanical and electrical collegemajor: mechanical design and manufacture of brakeclass:072093name: 聂俊杰student id:20091003886expect score:92may 2012contents1. pro / e introduction12. modeling of the bearing32.1.

2、 cage modeling32.2 bearing inner ring82.3 bearing outer ring92.4 ball bearings102.5 bearing assembly113. modeling of the shaft144. modeling of the gear155. general assembly191. pro / e introductionpro / engineer operating software is parametric technology corporation (ptc) for its three-dimensional

3、cad / cam / cae integration software. the pro / engineer software for parameterization parameter technology the earliest application by the current three-dimensional modeling software, possession with an important position of pro / engineer as a new standard for todays world machinery of cad / of ca

4、e / the cam fields and get the industry recognition and promotion. is now one of the mainstream cad / cam / cae software, in particular, occupy an important position in the domestic field of product design.pro / e first proposed the concept of parametric design, and uses a single database to solve t

5、he problem characteristics. in addition, it uses a modular approach, users can choose according to their needs, without having to install all the modules. pro / e based on feature, the ability to design to production to the whole process of integration, concurrent engineering design. it can not only

6、 applied to workstations, but can also be applied to a single machine.pro / e uses a module, can sketch, parts production, assembly design, sheet metal design, processing, and ensure that the user can choose to use according to their needs.1a parameter of the designrelative to the products, we can s

7、ee it as the geometric model, no matter how complex the geometry model can be decomposed into the composition of the limited number of characteristics, of each characteristic can be fully constrained with limited parameters, whichparameters of the basic concept. 2. feature-based modelingpro / e is a

8、 feature-based solid modeling system, the engineering staff with intelligent features of the model generated based on the characteristic function of cavity, shell, chamfered and rounded corners, you can freely sketching, and easily change the model. this features provide engineering designers never

9、had the design simple and flexible. 3. a single database (all related)pro / engineer is to establish the database on the unified grass-roots, unlike some of the traditional cad / cam system is built on multiple databases. the so-called single database, project information from a library in a product

10、 modeling work makes each individual user, whether he is what a department. in other words, changes occur in any one of the design process as a whole, and also before and after the reaction on the relevant link in the entire design process. for example, once the engineering detail change, nc (nc) to

11、ol path is automatically updated; assembly drawings any changes, exactly the same reaction in the three-dimensional model. this unique data structure and engineering design complete combination of a product designed to combine. this advantage, making the design more optimized, higher quality finishe

12、d product to better market, the price is cheaper.2. modeling of the bearingbearing modeling, including modeling of the cage, the modeling of the bearing inner ring, the bearing outer ring of the modeling and the modeling of ball bearings.2.1. cage modelingopen the proe / e election with the new part

13、s of new command;1. selected stretch command reference plane select the top plane to draw the sketch shown in figure 2-1;figure2-12. figure2-1 grass figure is completed, enter the stretch depth of 30 to complete the stretch. get such as figure2-2 as shown in figure-shaped.figure2-23. select the rota

14、te command, the reference plane select the top plane, draw figure2-3 grass shown in figure.figure2-34. figure2-3 grass figure drawing is complete, enter the rotation angle of 180 degrees to complete the rotation, to get such figure2-4 as shown in figure-shaped.figure2-45. first select the shape of t

15、he rotation of figure, and then select the axis of the array command array. input angle of 36 degrees, the number 10, complete the array. then select the rotate command, the reference plane select the top plane, draw the figure2-5, such as grass figure. have been completed such as figure2-5 figure-s

16、haped.figure2-56. completed the figure2-5 grass figure drawing, select this rotation axis array of array command input angle of 36 degrees, the number 10, complete the array. get such as figure2-6 as shown in figure-shaped.figure2-67. select stretch command, the reference plane select the top plane,

17、 draw the grass shown in figure figure2-7;figure2-78. grass figure drawing is complete, choose to remove the material, complete the stretch to get the shape as shown in figure2-8 figure. figure2-89. figure2-8 as shown in figure-shaped, and then select the mirror command to create the image, as shown

18、 in figure2-9 figure-shaped. figure2-9through the above steps to complete the drawing of the cage.2.2 bearing inner ringopen the pro / e election with the new parts of new command;1. select the rotate command, the reference plane select the top plane. draw grass such as figure2-10 as shown in figure

19、, be sure to draw the central axis.figure2-102. grass figure drawing is complete, the completion of rotation figure-shaped as shown in figure2-11, complete the production of the bearing inner ring.figure2-112.3 bearing outer ringopen the proe / e election with the new parts of new command;1. select

20、the rotate command, the reference plane select the top plane.draw grass such as figure2-12 as shown in figure, be sure to draw the central axis.figure2-12 2. grass figure drawing is complete, the completion of rotation figure-shaped as shown in figure2-13, complete the production of the bearing inne

21、r ring.figure2-132.4 ball bearingsopen the proe / e election with the new parts of new command;1. select the rotate command, the reference plane select the top plane.draw grass such as figure2-14 as shown in figure, be sure to draw the central axis.figure2-142. grass figure drawing is complete, comp

22、lete the rotation such as figure2-15 as shown in figure-shaped, to complete the production of ball bearings.figure2-152.5 bearing assemblyopen the proe / e selected the new command on the new components;1.select the assembly to add the component to the assembly, the first bearing inner ring is added

23、 to the assembly, select the default. get such as figure2-16 as shown in figure-shaped.figure2-162. select the assembly to add the component to the assembly, the bearing balls added to the assembly, select the tangent to the bearing inner ring with. get such as figure2-17 as shown in figure-shaped.f

24、igure2-173. figure2-17 assembly, this ball is selected, select the axis of the array command array input angle of 36 degrees, the number 10, complete the array. get such as figure2-18 as shown in figure-shaped.figure2-184. select assembly components are added to the assembly, the bearing outer ring

25、is added to the assembly, select the alignment with the bearing inner ring with the. get such as figure2-19 as shown in figure-shaped.figure2-195. select assembly components are added to the assembly, the bearing to maintain the aircraft added to the assembly, select the alignment with the bearing i

26、nner ring with the same time paired with one ball tie. completion of the assembly such as figure2-20 as shown in figure-shaped.figure2-20above assembly can be assembled bearing.3. modeling of the shaftfigure3-1open proe / e, the election of new parts of new command; end by calling the stretch comman

27、d, such as figure 3-figure 1 shows the shape. complete shaft modeling.4. modeling of the gearopen the proe / e election with the new parts of new command;1. select a drawing command, the reference plane select the top plane. draw such as figure4-1 as shown in grass figure.figure4-12. completion of s

28、tretching, to get such as such as figure4-2 as shown in figure-shaped.figure4-23. select a drawing command, the reference plane select the top plane.drawing, such as grass shown in figure figure4-3.figure4-34. to complete the stretch removal, get, such as such as figure4-4 as shown in figure-shaped.figure4-45. select extruded cut command, the reference plane select the top plane. draw such as figure4-5 as shown in grass figure.figure4-56. sel

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论