公交车调度方案设计_第1页
公交车调度方案设计_第2页
公交车调度方案设计_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、公交车调度方案设计 公交车调度优化模型设计  摘要  本文所要解决的是公交车调度的问题,首先根据所具备的数据资料以及要求,考虑到乘客等车时间的限制,建立了1个线性模型,使所求得的调度方案更符合题目要求。然后,从乘客与公交公司的利益出发,设定1系列的指标,利用模糊评价的方法来对调度方案进行综合分析与评价。其次,把这个调度问题抽象成为1个数学规划模型,通过到本城市公交车站实地调查访问,得到运营数据的采集方法。最后,利用计算机模拟的方法对模型进行了检验,同时对模型的优缺点进行了分析,并提出改进方向。在模型1中,对问题1建立了求最大客容量、车次数、发车时间间隔等模型,运用

2、决策方法给出了各时段最大客容量数,再与车辆最大客容量比较,得出载完该时组乘客的最少车次462次,从便于操作和发车密度考虑,给出了整分发车时刻表和需要的最少车辆数61辆。模型2建立模糊分析模型,结合层次分析求得模型1带给公司和乘客双方日满意度为(0.941,0.811);根据双方满意度范围和程度,找出同时到达双方最优满意度(0.8807,0.8807),且此时结果为474次50辆;从日共需车辆最少考虑,结果为484次45辆。对问题2,交待了综合效益目标模型及线性规划法求解。对于问题3,借助了查阅资料和搜集数据。关键词  公交调度;层次分析;满意度。abstract this text

3、wants to resolve of is data data and requests that bus adjust a degree problems, have according to first, in consideration of horary restrict in car in etc. in passenger, established a line model, make begged of adjust a project even meet the topic request.then, hand over with  from the passeng

4、er the benefits of the company set out, setting up a series of index sign, making use of the method of the misty evaluation to make exchange a project proceed to synthesize the analysis and evaluate.the next in order, adjust an of thises degree the problem abstraction becomes a the piece learns to p

5、rogram the model, passing this city bus stop on-site inspection visit, being carried the camp data collects the method.finally, made use of the method that calculator imitate to proceed the examination to the model, at the same time to the merit and shortcoming proceeding of the model analysis, and

6、put forward to improve the direction.in model first, to problem 1 established to beg the biggest a capacity, car the number of times, hair car time partition etc. model, application decision the method gave the biggest a capacity in each time counts, comparing with biggest a capacity in vehicle agai

7、n, getting a minimal car for carrying overly should hour a passenger a minimal vehicle for 462 times, from the easy to operation with hair car density considering, giving first wholely distributing the car schedule with needing count 61.model two establish the misty analysis model, the combination l

8、evel of structure analysis begs the model on bringing the company with both parties day in passenger approval is;(0.941,0.811)according to both parties approval scope with degree, find out to arrive the both parties superior approval(0.8807,0.8807) at the same time, and the this time result is 474 t

9、imes 50;need the vehicle totally from the day minimal consider, result is 484 times 45.to the problem 2, handed over to treat to synthesize performance target model and line programming methods beg the solution.for the problem 3, asked for help to check the data with collects data.keywords the hands

10、 over to adjust degree; level of structure analysis;approval.1 前言公共交通是城市交通的重要组成部分。做好公交车的调度,对于完善城市交通环境、改进市民出行状况、提高公交公司的经济和社会效益,都具有重要意义。下面考虑1条公交线路上公交车的调度问题,其数据来自我国1座特大城市某条公交线路的客流调查和运营资料。该条公交线路上行方向共14个站,下行方向共13站,表1.1和表1.2给出的是典型的1个工作日两个运行方向各站上下车的乘客数量统计。公交公司配给该线路同1型号的大客车,每辆标准载客100人,据统计客车在该线路上运行的平均速度为20公里每小时。运营调度要求,乘客候车时间1般不要超过10分钟,早高峰时1般不要超过5分钟,车辆满载率不应超过120%,1般也不要低于50%

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论