1、1.1工程量计算表:序号项目名称计算部位计算规则及公式单位工程量1建筑面积一层26-31轴一层 26-31轴 s=(6.5+0.12)(7.8+0.12)+(8.1+0.12)(6.3+0.12)105.232六层全部 s=(0.6+0.3+1.8+3+2.2+2.6+2+3+3.3+1.2+0.12)(0.24+0.8+0.4+2.3+1.8+0.6+1.4+3.1) -(3-0.24)(1.2-0.24)0.52-(0.8-0.24) (0.6-0.24)-(1.2-0.12)5.9+0.62.64+(2.1+0.24+1.6)0.840.5+1.09)(1.63+0.77+0.240.7
2、70.5+(1.09+0.24+1.63)0.770.5+(4.2+0.24)1.80.52+1.2(3.6+0.24)505.4243七层d-21-31 右上侧s=(10.4+0.24)(8.1+0.12+0.6)+(2.1+0.24+1.6)0.840.5+(1.63+0.77+0.24+1.09)0.770.5+(1.09+0.24+1.63)0.770.5+(4.2+0.24)1.80.5-3.5(4.2-0.9)90.9624机械挖土 26-31轴总挖土方室外地坪以下v=a*b*h=(5.7+1.325)(3.1+5.9+2.87+2.83+1.47+ 0.75)2.4+(5.8+2
3、.9+0.575)(3.9+5.1+2.87+1.63+2.67)2.4m346.3394人工挖地坑26-31轴总挖土方室外地坪以下v=a*b*h=(2.8+2.9+0.575+0.75)(3.1+5.9+2.87+2.83+1.47+0.75)2.4+(5.8+2.9+0.575)+(3.9+5.1+2.87+1.63+2.67)0.2m28.8625机械夯填土填土26-31轴总挖土方室外地坪以下基槽(坑)挖土体积-设计室外地坪下建筑物被埋部分体积=346.399+28.862-17.242-26.834-3.456 m327.7296房心回填土室外地坪一下(室内回填土)26-31轴s=(a
4、+4)(b+4)=s底+2l外+16=137.079+(8.1+6.3+1.2+2.4+4.1+0.24+7.8+0.24)2+16m213.839 基础垫层7 独 立 基 础 垫 层26轴v=(2.62.6) 0.1m0.67626轴v=(22) 0.12=0.8 m3m0.826轴 (2.12.1) 0.1=0.441 m3m0.44130轴v=(2.62.6) 0.1=0.676 m3m0.67630轴v=2(0.1+0.665+1.63+0.665+0.1) 0.1m0.63230轴v=(0.875+0.025+0.9+0.2)(0.1+0.76+0.575+0.865+0.1) 0.
5、1m0.4828轴 v=2.2(0.1+1.085+1.7+1.015+0.1) 0.1m0.8829轴v=3.52.80.1m0.9827轴v=(0.99+2.8) (1.11+1.49) 0.1m0.985d轴v=(1.135+2.565) (1.15+0.95) 0.1m0.777 8 条形 基础 垫层 29轴-d轴v=(2.4+2.535+1.29+1.335-2.4) (1.410.6+0.480.98+0.086+0.360.15) m7.51830轴-31轴-26轴v=(0.95+0.95+1.2+1.2+1.4+2.7-1.96-0.6+2.87-0.665-1.9) (1.1
6、250.6+0.360.98)+0.086+0.240.15)m7.09126轴-30轴v=(2.3+1.2+0.6-0.925-1.9-1.2+4.8+3-3.9-0.935+1.2+0.6-1.59) (0.80.4+0.120.06+0.360.86+0.240.15)=m2.397 砌筑工程 墙体工程量=()h-门窗洞口面积)h9 外 墙 砌 筑 工 程 一层2631轴=(1.8-0.24+4.1-0.24+0.6+0.24+2.4-0.24+0.6-0.24+6.3-0.24+0.482+0.632)0.243.3-(0.9+0.5) 0.240.24m13.811六层全部(4.5+
7、(1.2+0.24)4+(3-0.24)2+2-0.24+(0.8+0.24)2+2.6-0.24+2.2-0.24+1.8+0.6+0.24+4.1+2.4+0.24+0.6+4.5-1.63+3.9-1.63+4.2+6.2+4.2+1.2+3.6+0.6952+1.4)0.24(3-0.15)-(1.81.5+2.72.72+1.51.53+0.91.54+1.52.4+1.62.12+1.51.25+0.521.5+1.50.24+1.21.5-(1.85+0.5+2.7+0.5)2+(1.5+0.5)3+(0.9+0.3)4+1.5+0.5+(1.6+0.5)2+(1.2+0.5)5
8、+2+1.2+0.5) 0.240.24 m54.348七层 d-21-31 右上侧(2-0.12+0.6+2.6+3.5+0.24+5.2+3.5+1.8+3-0.24+3.5-0.24+0.62+2.4-0.240.24(3-0.15)- (1.52.4+2.41.5+0.91.52+2.11.5)0.24- (1.5+0.52+2.4+0.5+0.9+2+2.1+0.5+0.9+0.5)0.240.24 m15.87710 内 墙 砌 筑 工 程条形基础采用c20烧结粘土砖 m10水泥砂浆眠砌v=0.36(0.62+0.36)+40.0630.125.16+0.090.245.16+0.
9、42(0.62+0.36)+40.0630.12+0.090.246.145+0.36(0.36+0.74)+30.0620.12+0.090.243.25+0.240.75(5.16+6.145+3.25)m9.688一层2631轴v=3+1.8+3-0.12+(0.6+3.5+2.4-0.24)2+6.3-0.240.24(2.7-0.15) m16.071六层全部3.5+1.8-0.24+3.5+2.3+2.2+5.9-0.8+5.9-0.8+2.6-0.24+2+2.3+2.3+5.9-0.24+3.6+1.8+0.24+2.3+6.7+4.5+4.5-0.36+4.5+5.25+6.
10、90.5(1.2+0.12+1.3+0.24+-0.18+1.8-0.24+2.4-0.24+2+2.18+1.98)0.12(3-0.15)-(0.82.15+0.92.14+1.42.12+12.12)0.24-(0.8+0.5)5+(0.9+0.5)4+(1.4+0.5)2+(1+0.5)20.240.24m96.884七层 d-21-31 右上侧(2-0.24+4.9-0.24+2.6+0.12+2.4+1.8+3.5+1.8+2.3)0.24(3-0.15)+(1.8+1.3+1.2+1.1)0.12(3-0.15)-0.82.10.243+0.92.10.243-(0.8+0.5)
11、3+(0.9+0.5)30.240.24m13.133序号项目名称计算部位计算规则及公式单位工程量1地面垫层混凝土量26-31轴房心净面积乘以垫层厚度=(4.8-0.24)(6.5-0.24)+(3-0.24)(6.5-0.24)+0.6(2.4-0.24)+(4.2-0.24)(6.3-0.24)+(3.9-0.24) (6.3-0.24)0.06=5.598 m3m5.5982基础的混凝土量26-31轴m26.8343j-126轴(2.42.4)0.3+(1.41.4)0.4 m32.5124j-226轴(1.81.8)0.3+(0.90.9)0.4m31.2975j-326轴(1.91.
12、9)0.3+(11)0.4m31.4836j-530轴(2.42.4)0.3+(1.31.3)0.4m32.4057j-630轴1.8(0.665+1.63+0.665)0.3 +0.8(0.265+0.3+1.305+0.30.265)0.4m32.3778j-730轴1.82.20.3+0.40.91.55+0.250.3(1.9-0.75)m31.8339j-8a轴23.80.3+1.12.9050.4+0.30.45(1.9-0.75)m33.55810j-1029轴3.32.60.3+1.81.60.4=3.726 m3m33.72611j-1129轴3.592.40.3+2.951
13、.50.4m34.45912j-15 d轴3.51.90.3+2.71.10.4m33.184 柱混凝土工程量 柱混凝土工程量=图示梁截面面积梁净长13柱砼的工程量一层26-31轴0.30.3104.6m4.1414kz929轴0.40.424.6m1.47215kz1727轴0.350.354.6m0.56416kz1027轴0.250.324.6m0.6917kz1128轴0.30.454.6m0.62118kz8d轴0.240.244.6m0.26519六层柱砼的工程量0.240.24532m1.728200.250.251132m4.125210.240.45332m1.944220.
14、250.3232m0.923gz1(0.2450.240.5+0.210.240.5)322m0.655024gz20.380.240.523m0.27425gz3(0.140.240.5)322m0.20226gza0.240.24+(0.2550.24+0.290.24)0.532m0.4527gzb0.290.2434+(0.2550.24+0.290.24)0.532m1.22828七层 d-21-31 右上侧柱砼的工程量0.240.2473m1.210290.250.2523m0.375300.120.123m0.136 梁混凝土工程量31kl2826-27轴(3-0.24)0.24
15、3m0.19932kl2729-30轴(1.8+1.2)0.240.6m0.39733ll529-30轴0.50.240.42m0.05834kl526轴1.920.30.7m0.40335kl2426-27轴3.240.30.8m0.77836ll2727-29轴2.040.120.5m0.12237kl427轴-f-k(1.4+2.1+6-0.24)0.30.8m0.92638kl1726-30轴(1.8+0.5+0.7+2.1-0.48)0.350.9m1.45539kl3d-f2.40.30.6m0.43240kl929-30轴1.10.120.5m0.06641ll2327-1/29
16、轴2.340.240.5m0.28142ll8d-f轴2.640.240.5m0.31743kl1425-30轴(4200-240+3900-1630-120)0.240.6m0.88044kl61/29轴1.560.250.7m0.27345ll328-31轴0.80.240.65m0.57646kl1728-30轴4.020.240.7m0.285447kl1525-28轴3.960.240.3m0.675 六层梁混凝土工程量48kl4926-27轴/5-6轴3.480.240.42m0.66849kl8024-27轴/6-8轴(2.2+3+0.24)0.250.32m2.72450kl8
17、526-27轴/5-6z后2.760.240.32m0.39851kl794-7轴/25-28轴4.320.240.32m0.62252kl67a-c轴1.560.240.42m0.3053kl654轴1.560.240.42m0.3054kl714-7轴/25-28轴3.960.240.42m0.7655ll4027-29轴/3-5轴2.040.120.52m0.24456kl35d-f轴1.420.120.52m0.17057ll31d-f轴2.640.150.52m0.39658kl4527-2/29轴1/2-4轴2.220.120.52m0.26659kl64c-d轴0.950.240
18、.42m0.36460kl5119-20轴3.120.240.42m0.60061ll5917-1/17轴1.420.120.52m0.17062kl8317-19轴2.220.2+0.52m0.44463kl8419-20轴2.760.240.32m0.39864kl8024-26轴2.680.250.32m0.40265ll551/e-f轴2.780.150.52m0.41866kl681/e-f轴1.920.120.32m0.13867ll561/e-1/c轴2.480.150.52m0.37268kl7818-21轴4.320.240.32m0.62269ll5716-18轴3.720
19、.20.52m0.74470kl6918-21轴1.560.240.42m0.3071kl7210-11轴3.960.240.42m0.7672ll3521-23轴3.360.240.22m0.32273ll3423-25轴3.360.240.22m0.322 六层梁混凝土工程量 26-31轴74kl2826-27轴(3-0.24)0.243m0.19975kl2729-30轴(1.8+1.2)0.240.6m0.39776ll5j-k轴0.50.240.42m0.05877kl5g-k轴1.920.30.7m0.40378kl2426-27轴3.240.30.8m0.77879ll2727-
20、29轴2.040.120.5m0.12280kl4f-k轴(1.4+2.1+6-0.24)0.30.8m0.92681kl1726-30轴(1.8+0.5+0.7+2.1-0.48)0.350.9m1.45582kl3d-f轴2.40.30.6m0.43283kl9d-1/e1.10.120.5m0.06684ll2328-2/29轴2.340.240.5m0.28185ll8d-f轴2.640.240.5m0.31786ll1828-30轴4.140.240.7m0.69687kl1425-30轴(4200-240+3900-1630-120)0.240.6m0.88088kl6a-c轴1.
21、560.250.7m0.27389ll32/29-31轴0.80.240.65m0.57690kl1728-30轴4.020.240.7m0.67591kl1525-28轴3.960.240.3m0.285 屋面梁混凝土工程量七 层 d-21-31 右下侧92ll9821-23轴6.440.20.3m0.38693ll7121-23轴1.220.120.154m0.08894ll70c-1/c轴3.150.036m0.11395ll8924-250.540.120.36m0.01296ll6825-28轴2.8250.120.32m0.20497ll6725-28轴1.20.120.3m0.0
22、4398ll6925-28轴7.9970.120.3m0.10299ll8725-28轴6.1040.06m0.259100kl9125-28轴6.1040.20.3m0.259101ll6328-306.1040.20.3m0.259102kl8828-2/29轴1.3750.120.3m0.062 基础圈梁混凝土工程量103dql26-31轴v=sh =(3+1.8+0.7+2.3+0.8+1+4.7+2.87+1.63+1.8+3.9+1.63+1.2+3.6+3.6+4.8+0.6+4.2+6.52+2.87) 0.240.24m3.456 阳台栏梁混凝土工程量104ytll全部v=(
23、4.2+0.24) 5(0.20.06+ 0.060.1+0.180.4)+(3+0.24)(0.20.06+0.060.1+0.180.4)m3.520 现浇楼板混凝土工程量 v=sh105lb一层26-31轴(6+2.04)(4.1+3.8+3.1+1.8+0.36)+0.722.64+(2.87+1.19)10.50.15-(4.2-0.24) (0.180.4+0.060.1+0.120.1) 2m15.748106lb六层全部10.6422.22-0.82.36+1.24.27+3.70.60.5+0.723.54+1.84.442+1.23.48-(5100-240)(2600-2
24、40)22m66.912107lb 七层 d-21-31 右上侧 板混凝土工程量(5.16.2+4.26.3+3.94.5)0.15-(0.59+0.59)2.281+(0.59+0.59)0.70.50.152m10.414108现浇构件12基础26-31轴t0.880109现浇构件钢筋6基础26-31轴t0.052110现浇构件钢筋12一层26-31轴t0.078111现浇构件钢筋14一层26-31轴t0.076112现浇构件钢筋16一层26-31轴t1.145113现浇构件钢筋18一层26-31轴t0.167114现浇构件钢筋20一层26-31轴t0.263115现浇构件钢筋6一层26-
25、31轴t0.387116现浇构件钢筋8一层26-31轴t1.145117现浇构件钢筋10一层26-31轴t0.388118现浇构件钢筋12六层全部t0.070119现浇构件钢筋14六层全部t0.359120现浇构件钢筋16六层全部t0.905121现浇构件钢筋6六层全部t0.188122现浇构件钢筋8六层全部t4.776123现浇构件钢筋10六层全部t0.73124现浇构件钢筋12七层 d-21-31 右上侧t0.161125现浇构件钢筋14七层 d-21-31 右上侧t0.121126现浇构件钢筋16七层 d-21-31 右上侧t0.262127现浇构件钢筋6七层 d-21-31 右上侧t1
26、.048128门窗工程量一层26-31轴六层全部七层 d-21-31 右上侧门窗工程量=图示面积数量129m27272.72.7429.16130c09150.91.51314.85131tc-1 (2.43+23)226.4132zc 0.81.55212133c1524 1.52. 427.21134c1515 1.51.5715.75135c1815 1.81.525.4136c21152.41.53.6137c18101.811.52.715138m0921 0.92.11222.68139m1421 1.42.1411.76140m1621 1.62.1413.44141m2724
27、2.72.4425.92142fm乙102112.148.4 防水、保温工程 设计总长度总宽度坡度系数+弯起部分(无规定时,伸缩缝、女儿墙的弯起部分按250mm计算,天窗按500mm计算)防水工程s= (38.7+4.810.4+0.62.4)1.06+2.127.8+5.567.26+3.767.26+0.483.16+3.967.06 +4.667.06+3.766.764+4.563.762+4.363.722+3.367.762+4.564.562 m2372.767地面防潮层一层26-31轴s=(4.8+3+1.2)(4.1+5.27+2.83+0.84)+0.62.64m2104.
28、861保温工程一层26-31轴六层全部七层 d-21-31 右上侧v=按设计图示面积乘以平均厚度以立方米计算=(1.19+2.3+4.2+10.4+8.4+11.6+6.5+4.09+3.6+3.95+2.095+10.55+10.8+10.1+13.1+7.6+10.55+2.19+6.5+2.9)3-1.52.42-0.91.58-1.51.82-2.72.44-1.51.56-2.21.52-0.81.58 30.03+8.1+5.1+3+3.95+5.1+10.55+1.89-1.811.5-2.11.52-0.91.5230.03 m3 9.758 构筑物及其它工程散水s=(l外+4
29、散水宽度-台阶、花坛等所占面积的长度) 散水宽度=(4.2+3.9+6.3+2.4+3.5+0.6+1.2+1.8+6+41.86) (0.6+1.5-0.24)m269.452 楼地面工程 一层26-31轴 六层全部 七层 d-21-31 右上侧水泥砂浆楼面s=(3.50.3+1.631.09+2.72 0.385+3.260.06+2.760.96+1.60.24+2.062.76+2.760.96+1.60.24+2.062.76+2.283.5+2.42.12+0.663.86+0.660.24+1.415.8+0.96.46+4.53.9+5.233.96+3.964.26+2.70
30、.24+3.961.56+4.063.36+1.880.66)2+7.264.723+3.961.56+0.90.24+1.631.09+2.720.385+4.263.66+3.964.26+0.90.24+5.4+3.960.75+2.41.4+2.733.26+3.262.76+5m2435.9水泥砂浆地面s=4.566.26+2.766.26+0.62.16+3.966.06+3.666.06 m2 93.293234踢脚线一层26-31轴六层全部七层 d-21-31 右上侧踢脚线工程量=踢脚线净长高度(3.5-0.24+2.55-0.12+7.76+0.995+0.3352+6.23
31、+5.662+4.705+3.962+3.36+4.06+2.28+10.8+3.5+2.32+10.81+1.162+11.54+3.96+6.04+9.24+3.062+4.842+3.66+16.6+0.76)0.15 23.255235外墙抹灰工程量=主墙间净长墙面高-门窗等面积+垛侧面抹灰面积7.92+9.1+6.54+8.22)3+252.405+72.87381.348236内墙抹灰一层26-31轴六层全部七层 d-21-31 右上侧s=(1.05+1.27+1.775-0.12+3.5-0.24+2.1-0.12+2.74+7-1.63+3.9-1.63+0.995+5.32+
32、3.74+2.04-0.8+4.6+3-0.24+6.7+6.6+3-0.24+4.74+4.2-0.24+6.8-0.24+3.24+7.4+3.6-0.24+9.4+0.9)(3-0.15)2-(1.21.5+1.5)2-0.81.55-1.52.42-1.51.82-2.72.44-1.51.56+(4.5-0.24+4.2-0.24+5.32+3.9-0.24+4.5-0.24+2.55+0.24+2.4+0.24+2.55+0.24+3.5-0.24+3-0.24+3.5-0.247+5.1)(3-0.15)-1.811.5-0.92.13-2.11.5-0.82.12-2.11.5
33、+(6.9-0.24)4+(7.8-0.48)22+0.62+(6.3-0.24)4+(8.1-0.48)2(3-0.15)-2.72.74-0.91.5m2802.467 顶棚工程238一般抹灰屋顶 d-21-31 右上侧s=(2.410.07+2.413.57+3.611.55+0.773.5) 1.06107.072 239木门表面涂油漆s=20.16+30.02 54.18240栏杆扶手(3.209+0.12)14+(4.2+1.682)5+(3-0.24)4m95.444241模版 工程量=构建的表面积242基础模板26-31轴工程量=构建的表面积76.811243j-126轴2.6
34、0.4+2.41.2+1.41.66.16244j-226轴(20.4+1.81.2+0.91.6)28.8245j-326轴2.10.4+1.91.2+1.64.72246j-530轴2.60.4+2.41.2+1.31.66247j-630轴5.160.2+4.760.6+3.2350.86.476248j-730轴4.60.2+4.20.6+2.450.85.4249j-8a轴6.20.2+5.80.6+3.0050.87.124250j-1029轴6.30.2+5.90.6+3.40.87.52251j-1129轴6.390.2+5.990.6+4.50.88.47252j128-29
35、-d轴5.161.26.192253j326-30-31轴6.1451.27.347254j4d轴3.250.82.6255柱模板一层26-31轴工程量=截面周长层高数量258.629256kz4一层26-31轴(0.3+0.3)104.627.6257kz929轴(0.4+0.4)24.67.36258kz1727轴(0.35+0.35)4.63.22259kz1027轴(0.25+0.3)24.65.06260kz1128轴(0.3+0.45)4.63.45261kz8d轴(0.24+0.24)4.62.208262六层柱模板263(0.24+0.24)53214.4264(0.25+0.
36、25)113233265(0.24+0.45)33212.42267(0.25+0.3)2326.6268gz1(0.24+0.095+0.145)44323.04269gz2(0.095+0.24+0.24+0.4+0.195)231.17270gz3(0.095+0.24+0.24+0.4+0.195)231.17271gza(0.1+0.24+0.14+0.28+0.24)236272gzb(0.175+0.24+0.55)23211.58 七层 d-21-31 右上侧 柱模板 273(0.24+0.24)7310.08274(0.25+0.25)2332750.120.1230.136
37、276梁模版工程量=(梁高-板厚)净跨长2+梁宽净长 一层粱模板 26-31轴277kl2926-30轴7.0820.6+7.080.24m210.195278kl2826-27轴2.760.32+2.760.24m22.318279kl2729-30轴2.7620.6+2.760.24m23.974280ll5j-k轴1.21.2+0.60.242m21.728281kl2426-27轴2.7620.6+2.760.25m24.002282kl5g-k轴1.5620.7+1.560.3m22.652283kl4f-k轴3.8620.7+3.860.3m26.562284kl1726-30轴7
38、.0820.9+7.080.35m215.222285ll8d-f轴2.6420.5+2.640.24m23.274286kl19d-1/e轴1.220.8+1.20.3m22.28287ll211/2-4轴3.4820.5+3.480.24m24.315288ll1828-30轴4.0220.7+4.020.24m26.593289kl1425-30轴7.6220.6+7.620.24m210.973290kl1625-28轴3.960.32+3.960.24m23.168291kl1728-30轴3.6620.7+3.660.24m26.002292ll62/29-30轴1.40620.7
39、+1.4060.24m22.306293ll42/29-30轴2.2820.6+2.280.24m23.529294ll2a-1/c轴1.41420.65+1.4140.245m210.181295ll14(a)a-1/c轴0.390.62+0.390.24m20.562 七层粱模板296ll602-3轴2.760.6+2.760.242m24.636297ll403-5轴2.041.122m24.57298ll31d-f轴2.641.152m26.072299kl33d-1/e轴2.20.5+1.10.122m22.464300kl441/2-4轴4.20.5+2.10.122m24.704
40、301kl64c-d轴4.50.242m29.36302kl742-4轴3.90.7+3.90.242m24.332303kl495-6轴2.761.042m25.74304kl805-8轴5.440.852m29.248305kl855-6轴2.760.842m24.636306kl762/2-7轴3.960.842m26.652307ll347-9轴6.440.642m28.244308kl66a-c21.561.042m26.49309kl7211-14轴3.961.042m28.236310kl5012-13轴31.042m26.24311kl8112-13轴2.760.842m24.
41、636312ll582/14-15轴1.31.122m22.912313ll551/f-e轴2.541.152m25.842314kl821/14-15轴2.221.22m25.328315kl68e-f轴1.420.722m22.044316ll56e-1/c轴2.481.152m25.704317kl7711-14轴5.960.862m210.012318kl7211-14轴3.961.042m28.236 屋顶粱模板 七层 d-21-31 右上侧319ll6122-24轴420.72m21.444320ll721/e-2/f轴2.70.72m21.944321ll11322-24轴2.8
42、40.8m22.272322ll10722-24轴2.840.8m22.272323kla25-26轴2.760.51m21.408324klwf-2/f轴21.040.48m20.998325ll4027-29轴2.041.12m22.285326ll11727-30轴2.4860.72m23.366327kl8629-30轴2.4860.72m23.366328ll11629-30轴3.240.8m22.592329ll108d-f轴1.870.724m21.418330ll104d-f轴0.32+0.12m20.72331kl87f-2/f轴2.640.72m21.901332ll64d-f轴1.340.72m20.965333kl10828-1/29轴1.61.12m21.172334kl10928-1/29轴4.0770.72m22.935335kl7924-30轴10
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024-2030年中国复合介质电容行业市场运营模式及未来发展动向预测报告
- 湄洲湾职业技术学院《国际商务》2023-2024学年第一学期期末试卷
- 眉山职业技术学院《大数据技术导论》2023-2024学年第一学期期末试卷
- 2024年智能机器人研发生产销售合同
- 2024年新一代云计算数据中心建设合同
- 纸尿裤的广告(完整版)
- 马鞍山师范高等专科学校《微课设计与教学实践》2023-2024学年第一学期期末试卷
- 吕梁学院《机械基础》2023-2024学年第一学期期末试卷
- 2024年版企业破产重整合同
- 2024年度无息个人婚礼筹备借款协议书下载3篇
- 【MOOC】法理学-西南政法大学 中国大学慕课MOOC答案
- 辽宁省普通高中2024-2025学年高一上学期12月联合考试语文试题(含答案)
- 储能运维安全注意事项
- 2024蜀绣行业市场趋势分析报告
- 电力法律法规培训
- 北京交通大学《成本会计》2023-2024学年第一学期期末试卷
- 2024年世界职业院校技能大赛“智能网联汽车技术组”参考试题库(含答案)
- 【课件】校园安全系列之警惕“死亡游戏”主题班会课件
- 化工企业冬季安全生产检查表格
- 2024年工程劳务分包联合协议
- 蜜雪冰城员工合同模板
评论
0/150
提交评论