1、2010建筑法规真题(2010 building regulations Zhenti)This provision is part of the safeguards for safety in production.A. organizational safeguardsB. management safeguardsC. economic support measuresD. technical support measures15. after the written bid evaluation report is made, the winning bidder shall be
2、determined.A. bid evaluation committeeB. tendereeC. tendering agencyD. tendering and bidding administration16. according to the Regulations safety production management of construction project, the construction supervision unit shall review the construction organization design of safety technical me
3、asures or special construction plan is in accordance with the construction standards and mandatory (standard).A. construction units requiredB. supervision units formulatedRecommended for C. engineering constructionD. engineering construction industry17. If the general contracting of the project is c
4、arried out, the insurance for the accidental injury of the subcontractor shall be paid by ().A. construction unitB. general contractor unitC. subcontracting unitsD. general contracting and subcontracting units jointly18. in the construction site installation and disassembly, lifting machinery, lifti
5、ng scaffolding, formwork and other self lifting erection facilities must be undertaken by ().A. general contractor unitB. subcontractors using equipmentC. units with corresponding qualificationsD. equipment rental unit19. in the following options, the safety production conditions that should be poss
6、essed by the construction enterprises in obtaining the safety production license are ().A. has obtained the construction project planning permit in the urban planning area construction projectB. in accordance with the law to participate in industrial injury insurance, according to the law for the co
7、nstruction site to engage in dangerous operations for accident insurance, insurance premiums for employeesC. construction site has basically the construction conditions, the need for demolition, and its demolition progress in line with construction requirementsD. has specific measures to ensure the
8、quality and safety of the project20. according to the regulations of the safe production license, the period of validity of the safety production license is () year.A.1B.2C.3D.421. a safety accident occurred at a construction site, resulting in 3 deaths. According to the regulations on the productio
9、n safety accident report and the investigation and handling regulations, the accident belongs to ().A. is especially importantB. majorC. largerD. some22., according to the construction quality management regulations, the project contracting units in () should be issued to the construction unit quali
10、ty warranty book.A. project price settlement completedB. construction completedC. submit project completion acceptance reportD. qualified for final acceptance23. a project design document needs major modifications, ().A. design units should be in consultation with the construction units, can be used
11、 after modificationThe B. design unit can be modified directlyC. shall be submitted to the original examination and approval authorities for approval by the construction unitsD. must open the expert after the demonstration, the design unit may reviseThe provisions of the new technology and the exist
12、ing mandatory standard 24. construction project of a construction unit to be used shall be inconsistent, () organize special technical demonstration, examination and approval and approval of the construction standard of the administrative department or the relevant authorities under the state counci
13、l.A. construction unitB. construction unitC. supervision unitD. design unit25. by the State Council, construction, railways, transportation, water conservancy and other administrative departments to examine and approve, the number and standards issued are ().A. national standardsB. industry standard
14、sC. local standardsD. enterprise standards26. in the city within the city, machinery and equipment used in the construction process, may produce environmental noise pollution, the construction units in the project must be started before the date of declaration () to the local government and engineer
15、ing personnel above the competent administrative department of environmental protection.A.10B.15C.20D.3027., the following statements about building energy efficiency, the error is ().A. enterprises can formulate standards of enterprise energy conservation which are stricter than the national standa
16、rdsB. the State implements energy conservation assessment and review system for fixed assets projectsC. projects that do not meet mandatory energy conservation standards shall not be startedD. the competent construction Department of the provincial peoples Government may formulate standards for loca
17、l building energy conservation below the industry standards28. the construction unit shall submit the fire control design drawings and relevant data to the construction project for examination and approval, and the construction license shall not be issued without the approval or failure of the exami
18、nation and approval, and the construction unit shall not start the work.A. construction administration departmentB. public security fire fighting organizationC. safety production supervision departmentD. planning administration department29. the labor dispute mediation committee of a construction en
19、terprise shall be composed of ().A. legal representatives of the enterprises and representatives of the labor administrative departmentsRepresentatives of trade union representatives and labor administration departments of B. EnterprisesEmployee representatives and business representatives of C. Ent
20、erprisesRepresentatives of workers and staff, representatives of enterprises and labor administration departments of D. Enterprises30. A and a construction enterprise signed a labor contract, and its labor contract for 6 months, then a probation period should be in () during the period to determine.
21、A.15 dayB.1 monthsC.2 monthsD.3 months31., non full time labor remuneration settlement payment cycle is the longest ()A.7 daysB.15 daysC.20 daysD.30 days32. mandatory standards for construction are to be explained by.A. General Administration of quality supervision, inspection and quarantineB. admin
22、istrative department for construction of the State CouncilC. administrative department in charge of construction of Provincial Peoples GovernmentD. engineering construction standards approval department33., according to the law on the administration of tax collection, the tax authorities may, from t
23、he date of tax arrears, receive a late payment tax due to the overdue tax payment.A. 5/10000B. 5/1000C. 3/10000D. 3/100034. of the following options, the parties shall bear tort liability is ()The collapse of the tower crane at the A. site caused the collapse of the adjacent housesB. a construction
24、unit fails to complete the project within the time limit as stipulated in the contractC. cause damage to the project by typhoonD. quality problems exist in a project35., in accordance with the provisions of the administrative penalty law, may (except) set restrictions on personal freedom other than
25、administrative penalties.A. lawB. administrative regulationsC. department regulationsD. local regulations36. according to the contract law, the construction contract does not belong to ().A. bilateral contractB. paid contractC. practice contractD. contract37., from the nature, construction enterpris
26、es bidding behavior belongs to ().A. offerB. offer invitationC. commitmentD. inquiry38. in the following options, there is no commitment to withdraw the validity of the case is ().A. notice of withdrawal of acceptance reaches the offeror before the acceptance notice reaches the offerorB. the notice
27、of acceptance of the withdrawal of acceptance and the notice of acceptance arrive at the offeror at the same timeC. the notice of withdrawal of the acceptance reaches the offeror after the acceptance of the notification reaches the offerorD. the notice of withdrawal of the acceptance reaches the off
28、eror before the contract is established39., the difference between the liability for breach of contract and the liability for breach of contract is mainly as followsA. the former arises at the contract stage, the latter in the performance of the contract stageB. the former must be subjective and the
29、 latter subject to subjective negligenceC. the former is tort liability, and the latter is contractual liabilityD. the former does not require agreement, the latter must have an appointment40. construction units need a large amount of steel due to construction and send an offer to the supplier,The d
30、elivery within a month, but the number of pending, said the letter B within one month can supply 2000 tons of goods, a said no, the following statements are correct ().A. the contract of supply was establishedB. the contract of supply has come into effectC. the contract of delivery is a specific one
31、D. the supply contract has not been established41. a construction company from the city to the field of construction engineering of lease template, after the construction, because of that template shipped back to the high cost, the construction company will handle the batch template without authoriz
32、ation, after the company agreed to lease the batch template sold the construction company, the construction company to deal with the batch template (behavior)A. invalidB. validC. potency specificD. failure42., the contract between Party A and Party B, when Party A delivers the 20% earnest money, the
33、 purchase contract becomes effectiveA. contract with effect timeB. contract with valid conditionsC. contracts subject to terminationD. contract with termination timeAgreement of 43. between the construction unit and the suppliers of building materials procurement contract, during the completion of t
34、he project to pay for materials, within 1 months after the acceptance of the construction unit, its business has seriously deteriorated by supplier, suspend the supply of building materials, require the first payment, or terminate the delivery, the suppliers behavior belongs to (exercise)A. concurre
35、nt defenseB. right of first performance defenseC. uneasy right of DefenseD. pre plea right44. in accordance with the contract law, the obligee shall exercise the right of rescission from the date when he knows or ought to know the cause of the revocation.A.1B.2C.5D.2045., according to the contract l
36、aw, the parties concerned are not clear about the contents of the contract changes and shall be presumed to beA. changeB. re agreementC. changes in principleD. not changed46. the termination of the rights and obligations of the contract does not affect the validity of the terms in the contract.A. pe
37、rformance timeB. place of performanceC. dispute resolutionD. quality inspection47., the parties have agreed liquidated damages, but also agreed to deposit, one party default, the other party () terms.A. should apply Liquidated DamagesB. deposit should applyC. may apply for breach of contract damages
38、 or depositD. may apply both liquidated damages and deposit48. the main creditors right and debt contract is invalid, the guaranty contract (except the law).A. is still validB. invalidC. is valid during the warranty periodD. effect pending49. the following is not a civil dispute, the way to deal wit
39、hA. the parties settle themselvesB. administrative reconsiderationC. administrative mediationD. commercial arbitration50. the following disputes or disputes shall apply to the arbitration law, and the adjustment shall be as followsA. disputes over property successionB. labor disputesC. marriage disp
40、uteD. project disputes51. in the following options, the understanding of mediation is wrong ()Where a A. party has made an out of court settlement, he may request the court to make a conciliation statementB. arbitration mediation takes effect after it has become effectiveThe arbitration award may be
41、 arbitrated after the decision of the C. arbitration award has come into forceThe D. court cannot produce conciliation papers when it is enforced52. in civil proceedings, the fact that the parties do not need to use evidence to prove is ().A. requests entity rights and interestsB. absolve oneself fr
42、om legal liabilityC. advocates procedural violationsD., the other side admitted53. in accordance with the guarantee law, the third party must provide the form of security for (or) the parties concernedA. guaranteeB. mortgageC. lienD. deposit54., civil litigation is an important way to resolve disput
43、es over construction projects, which are not included in the civil proceedingsA.Party representativeB. third peopleC. appraiserD. attorney55. if a party or interested party considers that the execution procedure of the peoples court violates the provisions of the law, it may make a written objection
44、 to (or) the peoples courtA. original trialB. is responsible for the implementation ofC. the plaintiffs locationD. the defendants location56. the parties have objections to the validity of the arbitration agreement, and if one party requests the Arbitration Commission to make a decision and the othe
45、r party requests the peoples court to make a ruling, the party shall make the decisionA. decision of the Arbitration CommissionB. intermediate peoples court ruling on the performance of the contractC. the ruling of the intermediate peoples Court of the defendants localityD. the intermediate peoples
46、Court of the locality of the Arbitration Commission shall rule57. of the following options does not belong to the formula contractA. construction engineering design contractB. loan contract between enterprises and banksC. guarantee contract between legal personsD. a loan contract between natural per
47、sons58. if the party applies for the revocation of the arbitration award, he shall bring it up within the period from the date of receipt of the awardA. three monthsB. six monthsC. a yearD. two years59. within the scope of the project which must be carried out according to law, for the contract of s
48、upervision and supervision, the minimum amount of the individual contract is estimated to be above RMB 10000 yuan, and the bidding must be carried out.A.50B.100C.150D.20060. in the course of construction, the matter to be signed by the chief supervision engineer shall be ()A. building materials appr
49、oachB. installation of building equipmentC. concealed project acceptanceD. final acceptance of the projectTwo, multiple-choice questions (20 questions, 2 points for each question, options for each question, there are 2 or 2 or more to do. There are at least 1 errors. The choice is not scored; the ch
50、oice is 0.5 points per choice61. in accordance with the provisions of the contract, the construction contract stipulated that the exemption from the responsibility is due to the clause, and the exemption clause is invalidA. contract performance only benefit from the other partyB. Force Majeure cause
51、s loss of property to the other partyC. performing the contract causes personal injury to the other partyD. the other party fails to fulfill its contractual obligations and causes lossesE. intentionally or negligently resulting in loss of property to the other party62. construction project completio
52、n acceptance should have () and other conditionsA. complete technical documentation and construction management informationB. main construction materials, building structures, fittings and equipmentQuality qualification documents signed by C. survey, design, construction, supervision and other units
53、D. has paid all the moneyE. the construction contract signed by the construction unit63. construction projects need to be built in conjunction with environmental protection facilities, and must be concurrent with the main projectA. project approvalB. approvalC. designD. constructionE. put into opera
54、tion64. in accordance with the provisions of the labor contract law, the following is the case that the employing unit shall not terminate the labor contractA. in the unit suffering from occupational diseases confirmed part of the loss of labor capacityB. has been working in this unit for 15 years a
55、nd is less than 5 years from the statutory retirement ageC. working families have no other employees and have dependantsD. female workers are in confinementE. was certified disabled because of a work-related injury65. the following acts of collusive bidding among bidders are ()A. the tenderee opens
56、the tender document before opening the bid, and informs the other bidders of the other bidsB. the bidders agree on each other and offer them at high, medium and low prices in the bidding projectC. bidders submit false performance certificates at tenderD. the bidder agrees with the tenderee to lower the bid price during the voting,Additional compensation will be given to the bidder after winning the bidE. the bidder shall not
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024马脑山养殖户合同
- 2024楼顶广告牌安装合同范本
- 房产交易资金托管服务合同
- 社区环境卫生维护合同
- 授权经营合同范本
- 房屋建筑工程协议2024年
- 标准伤残赔偿协议书参考
- 2023年高考地理第一次模拟考试卷-(广东B卷)(考试版)A4
- 【人教版系列】四年级数学下册全册专项测评(含答案)
- 关于离婚协议书的撰写指南
- 生态文明学习通超星期末考试答案章节答案2024年
- 区病案质控中心汇报
- 期中测试卷(1-4单元)(试题)2024-2025学年四年级上册数学人教版
- 教育局职业院校教师培训实施方案
- 《万维网服务大揭秘》课件 2024-2025学年人教版新教材初中信息技术七年级全一册
- 2024年新华社招聘应届毕业生及留学回国人员129人历年高频难、易错点500题模拟试题附带答案详解
- 人教版(2024新版)七年级上册英语Unit 5单元测试卷(含答案)
- (完整版)新概念英语第一册单词表(打印版)
- 美食行业外卖平台配送效率提升方案
- 中国民用航空局信息中心招聘笔试题库2024
- 芯片设计基础知识题库100道及答案(完整版)
评论
0/150
提交评论