全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Rock Drilling And Jaw Crusher ProfileEdited by Alan L. HitchcoxRock drilling is all about power and speed. You need a lot of power to break into solid rock and high speed to repeatedly hammer away at a work site. For safety and high productivity, many of todays machines feature remote control. This presents a challenge because the remote control must be easy to operate yet allow full functionality of the machine.Top hammer percussive drilling the most common method for drilling holes up to 140 mm diameter hammers the rock with impacts transferred from the rock drill to a drill bit in the bottom or a hole. Hydraulic pressure generates the force required pressure builds to a maximum and when released, drives an impact piston forward. When the piston strikes a chuck, it transfers its kinetic energy as a stress wave through a drill rod to the drill bit, which uses this impact energy to pulverize the rock. Obtaining the highest drilling productivity and economy requires operation of all components in the system to be highly synchronized.Design criteriaWhen designing the hydraulic system for a rock drill rig, the operator must be given complete and independent control of the key parameters percussion pressure, percussion frequency, feed force, and rotation to achieve optimum drilling efficiency. When all of these parameters are optimized to suit working conditions, the drill bit has full contact with the rock and the shock wave captures maximum kinetic energy to ensure that each impact achieves high productivity.Although the design of the machine itself accounts for much of the machines productivity, achieving maximum productivity to meet cost targets requires a well-engineered hydraulic system with components that can maintain high reliability even in the face of frequent heavy impacts. Furthermore, a precise remote control is needed to achieve the high synchronization necessary for maximum productivity. Remote control also provides higher visibility, controllability, and safety than machine-mounted controls. It also lends itself to data acquisition to monitor operation and aid in improving future design of machines.Nimco Controls AB, Malmo, Sweden, developed a system to meet these criteria indrill rigs manufactured by KG Mekaniska AB, Karl Gustav, Sweden. The electrohydraulic system integrates the features of Nimcos Easy- Prog CANbus-based remote-control system with its CV 2000 LS series pressure-compensated valve. As a result, drill rigs have produced optimal results over the last two years.The electrohydraulic system consists of a variable-displacement pump with load sensing to improve energy efficiency of the system, the CV 2000 LS pressure-compensated valve, and the EasyProg CANbus system. Designers also made an effort to reduce the amount of hydraulic hose in the machine. Not surprisingly, then, the new design contains about 13 less hose.Component detailsThe CV 2000 LS valve can accommodate a flow of 125 lpm to each cylinder port and is designed to work with both fixed- and variable-displacement pumps. Work port flow is controlled by 12- or 24-V proportional solenoids, with manual hand lever override functions available. Pressure limiters can be fitted on each individual work port together with shock and/or anticavitation valves.The EasyProg control is a PC-based system that can be programmed in modules; hardware can also be built in modules to suit requirements of the application. Its CANbus configuration allows for digital and analog inputs and outputs. It features an easy-to-use menu for entering all settings and standard functions. Automatic functionsfor drill rigs, for example, enhance the speed of parameter settings as well as ensure specific safety parameters.The CV 2000 LS valve controls key rock drill operating functions, such as percussion pressure and frequency, rotation torque, and feed force. It also controls track drives, positioning, and a hydraulic fan drive.The rock drill in actionTo achieve the best combination of productivity and economy, the operator sets the percussion pressure and frequency, and the control sets rotational speed according to set frequency. The final setting is feed force which is set against the percussion pressure to position the drill bit close to the rock. These settings are all maintained by the CV 2000 LS valve, which has two compensators per spool section one for each cylinder port.Hydraulic settings are made via the EasyProg electrical remote control unit. Feed force is remotely controlled by the CV 2000 LS pressure compensator through a pilot-operated, electrically controlled proportional relief valve. This enables a continuous setting of the feed force while maintaining the possibility of a second pressure limiter working as an overpressure cutoff valve. The design enables two pressure limiters for one cylinder port and extremely fine, stable pressure control.The valves compensators exhibit flat flow/pressure curves and provide a constant flow, regardless of load pressure. The frequency and rotation of the drill bit is harmonized with the precise pressure setting for the feed force. The PL-2000 pressure limiters distinct pressure cut-off point ensures that the correct flow is maintained throughout the entire pressure range.The EasyProg drill rig version software has automatic setting functions to helpthe operator reduce initial setup time. It also contains maintenance and service frequency options that can be accessed remotely by OEMs through a GSM unit that vcan be connected to any mobile phone. Additional functions and portable remotecontrol units can be integrated either by wire or by Bluetooth, which, in the new version, has a range of 100 m.Recently, we have talked about rock drilling , the general mining machinery. Ofcourse, there is just a simple talk. So that we have to understand. Next, I introducea further, the mining machinery in the other a mechanical - jaw crusher.The BR550JG-1 jaw crusher from Komatsu America International Co. includes fully hydraulic tracked travel and crushing systems. Powered by Komatsus 306-hp SAA6DI25E-2 engine, this crusher has a material-output range from 110 to 507 tons per hour, with adjustable open-side discharge settings from 2.2-to8-in.Thesecapacities make the machine suitable for highway construction, housing development, and tunnel works, as well as quarry, demolition, and excavation applications.The 52-ton self-propelled crushers high travel speeds (with a maximum ofapproximately 2 mph), along with its 25% gradeability, allow efficient relocation. And once relocated, it can maneuver itself into tight quarters and start to operateimmediately, processing a variety of materials including concrete debris and hardrock.The Komatsu designed and built 30- x 44-in., single-toggle jaw is driven hydraulically with a PC800 LSHT variable-displacement motor via a V-belt. Its speed range from 210 to 300 rpm helps to adjust the jaw to the materials to be crushed. The closed-loop crusher control incorporates Komatsus patented Hydraumind technology to optimize efficiency. Through a combination of load-sensing and pressure-compensated valves, the HydrauMind hydraulic control and monitoring system supplies the appropriate flow of oil to each function. Simultaneously, it identifies potential overloads and automatically slows down the vibratory grizzly infeeds gear-type motor before the overloads become a reality. A pressure dial on the control can be set for anticipated rock hardnesses to work hand in hand with the Hydraumind system. The hydraulic design also allows the crusher to start from a stopped position, even when fully loaded, and it has a reverse-rotation function to help remove brid
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 环保公司解除租赁协议
- 污水处理招投标委托书范例
- 农业物流服务合同管理指南
- 文化产业严禁参与盗版侵权承诺书
- 公共广场地砖铺设合同
- 建筑加固改造升级劳务协议
- 上海市工业园区基础设施施工合同
- 医疗机构用工规范承诺书
- 石油开采设备日常养护管理办法
- 渔业捕捞与加工合同
- 吉林省吉林市2025届高三上学期一模历史试卷
- 公司网络安全制度
- 期中测试卷(1~4单元)(试题)-2024-2025学年数学六年级上册北师大版
- 跨学科主题学习- 探索外来食料作物传播史(课件)七年级地理上册同步高效备课课件(人教版2024)
- 学校编制外临时代课教师聘用管理办法
- 2016沪S204排水管道图集
- 2024-2025学年小学劳动五年级上册人教版《劳动教育》教学设计合集
- 南京市江宁区2023-2024三年级数学上册期中试卷及答案
- 期中试题-2024-2025学年统编版语文三年级上册
- 2024年全国高考数学试题及解析答案(新课标Ⅱ卷)
- 计算机应用基础课件教学
评论
0/150
提交评论