厂家提供的扬克汽缸运输指引YANKEE PROCESS MAPTransportation扬克汽缸搬运示意图Yankee Transport data:以下为搬运过程中使用的各种数据Yankee transport skid:扬克搬运机PRELIMINARY:准备工作Measures 规格 18 ft mmShell length:壳长 3530A 3860 ML+330B 4520 ML+990C 6430 ML+2900D 670E 5580 + 93F 2780 /2+36,5G 2800 /2+56,5Transport weight gross,w/o bearings, (approx.) 81 t搬运总重量约81吨(不包括轴承重量)6.3 Site transportation:工厂搬运Before beginning transport, prepare the hauling paths and define the degree to which the machine hasto be dismantled together with the ANDRITZ erector-in-charge responsible for the work.搬运前,应准备好运输路线,并和公司安装人员一起确定机器需拆开的程度。6.4 Uncovering, Lifting and Installation拆除包装、吊举和安装工作The following preparations should be made before mounting the bearing assemblies.下列4项工作应在安装轴承前准备完毕。Step Activity步骤 准备工作1: Place Yankee complete with transport frame (1) on a suitable level assembly area. (Ifthere is enough space available, the bearings can be mounted directly, with the Yankeestill on the flat-bed trailer.) 将扬克汽缸放在搬运架(1)上,并放置于一个适合安装场地。(如果场地足够,可在平板拖车上直接安装轴承)2 Set up frame for mounting bearings on the operator and drive sides. 在操作前准备好轴承。3 Remove safety plate (2) and wooden furring strips (3) from the journal. 从轴颈处取下安全板(2)和木条(3)4 Remove the preserving agen

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论